23
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

A conceptual framework for shopfloor production activity control

&
Pages 357-369 | Published online: 03 Apr 2007

References

  • ARCHIMEDE , B. , 1991 , Conception d'une architecture reactive, distribute et hierarchisee pour le pilotage des systemes de production . PhD thesis , Universite de Bordeaux 1 ,.
  • BAUER , A. , BOWDEN , R. , BROWNE J. , DUGGAN J. , and LYONS , G. , 1991 , Shop Floor Control Systems, from Design to Implementation ( Chapman & Hall , London ).
  • BEL , G. , 1991 , Rapport introductif du theme “Pilotage et gesuon d'atelier” . Cotloque Actions de Recherche en Robotique et Productique du MRT , Paris , pp. 551 – 562 .
  • BROWNE , J. , HARHEN , J. , and SHIVAN , J. , 1988 , Production Management Systems: A CIM Perspective ( Addison Wesley , London ).
  • COLEMAN , D. , ARNOLD , P. , BODOFF , S. , DOLLIN , C. , GILDCHRIST , F. , HAYES , F. , andjEREMAES , P. , 1994 , Object-Oriented Development- The Fusion Method ( Prentice Hall , Englewood Cliff , NJ ).
  • COPAS, C,BROWNE,J., 1990 , A rules-based scheduling system for flow type assembly . International Journal of Production Research , 28 , 981 - 1005 .
  • DOUMEINGTS , G. , VALLESPIR , B. , DARRJCAU , D. , and ROBOAM , M. , 1987 , Design methodology for advanced manufacturing systems . Computers in Industry , 9 ,, 271 – 296 .
  • DUFFIE , N. , and PiPER , R. , 1986 , Non-hierarchical control of a flexible manufacturing cell . Proceedings of the International Conference on Intelligent Manufacturing Systems , Budapest .
  • ERSCHLER , J. , ROUBELIAT , F. , and VERNHES , J. P. , 1976 , Finding some essential characteristics on the feasible solutions for a scheduling problem . Operations Research , 24 , 363 – 378 .
  • FOX , M. S. , 1981 , An organizational view of distributed systems . IEEE Transaction on Systems, Man, and Cybernetics , SMC- 11 , 70 – 80 .
  • HIGGINS , P. , and BROWNE , J. , 1990 , The monitor in production activity control systems . Production Planning and Control , 1 , 17 – 26 .
  • HUGUET , P. , and GRABOT , B. , 1994 , Production activity control system specifications object oriented analysis and knowledge-based system approach . 10th ISPE/IFAC International Conference on CADI CAM, Robotics and Factories of Future , Ottawa , 21 – 24 August , pp. 395 – 400 .
  • HYNYNEN , J. , 1988 , A framework for coordination in distributed production management . PhD thesis , Helsinki University of Technology .
  • JONES , A. , and SALEH , A. , 1990 , A multi-level/multi-layer architecture for intelligent shopfloor control . International Journal of Computer Integrated Manufacturing , 3 , 60 – 70 .
  • LYONS , G.J. , DUGGAN J. , and BOWDEN , R. , 1990 , Project 477 Pilot implementation of a production activity control (PAC) system in an electronics assembly environment . International Journal of Computer Integrated Manufacturing , 3 , 196 – 206 .
  • MEUVYK , S. A. , and CARTER , P. L. , 1986 , Identifying the principles of effective production activity control . 29th International Conference of American Production and Inventory Control Society , St. Louis , MO , pp. 227 – 232 .
  • ROHLOFF , M. , 1993 , Design of a decentralized production management system based on an object oriented approach . In Pappas and Tatsiopoulous (eds) Advances in Production Management Systems ( Elsevier , Amsterdam ), pp. 585 – 597 .
  • VAN DER PLUYM , 1990 , Knowledge-based decision making for job-shop scheduling . International Journal of Integrated Manufacturing , 3 , pp. 354 – 363 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.