Selecting optimum maintenance activity plans by a unique simulation-multivariate approach

, &
Pages 222-236 | Received 13 Feb 2013, Accepted 26 Nov 2014, Published online: 05 Mar 2015

References

  • Agarwala, R., V. Bafna, M. Farach, M. Paterson, and M. Thorup. 1998. “On the Approximability of Numerical Taxonomy (Fitting Distances by Tree Metrics).” SIAM Journal on Computing 28 (3): 1073–1085. doi:10.1137/S0097539795296334.
  • Azadeh, A., M. Saberi, M. Anvari, and H. Izadbakhsh. 2009. “A Meta Heuristic Approach for Performance Assessment of Production Units.” Expert Systems with Applications 36: 6559–6569. doi:10.1016/j.eswa.2008.07.079.
  • Azadeh, A., M. Sheikhalishahi, and S. M. Asadzadeh. 2011. “A Flexible Neural Network-Fuzzy Data Envelopment Analysis Approach for Location Optimization of Solar Plants with Uncertainty and Complexity.” Renewable Energy 36: 3394–3401. doi:10.1016/j.renene.2011.05.018.
  • Azadeh, A., M. Sheikhalishahi, M. Firoozi, and S. M. Khalili. 2013. “An Integrated Multi-Criteria Taguchi Computer Simulation-DEA Approach for Optimum Maintenance Policy and Planning by Incorporating Learning Effects.” International Journal of Production Research 51 (18): 5374–5385. doi:10.1080/00207543.2013.774496.
  • Azadeh, A., M. Sheikhalishahi, S. M. Khalili, and M. Firoozi. 2014. “An Integrated Fuzzy Simulation–Fuzzy Data Envelopment Analysis Approach for Optimum Maintenance Planning.” International Journal of Computer Integrated Manufacturing 27 (2): 181–199. doi:10.1080/0951192X.2013.812804.
  • Azadeh, M. A., S. Ghaderi, and A. Maghsoudi. 2008a. “Location Optimization of Solar Plants by an Integrated Hierarchical DEA PCA Approach.” Energy Policy 36: 3993–4004. doi:10.1016/j.enpol.2008.05.034.
  • Azadeh, M. A., S. F. Ghaderi, and H. R. Izadbakhsh. 2008b. “Integration of DEA and AHP with Computer Simulation for Railway System Improvement and Optimization.” Applied Mathematics and Computation 195 (2): 775–785. doi:10.1016/j.amc.2007.05.023.
  • Banker, R. D., A. Charnes, and W. W. Cooper. 1984. “Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis.” Management Science 30: 1078–1092. doi:10.1287/mnsc.30.9.1078.
  • Bates, A. D., M. H. O’Dea, and M. Gellert. 1996. “Energy Coupling in Escherichia coli DNA Gyrase: The Relationship between Nucleotide Binding, Strand Passage, and DNA Supercoiling.” Biochemistry 35: 1408–1416. doi:10.1021/bi952433y.
  • Berrichi, A., L. Amodeo, F. Yalaoui, E. Chatelet, and M. Mezghiche. 2009. “Bi-Objective Optimization Algorithms for Joint Production and Maintenance Scheduling: Application to the Parallel Machine Problem.” Journal of Intelligent Manufacturing 20: 389–400. doi:10.1007/s10845-008-0113-5.
  • Berrichi, A., F. Yalaoui, L. Amodeo, and M. Mezghiche. 2010. “Bi-Objective Ant Colony Optimization Approach to Optimize Production and Maintenance Scheduling.” Computers and Operations Research 37 (9): 1584–1596. doi:10.1016/j.cor.2009.11.017.
  • Bessent, A., and W. Bessent. 1980. “Determining the Comparative Efficiency of Schools through Data Envelopment Analysis.” Educational Administration Quarterly 16: 57–75. doi:10.1177/0013161X8001600207.
  • Cassady, C. R., and E. Kutanoglu. 2005. “Integrating Preventive Maintenance Planning and Production Scheduling for a Single Machine.” IEEE Transactions on Reliability 54 (2): 304–309. doi:10.1109/TR.2005.845967.
  • Charnes, A., W. Cooper, and E. Rhodes. 1978. “Measuring the Efficiency of Decision-Making Units.” European Journal of Operational Research 2: 429–444. doi:10.1016/0377-2217(78)90138-8.
  • Chootinan, P., A. Chen, M. R. Horrocks, and D. Bolling. 2006. “A Multi-Year Pavement Maintenance Program Using A Stochastic Simulation-Based Genetic Algorithm Approach.” Transportation Research Part A 40: 725–743.
  • Dekker, R. 1996. “Applications of Maintenance Optimization Models: A Review and Analysis.” Reliability Engineering and System Safety 51 (3): 229–240. doi:10.1016/0951-8320(95)00076-3.
  • Fare, R., S. Grosskopf, and D. Tyteca. 1996. “An Activity Analysis Model of the Environment Performance of Firms: Application to Fossil-fuel-fired Electric Utilities.” Ecological Economics 18: 161–175.
  • Farrell, M. J. 1957. “The Measurement of Productive Efficiency.” Journal of the Royal Statistical Society. Series A (General) 120: 253–281. doi:10.2307/2343100.
  • Ganley, J., and J. Cubbin. 1992. Public Sector Efficiency Measurement: Applications of Data Envelopment Analysis. Amsterdam: Elsevier.
  • Haghani, A., and Y. Shafahi. 2002. “Bus Maintenance Systems and Maintenance Scheduling: Model Formulations and Solutions.” Transportation Research Part A 36: 453–482.
  • Higgins, A. 1998. “Scheduling of Railway Track Maintenance Activities and Crews.” The Journal of the Operational Research Society 49 (10): 1026–1033. doi:10.1057/palgrave.jors.2600612.
  • Jardine, A. K. S., and J. A. Buzacott. 1985. “Equipment Reliability and Maintenance.” European Journal of Operational Research 19: 285–296. doi:10.1016/0377-2217(85)90124-9.
  • Jensen, U. 1995. Stochastic Models of Reliability and Maintenance: An Overview. In: Ozekici S (Ed) Reliability and Maintenance of Complex Systems. (Proceedings of the NATO Advanced Study Institute on Current Issues and Challenges in the Reliability and Maintenance of Complex Systems, held in Kemer-Antalya, Turkey, 12–22 June 1995) Springer-Verlag, Berlin, 3–36
  • Laggoune, R., A. Chateauneuf, and D. Aissani. 2009. “Opportunistic Policy for Optimal Preventive Maintenance of a Multi-Component System in Continuous Operating Units.” Computers and Chemical Engineering 33 (9): 1499–1510. doi:10.1016/j.compchemeng.2009.03.003.
  • Liu, M., and D. M. Frangopol. 2005. “Bridge Annual Maintenance Prioritization under Uncertainty by Multi-Objective Combinatorial Optimization.” Computer-Aided Civil and Infrastructure Engineering 20: 343–353. doi:10.1111/j.1467-8667.2005.00401.x.
  • Mijailovic, V. 2003. “Probabilistic Method for Planning of Maintenance Activities of Substation Components.” Electric Power Systems Research 64: 53–58. doi:10.1016/S0378-7796(02)00148-7.
  • Ok, S.-Y., S.-Y. Lee, and W. Park. 2013. “Robust Multi-Objective Maintenance Planning of Deteriorating Bridges against Uncertainty in Performance Model.” Advances in Engineering Software 65: 32–42. doi:10.1016/j.advengsoft.2013.05.009.
  • Olesen, O., and N. Petersen. 1995. “Chance Constrained Efficiency Evaluation.” Management Science 41: 442–457. doi:10.1287/mnsc.41.3.442.
  • Osaki, S., and T. Nakagawa. 1976. “Bibliography for Reliability and Availability of Stochastic Systems.” IEEE Transactions on Reliability R-25: 284–287. doi:10.1109/TR.1976.5219999.
  • Pham, H., and H. Z. Wang. 1996. “Imperfect Maintenance.” European Journal of Operational Research 94: 425–438. doi:10.1016/S0377-2217(96)00099-9.
  • Pristker, A. B., J. J. O’Reilly, and D. K. Laval. 1999. Simulation with Visual Slam and AweSim. New York, NY: Wiley.
  • Rumelhart, D. E., J. J. McClelland, and the PDP research group. 1986. Parallel Distributed Processing: Explorations in the Microstructure of Cognition. Volume I. Cambridge, MA: MIT Press.
  • Safaei, N., D. Banjevic, and A. K. S. Jardine. 2012. “Multi-Threaded Simulated Annealing for a Bi-Objective Maintenance Scheduling Problem.” International Journal of Production Research 50 (1): 63–80. doi:10.1080/00207543.2011.571444.
  • Sheikhalishahi, M. 2014. “An Integrated Simulation-Data Envelopment Analysis Approach for Maintenance Activities Planning.” International Journal of Computer Integrated Manufacturing 27 (9): 858–868. doi:10.1080/0951192X.2013.869832.
  • Sheikhalishahi, M., V. Ebrahimipour, and M. H. Farahani. 2013a. “An Integrated GA-DEA Algorithm for Determining the Most Effective Maintenance Policy for Ak-Out-Of-N Problem.” Journal of Intelligent Manufacturing. doi:10.1007/s10845-013-0752-z.
  • Sheikhalishahi, M., V. Ebrahimipour, H. Shiri, H. Zaman, and M. Jeihoonian. 2013b. “A Hybrid GA–PSO Approach for Reliability Optimization in Redundancy Allocation Problem.” The International Journal of Advanced Manufacturing Technology 68 (1–4): 317–338. doi:10.1007/s00170-013-4730-6.
  • Sherif, Y. S., and M. L. Smith. 1981. “Optimal Maintenance Models for Systems Subject to Failure – A Review.” Naval Research Logistics Quarterly 28 (1): 47–74. doi:10.1002/nav.3800280104.
  • Tsutsui, M., and S. Takata. 2012. “Life Cycle Maintenance Planning Method in Consideration of Operation and Maintenance Integration.” Production Planning and Control 23 (2–3): 183–193. doi:10.1080/09537287.2011.591649.
  • Valdez-Flores, C., and R. M. Feldman. 1989. “A Survey of Preventive Maintenance Models for Stochastically Deteriorating Single-Unit Systems.” Naval Research Logistics 36: 419–446. doi:10.1002/1520-6750(198908)36:4<419::AID-NAV3220360407>3.0.CO;2-5.
  • Wang, C.-H., and S.-W. Tsai. 2014. “Optimizing Bi-Objective Imperfect Preventive Maintenance Model for Series-Parallel System Using Established Hybrid Genetic Algorithm.” Journal of Intelligent Manufacturing 25 (3): 603–616. doi:10.1007/s10845-012-0708-8.
  • Wang, H. Z. 2002. “A Survey of Maintenance Policies of Deteriorating Systems.” European Journal of Operational Research 139: 469–489. doi:10.1016/S0377-2217(01)00197-7.
  • Wang, K. S., W. H. Chang, Y. T. Tsai, and F. S. Hsu. 1996. “Using Genetic Algorithm Planning Preventive Replacement of Components in a System.” Proceedings of the 13th National Conference of the Chinese Society of Mechanical Engineers, 271–278. Taiwan: National Taiwan University.
  • Werbos, P. 1974. “Beyond Regression: New Tools for Prediction and Analysis in the Behavioral Sciences.” Doctoral diss., Harvard, Cambridge, MA.
  • Worm, J. M., and A. V. Harten. 1996. “Model Based Decision Support for Planning of Road Maintenance.” Reliability Engineering and System Safety 51: 305–316. doi:10.1016/0951-8320(95)00100-X.
  • Yang, Z. (Max), D. Djurdjanovic, and J. Ni. 2008. “Maintenance Scheduling in Manufacturing Systems Based on Predicted Machine Degradation.” Journal of Intelligent Manufacturing 19 (1): 87–98. doi:10.1007/s10845-007-0047-3.
  • Yeh, Q.-J. 1996. “Application of Data Envelopment Analysis in Conjunction with Financial Ratios for Bank Performance Evaluation.” Journal of the Operational Research Society 47 (8): 980–988. doi:10.1057/jors.1996.125.
  • Zheng, Y., S. Chen, and H. Ling. 2013. “Efficient Multi-Objective Tabu Search for Emergency Equipment Maintenance Scheduling in Disaster Rescue.” Optimization Letters 7 (1): 89–100. doi:10.1007/s11590-011-0397-9.
  • Zhu, J. 1998. “Data Envelopment Analysis vs. Principal Components Analysis: An Illustrative Study of Economic Performance of Chinese Cities.” European Journal of Operational Research 111: 50–61.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.