160
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

An analytical model for continuous flow transporters of AMHSs with multi-loop conveyors and priority rules

, &
Pages 489-503 | Received 01 Apr 2014, Accepted 30 Jun 2015, Published online: 27 Jul 2015

References

  • Agrawal, G., and S. Heragu. 2006. “A Survey of Automated Material Handling Systems in 300-mm Semiconductor Fabs.” IEEE Transactions on Semiconductor Manufacturing 19: 112–120. doi:10.1109/TSM.2005.863217.
  • Ardezonne, F. J. 2011. “Handling the 450 mm Wafer with Structural Ceramics.” Solid State Technology 54: 40–41.
  • Bass, E., and R. Wright. 2008. “Modeling Semiconductor Factories for Equipment and Cycle Time Reduction Opportunities.” Future Fab International 24: 50–55.
  • Batarseh, O. G., D. Nazzal, and Y. Wang. 2010. “An Interval-Based Metamodeling Approach to Simulate Material Handling in Semiconductor Wafer Fabs.” IEEE Transactions on Semiconductor Manufacturing 23: 527–537. doi:10.1109/TSM.2010.2066993.
  • Bozer, Y. A., and Y. Hsieh. 2005. “Throughput Performance Analysis and Machine Layout for Discrete-Space Closed-Loop Conveyors.” IIE Transactions 37 (1): 77–89. doi:10.1080/07408170590516971.
  • Brown, C., and G. Linden. 2009. Chipset and Change: How Crisis Reshapes the Semiconductor Industry. Cambridge, MA: MIT Press.
  • Choudhury, G., and L. Tadj. 2009. “An M/G/1 Queue with Two Phases of Service Subject to the Server Breakdown and Delayed Repair.” Applied Mathematical Modelling 33: 2699–2709. doi:10.1016/j.apm.2008.08.006.
  • ChungSoo, H., P. Keith, T. Mitsuya, and A. Aijiro. 2006. “High Throughput AMHS Design with Dual Unified OHT System.” IEEE International Symposium on Semiconductor Manufacturing Conference, Tokyo, September 25–27, 185–188.
  • Davis, J. 2011. “450 mm Wafer Transition Needs Collaboration and Standards.” Solid State Technology 54: 14–17.
  • Govind, N., T. M. Roeder, and L. W. Schruben. 2011. “A Simulation-Based Closed Queueing Network Approximation of Semiconductor Automated Material Handling Systems.” IEEE Transactions on Semiconductor Manufacturing 24: 5–13. doi:10.1109/TSM.2010.2089659.
  • Hennessy, L. 2012. “Assessing the Impact of the 450 mm Wafer Size Transition on Manufacturing Facility Automated Material Handling Systems.” In Advanced Semiconductor Manufacturing Conference, 245–250. New York: IEEE.
  • Hong, S., A. L. Johnson, H. J. Carlo, D. Nazzal, and J. A. Jimenez. 2011. “Optimising the Location of Crossovers in Conveyor-Based Automated Material Handling Systems in Semiconductor Wafer Fabs.” International Journal of Production Research 49: 6199–6226. doi:10.1080/00207543.2010.528059.
  • Jefferson, T. 2009. “ISMI 450 mm Transition Program Update.” Semiconductor Japan 12: 12–13.
  • Kondo, H. 2006. “Requirements for AMHS in 450 mm Era.” In Proceedings Thirteenth International Symposium on Semiconductor Manufacturing, 189–192. New York: IEEE.
  • Kuhl, M. E., and G. R. Laubisch. 2004. “A Simulation Study of Dispatching Rules and Rework Strategies in Semiconductor Manufacturing.” In IEEE International Symposium on Semiconductor Manufacturing Conference, 325–329. New York: IEEE.
  • Kwangyoung, I., K. Kyungsup, M. Youngmin, P. Taeeun, and L. Sujeong. 2010. “The Deadlock Detection and Resolution Method for a Unified Transport System.” International Journal of Production Research 48: 4423–4435. doi:10.1080/00207540902991690.
  • Liao, D.-Y., M.-D. Jeng, and M. C. Zhou. 2007. “Application of Petri Nets and Lagrangian Relaxation to Scheduling Automatic Material-Handling Vehicles in 300-mm Semiconductor Manufacturing.” IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 37: 504–516. doi:10.1109/TSMCC.2007.897321.
  • Lin, J. T., F.-K. Wang, and P.-Y. Yen. 2001. “Simulation Analysis of Dispatching Rules for an Automated Interbay Material Handling System in Wafer Fab.” International Journal of Production Research 39: 1221–1238. doi:10.1080/00207540010005718.
  • Marshall, L., K. Rust, and K. Schmidt. 2007. “300 Mm Prime Gaps that Need to Be Addressed to Boost Productivity.” In Proceedings of the International Symposium on Semiconductor Manufacturing (ISSM 2007), 1–4. Santa Clara, CA: IEEE.
  • Muller, R., C. Alexopoulos, and L. F. McGinnis. 2007. “Automatic Generation of Simulation Models for Semiconductor Manufacturing.” In Proceedings of the 2007 Winter Simulation Conference, 648–657. Washington, DC: IEEE.
  • Myers, S. 2007. “The 450 Mm Debate.” Semiconductor International 30 (2): 61–63.
  • Narayan, B. U. 2008. An Introduction to Queuing Theory: Modeling and Analysis in Applications, 215–224. Boston, MA: Springer Science & Media.
  • Nazzal, D., and A. El-Nashar. 2007. “Survey of Research in Modeling Conveyor-Based Automated Material Handling Systems in Wafer Fabs.” In Processings of the 2007 Winter Simulation Conference, 1781–1788. Washington, DC: IEEE.
  • Nazzal, D., J. A. Jimenez, H. J. Carlo, A. L. Johnson, and V. Lasrado. 2010. “An Analytical Model for Conveyor-Based Material Handling System with Crossovers in Semiconductor Wafer Fabs.” IEEE Transactions on Semiconductor Manufacturing 23: 468–476. doi:10.1109/TSM.2010.2051736.
  • Nazzal, D., A. Johnson, H. J. Carlo, and J. A. Jimenez, 2008. “An Analytical Model for Conveyor Based AMHS in Semiconductor Wafer Fabs.” Proceedings of the 2008 Winter Simulation Conference, Miami, FL, December 7–10, 2148–2155.
  • Paprotny, I., J. Shiau, Y. Huh, and G. Mackulak. 2000. “Simulation Based Comparison of Semiconductor AMHS Alternatives: Continuous Flow vs. Overhead Monorail.” Proceedings of the 2000 Winter Simulation Conference 2: 1333–1338.
  • Peters, B., and T. Yang. 1997. “Integrated Facility Layout and Material Handling System Design in Semiconductor Fabrication Facilities.” IEEE Transactions on Semiconductor Manufacturing 10: 360–369. doi:10.1109/66.618209.
  • Pettinato, J. S., and D. Pillai. 2005. “Technology Decisions to Minimize 450 mm Wafer Size Transition Risk.” IEEE Transactions on Semiconductor Manufacturing 18: 501–509. doi:10.1109/TSM.2005.858471.
  • Rothe, O., B. VanEck, R. Fandel, and R. Wright. 2008. “A Vision for A Next Generation 300mm Factory.” Solid State Technology 24: 26–29.
  • Schmidt, L. C., and J. Jackman. 2000. “Modeling Re-Circulating Conveyors with Blocking.” European Journal of Operational Research 124: 422–436. doi:10.1016/S0377-2217(99)00181-2.
  • Yang, T., and B. A. Peters. 1997. “A Spine Layout Design Method for Semiconductor Fabrication Facilities Containing Automated Material Handling Systems.” International Journal of Operations & Production Management 17: 490–501. doi:10.1108/01443579710167212.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.