1,533
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

A Physical Internet-enabled Building Information Modelling System for prefabricated construction

, , , , &
Pages 349-361 | Received 21 Jun 2016, Accepted 31 Aug 2017, Published online: 14 Sep 2017

References

  • Azhar, S., W. A. Carlton, D. Olsen, and I. Ahmad. 2011. “Building Information Modeling for Sustainable Design and LEED® Rating Analysis.” Automation in Construction 20 (2): 217–224. doi:10.1016/j.autcon.2010.09.019.
  • Babič, N. Č., P. Podbreznik, and D. Rebolj. 2010. “Integrating Resource Production and Construction Using BIM.” Automation in Construction 19 (5): 539–543. doi:10.1016/j.autcon.2009.11.005.
  • Bazjanac, V. 2004. “Building Energy Performance Simulation as Part of Interoperable Software Environments.” Building and Environment 39 (8): 879–883. doi:10.1016/j.buildenv.2004.01.012.
  • Benjaoran, V., and N. Dawood. 2006. “Intelligence Approach to Production Planning System for Bespoke Precast Concrete Products.” Automation in Construction 15 (6): 737–745. doi:10.1016/j.autcon.2005.09.007.
  • Bynum, P., R. R. Issa, and S. Olbina. 2013. “Building Information Modeling in Support of Sustainable Design and Construction.” Journal of Construction Engineering and Management 139 (1): 24–34. doi:10.1061/(ASCE)CO.1943-7862.0000560.
  • Chen, K., W. Lu, Y. Peng, S. Rowlinson, and G. Q. Huang. 2015. “Bridging BIM and Building: From a Literature Review to an Integrated Conceptual Framework.” International Journal of Project Management 33 (6): 1405–1416. doi:10.1016/j.ijproman.2015.03.006.
  • Chuang, T. H., B. C. Lee, and I. C. Wu. 2011. “Applying Cloud Computing Technology to BIM Visualization and Manipulation.” Paper presented at the 28th international symposium on Automation & Robotics in Construction, Seoul, Korea, June 29–July 2.
  • Crowther, P. 1999. “Design for Disassembly to Recover Embodied Energy.” Paper Presented at the 16th Annual Conference on Passive and Low Energy Architecture, Melbourne, Australia, September.
  • Dai, Q. Y., R. Y. Zhong, G. Q. Huang, T. Qu, T. Zhang, and T. Y. Luo. 2012. “Radio Frequency Identification-Enabled Real-Time Manufacturing Execution System: A Case Study in an Automotive Part Manufacturer.” International Journal of Computer Integrated Manufacturing 25 (1): 51–65. doi:10.1080/0951192X.2011.562546.
  • Dixit, M. K., J. L. Fernández-Solís, S. Lavy, and C. H. Culp. 2010. “Identification of Parameters for Embodied Energy Measurement: A Literature Review.” Energy and Buildings 42 (8): 1238–1247. doi:10.1016/j.enbuild.2010.02.016.
  • Eichholtz, P., N. Kok, and J. M. Quigley. 2010. “Doing Well by Doing Good? Green Office Buildings.” The American Economic Review 100 (5): 2492–2509. doi:10.1257/aer.100.5.2492.
  • Gibb, A. G. 1999. Off-Site Fabrication: Prefabrication, Pre-Assembly and Modularisation. New York, NY: John Wiley & Sons.
  • Gubbi, J., R. Buyya, S. Marusic, and M. Palaniswami. 2013. “Internet of Things (IoT): A Vision, Architectural Elements, and Future Directions.” Future Generation Computer Systems 29 (7): 1645–1660. doi:10.1016/j.future.2013.01.010.
  • Heydarian, A., and M. Golparvar-Fard. 2011. “A Visual Monitoring Framework for Integrated Productivity and Carbon Footprint Control of Construction Operations.” In Proceedings of the 2011 ASCE International Workshop on Computing in Civil Engineering, edited by Y. Zhu and R. Raymond Issa, 504–511. American Society of Civil Engineers. doi:10.1061/9780784411827.
  • Hong, J. K., G. Q. Shen, C. Mao, Z. D. Li, and K. J. Li. 2016. “Life-Cycle Energy Analysis of Prefabricated Building Components: An Input–Output-Based Hybrid Model.” Journal of Cleaner Production 112: 2198–2207. doi:10.1016/j.jclepro.2015.10.030.
  • Hu, W. 2005. “Automatic Construction Process of Prefabricated Buildings on Geometric Reasoning.” In Proceedings of the Construction Research Congress 2005, edited by I. D. Tommelein, 1–10. American Society of Civil Engineers. doi:10.1061/40754(183)11.
  • Irizarry, J., E. P. Karan, and F. Jalaei. 2013. “Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management.” Automation in Construction 31: 241–254. doi:10.1016/j.autcon.2012.12.005.
  • Jeong, W., S. Chang, J. Son, and J.-S. Yi. 2016. “BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management.” Sustainability 8 (12): 1106. doi:10.3390/su8111106.
  • Krygiel, E., and B. Nies. 2008. Green BIM: Successful Sustainable Design with Building Information Modeling. Hoboken, NJ: John Wiley & Sons.
  • Laine, T., A. Karola, and O. G. Oy. 2007. “Benefits of Building Information Models in Energy Analysis.” In Proceedings of the Clima 2007 WellBeing Indoors, edited by O. Seppänen, and J. Säteri. Helsinki: Finnish Association of HVAC Societies.
  • Li, H., H. L. Guo, M. Skitmore, T. Huang, K. Y. N. Chan, and G. Chan. 2011. “Rethinking Prefabricated Construction Management Using the VP‐Based IKEA Model in Hong Kong.” Construction Management and Economics 29 (3): 233–245. doi:10.1080/01446193.2010.545994.
  • Lu, W. S., and H. P. Yuan. 2013. “Investigating Waste Reduction Potential in the Upstream Processes of Offshore Prefabrication Construction.” Renewable and Sustainable Energy Reviews 28: 804–811. doi:10.1016/j.rser.2013.08.048.
  • Mao, C., Q. Shen, L. Shen, and L. Tang. 2013. “Comparative Study of Greenhouse Gas Emissions between Off-Site Prefabrication and Conventional Construction Methods: Two Case Studies of Residential Projects.” Energy and Buildings 66: 165–176. doi:10.1016/j.enbuild.2013.07.033.
  • Montreuil, B. 2011. “Toward a Physical Internet: Meeting the Global Logistics Sustainability Grand Challenge.” Logistics Research 3 (2–3): 71–87. doi:10.1007/s12159-011-0045-x.
  • Montreuil, B., R. D. Meller, and E. Ballot. 2013. “Physical Internet Foundations.” In Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, edited by T. Borangiu, A. Thomas, and D. Trentesaux, 151–166. Berlin Heidelberg: Springer.
  • Neelamkavil, J. 2009. “Automation in the Prefab and Modular Construction Industry. ” In Proceedings of the 26th International Symposium on Automation and Robotics in Construction, edited by ISARC, 299-306, Austin: ISARC.
  • NIBS (National Institute of Building Science). 2015. “National BIM Standard-United States V3.” Accessed May 20, 2016. https://www.nationalbimstandard.org/.
  • Niu, Y., W. Lu, K. Chen, G. G. Huang, and C. Anumba. 2015. “Smart Construction Objects.” Journal of Computing in Civil Engineering 04015070. doi:10.1061/(ASCE)CP.1943-5487.0000550.
  • Pheng, L. S., and C. J. Chuan. 2001. “Just-in-Time Management of Precast Concrete Components.” Journal of Construction Engineering and Management 127 (6): 494–501. doi:10.1061/(ASCE)0733-9364(2001)127:6(494).
  • Qiu, X., H. Luo, G. Y. Xu, R. Y. Zhong, and G. Q. Huang. 2015. “Physical Assets and Service Sharing for IoT-Enabled Supply Hub in Industrial Park (SHIP).” International Journal of Production Economics 159: 4–15. doi:10.1016/j.ijpe.2014.09.001.
  • Reddy, B. V., and K. S. Jagadish. 2003. “Embodied Energy of Common and Alternative Building Materials and Technologies.” Energy and Buildings 35 (2): 129–137. doi:10.1016/S0378-7788(01)00141-4.
  • Stadel, A., J. Eboli, A. Ryberg, J. Mitchell, and S. Spatari. 2011. “Intelligent Sustainable Design: Integration of Carbon Accounting and Building Information Modeling.” Journal of Professional Issues in Engineering Education and Practice 137 (2): 51–54. doi:10.1061/(ASCE)EI.1943-5541.0000053.
  • Treloar, G. J., P. E. Love, and G. D. Holt. 2001. “Using National Input/Output Data for Embodied Energy Analysis of Individual Residential Buildings.” Construction Management and Economics 19 (1): 49–61. doi:10.1080/014461901452076.
  • Yee, A. A. 2001. “Structural and Economic Benefits of Precast/Prestressed Concrete Construction.” PCI Journal. 7 (8): 34–42. doi:10.15554/pcij.07012001.34.42.
  • Zhang, Y. F., G. Zhang, J. Q. Wang, S. D. Sun, S. B. Si, and T. Yang. 2015. “Real-Time Information Capturing and Integration Framework of the Internet of Manufacturing Things.” International Journal of Computer Integrated Manufacturing 28 (8): 811–822. doi:10.1080/0951192X.2014.900874.
  • Zhong, R. Y., Q. Dai, T. Qu, G. Hu, and G. Q. Huang. 2013a. “RFID-Enabled Real-Time Manufacturing Execution System for Mass-Customization Production.” Robotics and Computer Integrated Manufacturing 29 (2): 283–292. doi:10.1016/j.rcim.2012.08.001.
  • Zhong, R. Y., Z. Li, L. Y. Pang, Y. Pan, T. Qu, and G. Q. Huang. 2013b. “RFID-Enabled Real-Time Advanced Planning and Scheduling Shell for Production Decision Making.” International Journal of Computer Integrated Manufacturing 26 (7): 649–662. doi:10.1080/0951192X.2012.749532.
  • Zhong, R. Y., Y. Peng, F. Xue, J. Fang, W. Zou, H. Luo, S. T. Ng, W. Lu, G. Q. Shen, and G. Q. Huang. 2017. “Prefabricated Construction Enabled by the Internet-of-Things.” Automation in Construction 76: 59–70. doi:10.1016/j.autcon.2017.01.006.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.