834
Views
35
CrossRef citations to date
0
Altmetric
Original Articles

Synchronisation for smart factory - towards IoT-enabled mechanisms

, , , , ORCID Icon &
Pages 624-635 | Received 30 Oct 2016, Accepted 13 Nov 2017, Published online: 30 Nov 2017

References

  • Allahverdi, A., J. N. D. Gupta, and T. Aldowaisan. 1999. “A Review of Scheduling Research Involving Setup Considerations.” Omega 27 (2): 219–239. doi:10.1016/S0305-0483(98)00042-5.
  • Arzi, Y., and D. Raviv. 1998. “Dispatching in a Workstation Belonging to a Re-Entrant Production Line under Sequence-Dependent Set-Up Times.” Production Planning & Control 9 (7): 690–699. doi:10.1080/095372898233696.
  • Blocher, J. D., D. Chhajed, and M. Leung. 1998. “Customer Order Scheduling in a General Job Shop Environment.” Decision Sciences 29 (4): 951–981. doi:10.1111/j.1540-5915.1998.tb00883.x.
  • Chen, J., G. Q. Huang, H. Luo, and J. Wang. 2015. “Synchronisation of Production Scheduling and Shipment in an Assembly Flowshop.” International Journal of Production Research 53 (9): 2787–2802. doi:10.1080/00207543.2014.994075.
  • Chen, K., and J. Ping. 2007. “A Mixed Integer Programming Model for Advanced Planning and Scheduling (APS).” European Journal of Operational Research 181 (1): 515–522. doi:10.1016/j.ejor.2006.06.018.
  • Chongwatpol, J., and R. Sharda. 2013. “RFID-enabled Track and Traceability in Job-Shop Scheduling Environment.” European Journal of Operational Research 227 (3): 453–463. doi:10.1016/j.ejor.2013.01.009.
  • Chung-Lun, L., and O. Jinwen. 2007. “Coordinated Scheduling of Customer Orders with Decentralized Machine Locations.” IIE Transactions 39 (9): 899–909. doi:10.1080/07408170600972990.
  • David, F., H. Pierreval, and C. Caux. 2006. “Advanced Planning and Scheduling Systems in Aluminium Conversion Industry.” International Journal of Computer Integrated Manufacturing 19 (7): 705–715. doi:10.1080/09511920500504545.
  • Guo, Z. X., E. W. T. Ngai, C. Yang, and X. Liang. 2015. “An RFID-based Intelligent Decision Support System Architecture for Production Monitoring and Scheduling in a Distributed Manufacturing Environment.” International Journal of Production Economics 159: 16–28. doi:10.1016/j.ijpe.2014.09.004.
  • Hsu, S.-Y., and C.-H. Liu. 2009. “Improving the Delivery Efficiency of the Customer Order Scheduling Problem in a Job Shop.” Computers & Industrial Engineering 57 (3): 856–866. doi:10.1016/j.cie.2009.02.015.
  • Huang, G. Q., P. K. Wright, and S. T. Newman. 2009. “Wireless Manufacturing: A Literature Review, Recent Developments, and Case Studies.” International Journal of Computer Integrated Manufacturing 22 (7): 579–594. doi:10.1080/09511920701724934.
  • Hvolby, H.-H., and K. Steger-Jensen. 2010. “Technical and Industrial Issues of Advanced Planning and Scheduling (APS) Systems.” Computers in Industry 61 (9): 845–851. doi:10.1016/j.compind.2010.07.009.
  • Jiang, T., and Y. Liu. 2017. “Parameter Inference for Non-Repairable Multi-State System Reliability Models by Multi-Level Observation Sequences.” Reliability Engineering & System Safety 166: 3–15. doi:10.1016/j.ress.2016.11.019.
  • Johnson, D. 2002. “RFID Tags Improve Tracking, Quality on Ford Line in Mexico.” Control Engineering 49 (11): 16.
  • Lee, J., B. Bagheri, and H.-A. Kao. 2015. “A Cyber-Physical Systems Architecture for Industry 4.0-Based Manufacturing Systems.” Manufacturing Letters 3: 18–23. doi:10.1016/j.mfglet.2014.12.001.
  • Lin, B. M. T., and A. V. Kononov. 2007. “Customer Order Scheduling to Minimize the Number of Late Jobs.” European Journal of Operational Research 183 (2): 944–948. doi:10.1016/j.ejor.2006.10.021.
  • Lou, P., Q. Liu, Z. Zhou, H. Wang, and S. X. Sun. 2012. “Multi-Agent-Based Proactive–Reactive Scheduling for a Job Shop.” The International Journal of Advanced Manufacturing Technology 59 (1): 311–324. doi:10.1007/s00170-011-3482-4.
  • Luo, H., G. Q. Huang, Y. Shi, Q. Ting, and Y. F. Zhang. 2012. “Hybrid Flowshop Scheduling with Family Setup Time and Inconsistent Family Formation.” International Journal of Production Research 50 (6): 1457–1475. doi:10.1080/00207543.2011.560620.
  • Luo, H., A. Zhang, and G. Q. Huang. 2015. “Active Scheduling for Hybrid Flowshop with Family Setup Time and Inconsistent Family Formation.” Journal of Intelligent Manufacturing 26 (1): 169–187. doi:10.1007/s10845-013-0771-9.
  • Mirsanei, H. S., M. Zandieh, M. J. Moayed, and M. R. Khabbazi. 2011. “A Simulated Annealing Algorithm Approach to Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times.” Journal of Intelligent Manufacturing 22 (6): 965–978. doi:10.1007/s10845-009-0373-8.
  • Pickardt, C. W., and J. Branke. 2012. “Setup-Oriented Dispatching Rules–A Survey.” International Journal of Production Research 50 (20): 5823–5842. doi:10.1080/00207543.2011.629634.
  • Salmasi, N., R. Logendran, and M. R. Skandari. 2011. “Makespan Minimization of a Flowshop Sequence-Dependent Group Scheduling Problem.” The International Journal of Advanced Manufacturing Technology 56 (5): 699–710. doi:10.1007/s00170-011-3206-9.
  • Shen, W., L. Wang, and Q. Hao. 2006. “Agent-Based Distributed Manufacturing Process Planning and Scheduling: A State-Of-The-Art Survey.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 36 (4): 563–577. doi:10.1109/TSMCC.2006.874022.
  • Steger-Jensen, K., H.-H. Hvolby, P. Nielsen, and I. Nielsen. 2011. “Advanced Planning and Scheduling Technology.” Production Planning & Control 22 (8): 800–808. doi:10.1080/09537287.2010.543563.
  • Wang, G., and T. C. Edwin Cheng. 2007. “Customer Order Scheduling to Minimize Total Weighted Completion Time.” Omega 35 (5): 623–626. doi:10.1016/j.omega.2005.09.007.
  • Zandieh, M., E. Mozaffari, and M. Gholami. 2010. “A Robust Genetic Algorithm for Scheduling Realistic Hybrid Flexible Flow Line Problems.” Journal of Intelligent Manufacturing 21 (6): 731–743. doi:10.1007/s10845-009-0250-5.
  • Zhang, Y., Q. Ting, O. K. Ho, and G. Q. Huang. 2011. “Agent-Based Smart Gateway for RFID-enabled Real-Time Wireless Manufacturing.” International Journal of Production Research 49 (5): 1337–1352. doi:10.1080/00207543.2010.518743.
  • Zhong, R. Y., Q. Y. Dai, T. Qu, G. J. Hu, and G. Q. Huang. 2013a. “RFID-enabled Real-Time Manufacturing Execution System for Mass-Customization Production.” Robotics and Computer-Integrated Manufacturing 29 (2): 283–292. doi:10.1016/j.rcim.2012.08.001.
  • Zhong, R. Y., Z. Li, L. Y. Pang, Y. Pan, Q. Ting, and G. Q. Huang. 2013b. “RFID-enabled Real-Time Advanced Planning and Scheduling Shell for Production Decision Making.” International Journal of Computer Integrated Manufacturing 26 (7): 649–662. doi:10.1080/0951192X.2012.749532.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.