651
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Development of an evaluation framework of production planning for the shipbuilding industry

, &
Pages 831-847 | Received 29 Oct 2017, Accepted 02 Mar 2018, Published online: 11 Mar 2018

References

  • Back, M. G., J. H. Woo, P. Lee, and J. G. Shin. 2017. “Productivity Improvement Strategies Using Simulation in Offshore Plant Construction.” Journal of Ship Production and Design 33 (2): 144–155. doi:10.5957/JSPD.33.2.150016.
  • Cho, K. K., and Y. G. Kim. 1997. “An Operation Scheduling System for Hull Fabrication Shop [In Korean].” Proceedings of Korean Institute of Industrial Engineers Conference 1997: 443–446.
  • Cho, K. K., J. S. Oh, K. R. Ryu, and H. R. Choi. 1998. “An Integrated Process Planning and Scheduling System for Block Assembly in Shipbuilding.” CIRP Annals 47 (1): 419–422. doi:10.1016/S0007-8506(07)62865-0.
  • Choi, H. R., K. R. Ryu, K. K. Cho, H. S. Lim, and J. H. Hwan. 1996. “A Scheduling System for Panel Block Assembly Shop in Shipbuilding Using Genetic Algorithms.” Journal of Intelligence and Information Systems 2 (2): 29–42.
  • Chryssolouris, G., D. Mourtzis, and S. Makris. 2003. “An Approach to Planning and Control of Ship Repair Manufacturing Operations.” CIRP Journal of Manufacturing Systems 32 (1): 13–19.
  • Chryssolouris, G., N. Papakostas, S. Makris, and D. Mourtzis. 1999. Planning and Scheduling of Shipyard Processes. In Application of Information Technologies to the Maritime Industries, edited by C. Guedes Soares and J. Brodda, 255–274. Lisbon: Edicoes Salamandra.
  • Dong, F., J. R. Deglise-Hawkinson, M. P. van Oyen, and D. J. Singer. 2016. “Dynamic Control of a Closed Two-Stage Queueing Network for Outfitting Process in Shipbuilding.” Computers & Operations Research 72: 1–11. doi:10.1016/j.cor.2015.05.002.
  • Hwang, I. H., Y. Kim, D. K. Lee, and J. G. Shin. 2014. “Automation of Block Assignment Planning Using a Diagram-Based Scenario Modeling Method.” International Journal of Naval Architecture and Ocean Engineering 6 (1): 162–174. doi:10.2478/IJNAOE-2013-0170.
  • Im, J. C. 1994. “A Study on Scheduling Algorithms for Shipbuilding Plan [In Korean].” Master’s diss., Korea Advanced Institute of Science and Technology.
  • Kang, M., J. Seo, and H. Chung 2017. “Ship Block Assembly Sequence Planning considering Productivity and Welding Deformation.” International Journal of Naval Architecture and Ocean Engineering (Published online), doi:10.1016/j.ijnaoe.2017.09.005
  • Kim, Y. S., and D. H. Lee. 2007. “A Study on Construction of Detail Integrated Scheduling System of Ship Building Process [In Korean].” Journal of Society of Naval Architects of Korea 44 (1): 48–54. doi:10.3744/SNAK.2007.44.1.048.
  • Koh, S. G. 1996. “A Production Schedule with Genetic Algorithm in Block Assembly Shop [In Korean].” Korean Management Science Review 13 (1): 1–12.
  • Krause, M., F. Roland, D. Steinhauer, and M. Heinemann. 2004. “Discrete Event Simulation: An Efficient Tool to Assist Shipyard Investment and Production Planning.” Journal of Ship Production 20 (3): 176–182.
  • Lee, D. H., Y. S. Kim, and J. H. Kim. 2008. “A Study on Real-Time Planning System in Multi Progress Planning Environment [In Korean].” Journal of Society of Naval Architects of Korea 45 (5): 547–553. doi:10.3744/SNAK.2008.45.5.547.
  • Lee, J. D., and Y. S. Hong. 1994. “A Production Schedule for Load Leveling in A Block Assembly Shop.” IE Interfaces 7 (2): 75–85.
  • Lee, J. W., and H. J. Kim. 1995. “Erection Process Planning and Scheduling Using Genetic Algorithm [In Korean].” Transactions of the Society of Naval Architecture of Korea 32 (1): 9–16.
  • Lee, K. J., J. K. Lee, and S. Y. Choi. 1996. “A Spatial Scheduling System and Its Application to Shipbuilding: DAS-CURVE.” Expert Systems with Applications 10 (3–4): 311–324. doi:10.1016/0957-4174(96)00010-3.
  • Lee, K. Y. 1993. “Development of the Computerized Ship Design and Production System (CSDP) [In Korean].” Bulletin of the Society of Naval Architects of Korea 30 (4): 7–9.
  • Liu, Z., D. K. H. Chua, and K. W. Yeoh. 2011. “Aggregate Production Planning for Shipbuilding with Variation-Inventory Trade-Offs.” International Journal of Production Research 49 (20): 6249–6272. doi:10.1080/00207543.2010.527388.
  • Mello, M. H., J. Gosling, M. M. Naim, J. O. Strandhagen, and P. O. Brett. 2017. “Improving Coordination in an Engineer-to-Order Supply Chain Using a Soft Systems Approach.” Production Planning & Control 28 (2): 89–107. doi:10.1080/09537287.2016.1233471.
  • O’Rourke, C., N. Fishman, and W. Selkow. 2003. Enterprise Architecture Using the Zachman Framework. Boston, MA: Thompson Course Technology.
  • Persona, A., A. Regattieri, and P. Romano. 2004. “An Integrated Reference Model for Production Planning and Control in SMEs.” Journal of Manufacturing Technology Management 15 (7): 626–640. doi:10.1108/17410380410555871.
  • Sowa, J. F., and J. A. Zachman. 1992. “Extending and Formalizing the Framework for Information Systems Architecture.” IBM Systems Journal 31 (3): 590–616. doi:10.1147/sj.313.0590.
  • Tu, Y. 1997. “Production Planning and Control in a Virtual One-of-A-Kind Production Company.” Computers in Industry 34: 271–283. doi:10.1016/S0166-3615(97)00046-8.
  • Varghese, R., and D. Y. Yoon. 2006. “Shipbuilding Erection Network Optimization: A TSP Method.” Journal of Ship Production 22 (3): 139–146.
  • Woo, S. B., H. G. Ryu, and H. S. Hahn. 2003. “Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding.” IE Interfaces 16 (3): 332–343.
  • Yoon, D. Y., and G. C. Kim. 1993. “A Concept Design for Development of Process Planning and Scheduling Support System [In Korean].” Bulletin of the Society of Naval Architects of Korea 30 (4): 37–40.
  • Yue, W., M. Rui, and L. Yan. 2017. “The Research of Shipbuilding Schedule Planning and Simulation Optimization Technique Based on Constant Work-In-Process System.” Journal of Ship Production and Design. doi:10.5957/JSPD.33.2.160025.
  • Zachman, J. A. 1987. “A Framework for Information Systems Architecture.” IBM Systems Journal 26 (3): 276–292. doi:10.1147/sj.263.0276.
  • Zachman, J. A. 2003. The Framework for Enterprise Architecture – Cell Definitions. ZIFA report.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.