References
- Akpınar, S., and G. M. Bayhan. 2011. “A Hybrid Genetic Algorithm For Mixed Model Assembly Line Balancing Problem With Parallel Workstations And Zoning Constraints.” Engineering Applications of Artificial Intelligence 24 (3): 449–457. doi:10.1016/j.engappai.2010.08.006.
- Alavidoost, M. H., M. H. F. Zarandi, M. Tarimoradi, Y. Nemati, et al. 2017. “Modified Genetic Algorithm for Simple Straight and U-shaped Assembly Line Balancing with Fuzzy Processing Times.” Journal of Intelligent Manufacturing 28 (2): 313–336. doi:10.1007/s10845-014-0978-4.
- Barathwaj, N., P. Raja, and S. Gokulraj. 2015. “Optimization of Assembly Line Balancing Using Genetic Algorithm.” Journal of Central South University 22 (10): 3957–3969. doi:10.1007/s11771-015-2940-9.
- Carmignani, G. 2017. “Scrap Value Stream Mapping (S-VSM): A New Approach to Improve the Supply Scrap Management Process.” International Journal of Production Research 55 (12): 3559–3576. doi:10.1080/00207543.2017.1308574.
- Chen, J. C., C. C. Chen, L. H. Su, et al. 2012. “Assembly Line Balancing in Garment Industry.” Expert Systems with Applications 39 (11): 10073–10081. doi:10.1016/j.eswa.2012.02.055.
- Çil, Z. A., S. Mete, E. Özceylan, K. Ağpak, et al. 2017. “A Beam Search Approach for Solving Type II Robotic Parallel Assembly Line Balancing Problem”. Applied Soft Computing 61: 129–138. doi:10.1016/j.asoc.2017.07.062.
- Delice, Y., E. K. Aydoğan, and U. Özcan. 2016. “Stochastic Two-sided U-type Assembly Line Balancing: A Genetic Algorithm Approach.” International Journal of Production Research 54 (11): 1–23. doi:10.1080/00207543.2016.1140918.
- Ding, Z. 2004. The Product Seriation Design: Serialized Design of Electric Tools. Nanjing: Nanjing University of Science & Technology. doi:10.7666/d.y625294.
- Duan, YY. 2015. Research on Stochastic Two-sided Mixed-model Assembly Line Balancing Problem. Guangzhou: Guangdong University of Technology. doi:10.7666/d.Y2795767.
- Güden, H., and S. Meral. 2016. “An Adaptive Simulated Annealing Algorithm-based Approach for Assembly Line Balancing and a Real-life Case Study.” International Journal of Advanced Manufacturing Technology 84: 1539–1559. doi:10.1007/s00170-015-7802-y.
- Heravi, G., and M. Firoozi. 2017. “Production Process Improvement of Buildings’ Prefabricated Steel Frames Using Value Stream Mapping.” International Journal of Advanced Manufacturing Technology 89: 3307–3321. doi:10.1007/s00170-016-9306-9.
- Ho, J. C., and Y. L. Chang. 2001. “An Integrated MRP and JIT Framework.” Computers and Industrial Engineering 41: 173–185. doi:10.1016/S0360-8352(01)00052-3.
- Lai, T. C., Y. N. Sotskov, A. Dolgui, and A. Zatsiupa. 2016. “Stability Radii of Optimal Assembly Line Balances with a Fixed Workstation Set.” International Journal of Production Economics 182: 356–371. doi:10.1016/j.ijpe.2016.07.016.
- Liu, H., J. Xia, C. Shi, S. Wen, and J. Wang. 2014. “Analysis of Genetic Algorithm in Balancing Production Line of Company A.” Logistics Technology 9: 367–370. doi:10.3969/j.issn.1005-152x.2014.09.118.
- Riggs, R. J., O. Battaïa, and S. J. Hu. 2015. “Disassembly Line Balancing under High Variety of End of Life States Using a Joint Precedence Graph Approach.” Journal of Manufacturing Systems 37: 638–648. doi:10.1016/j.jmsy.2014.11.002.
- Sotskov, Y. N., A. Dolgui, T.-C. Lai, A. Zatsiupa, et al. 2015. “Enumerations and Stability Analysis of Feasible and Optimal Line Balances for Simple Assembly Lines.” Computers & Industrial Engineering 90 (C): 241–258. doi:10.1016/j.cie.2015.08.018.
- Tabanli, R. M., and T. Ertay. 2013. “Value Stream Mapping and Benefit–Cost Analysis Application for Value Visibility of A Pilot Project on RFID Investment Integrated to A Manual Production Control System—A Case Study.” International Journal of Advanced Manufacturing Technology 66 (5–8): 987–1002. doi:10.1007/s00170-012-4383-x.
- Tanzina, Z., P. Sanjoy Kumar, and A. Abdullahil. 2012. “Sustainable Operator Assignment in an Assembly Line Using Genetic Algorithm.” International Journal of Production Research 50 (18): 5077–5084. doi:10.1080/00207543.2011.636764.
- W K, H., and C. P. Sang. 2014. “A Framework for the Continuous Performance Improvement of Manned Assembly Lines.” International Journal of Production Research 52 (18): 5432–5450. doi:10.1080/00207543.2014.911420.
- Zacharia, P. T., and A. C. Nearchou. 2013. “A Meta-heuristic Algorithm for the Fuzzy Assembly Line Balancing Type-e Problem.” Computers & Operations Research 40 (12): 3033–3044. doi:10.1016/j.cor.2013.07.012.