197
Views
2
CrossRef citations to date
0
Altmetric
Articles

An approach to evaluate CAM software alternatives

Pages 504-514 | Received 03 Oct 2018, Accepted 23 Mar 2020, Published online: 04 May 2020

References

  • Abouelala, M., M. T. Janan, and P. Brandt-Pomares. 2015. “Methodology of Selecting CAM Software Package for Education Based on a Questionnaire.” International Journal of Mechanical Engineering Education 43 (2): 77–93. doi:10.1177/0306419015588397.
  • Ayag, Z. 2002. “An Analytic-hierarchy-process Based Simulation Model for Implementation and Analysis of Computer-aided Systems.” International Journal of Production Research 40 (13): 3053–3073. doi:10.1080/00207540210140059.
  • Ayag, Z. 2005a. “An Integrated Approach to Evaluating Conceptual Design Alternatives in a New Product Development Environment.” International Journal of Production Research 43 (4): 687–713. doi:10.1080/00207540512331311831.
  • Ayag, Z. 2005b. “A Fuzzy AHP-based Simulation Approach to Concept Evaluation in A NPD Environment.” IIE Transactions 37 (9): 827–842. doi:10.1080/07408170590969852.
  • Boender, C. G. E., J. G. De Grann, and F. A. Lootsma. 1989. “Multi-criteria Decision Analysis with Fuzzy Pair Wise Comparison.” Fuzzy Sets and Systems 29 (2): 133–143. doi:10.1016/0165-0114(89)90187-5.
  • Buckley, J. J. 1985. “Fuzzy Hierarchical Analysis.” Fuzzy Sets and Systems 17 (3): 233–247. doi:10.1016/0165-0114(85)90090-9.
  • Chakraborti, A. S. 2014. “CAD/CAM Software Selection for Small and Medium Scale Manufacturing Organizations in Kolkata.” International Journal of Advances in Engineering Research 7: 23–37.
  • Cheng, C. H., and D. L. Mon. 1994. “Evaluating Weapon System by Analytic Hierarchy Process Based on Fuzzy Scales.” Fuzzy Sets and Systems 63 (1): 1–10. doi:10.1016/0165-0114(94)90140-6.
  • Deng, H. 1999. “Multi-criteria Analysis with Fuzzy Pair Wise Comparison.” International Journal of Approximate Reasoning 21 (3): 215–231. doi:10.1016/S0888-613X(99)00025-0.
  • Enea, M., and T. Piazza. 2004. “Project Selection by Constrained Fuzzy AHP.” Fuzzy Optimization and Decision Making 3 (1): 39–62. doi:10.1023/B:FODM.0000013071.63614.3d.
  • Groover, M. P. 2001. Automation, Production Systems, and Computer-Integrated Manufacturing. New Jersey: Prentice-Hall.
  • Hodgett, R. E. 2016. “Comparison of Multi-criteria Decision-making Methods for Equipment Selection.” International Journal of Advanced Manufacturing Technology 85 (5–8): 1145–1157. doi:10.1007/s00170-015-7993-2.
  • Kannan, G., and V. P. Vinay. 2008. “Multi-criteria Decision Making for the Selection of CAD/CAM System.” International Journal of Interacting Design and Manufacturing 2 (3): 151–159. doi:10.1007/s12008-008-0045-5.
  • Kaufmann, A., and M. M. Gupta. 1985. Introduction to Fuzzy Arithmetic: Theory and Applications. New York: Van Nostrand Reinhold.
  • Kuo, R. J., S. C. Chi, and S. S. Kao. 2002. “A Decision Support System for Selecting Convenience Store Location through Integration of Fuzzy AHP and Artificial Neural Network.” Computers in Industry 47 (2): 199–214. doi:10.1016/S0166-3615(01)00147-6.
  • Lee, A. R. 1999. “Application of Modified Fuzzy AHP Method to Analyze Bolting Sequence of Structural Joints.” UMI Dissertation Services, A Bell & Howell Company.
  • Lee, W. B., H. Lau, Z. Z. Liu, and S. Tam. 2001. “A Fuzzy Analytic Hierarchy Process Approach in Modular Product Design.” Expert Systems 18 (1): 32–42. doi:10.1111/1468-0394.00153.
  • Lootsma, F. A. 1997. Fuzzy Logic for Planning and Decision Making. Dordrecht: Kluwer Academic Publisher.
  • Mulliner, E., N. Malys, and V. Maliene. 2016. “Comparative Analysis of MCDM Methods for the Assessment of Sustainable Housing Affordability.” Omega 59: 146–156. doi:10.1016/j.omega.2015.05.013.
  • Murtaza, M. B. 2003. “Fuzzy-AHP Application to Country Risk Assessment.” American Business Review 21: 109–116.
  • Negoita, C. V. 1985. Expert Systems and Fuzzy Systems. Menlo Park, CA: Benjamin/Cummings.
  • Piippo, P., M. Torkkeli, and M. Tuominen. 1999. “Use of GDSS for Selection of Technology: New Integrated CAD-system for an Entire Company.” Int’l Conf. on the Management of Engineering and Technology (PICMET ‘99), Portland, USA, 25-29 July 1, p. 13.
  • Roshanaei, V., B. Vahdani, and S. M. Mousavi. 2013. “CAD/CAM System Selection: A Multi-Component Hybrid Fuzzy MCDM Model.” Arabic Journal of Science and Engineering 8 (9): 2579–2594. doi:10.1007/s13369-012-0514-9.
  • Saaty, T. L. 1981. The Analytic Hierarchy Process. New York: McGraw-Hill.
  • Saaty, T. L. 1989. “Decision Making, Scaling, and Number Crunching.” Decision Science 20 (2): 404–409. doi:10.1111/j.1540-5915.1989.tb01887.x.
  • Sagar, S., P. Mathur, and A. Sharma. 2015. “Multi-criteria Selection of Software Components Using Fuzzy AHP Approach. International Journal of Innovative Computing.” Information and Control 11 (3): 1045–1058.
  • Tscheiker-Gratl, F., P. Egger, W. Rauch, and M. Kleidorfer. 2017. “Comparison of Multi-criteria Decision Support Methods for Integrated Rehabilitation Prioritization.” Water 9 (815): 1–28. doi:10.3390/w9100815.
  • Van Laarhoven, P. J. M., and Pedrycz. 1983. “A Fuzzy Extension of Saaty`s Priority Theory.” Fuzzy Sets and Systems 11 (1–3): 229–241. doi:10.1016/S0165-0114(83)80082-7.
  • Weck, M., F. Klocke, H. Schell, and E. Ruenauver. 1997. “Evaluating Alternative Production Cycles Using the Extended Fuzzy AHP Method.” European Journal of Operational Research 100 (2): 351–366. doi:10.1016/S0377-2217(96)00295-0.
  • Zadeh, L. A. 1994. “Fuzzy Logic, Neural Network and Soft Computing.” Communications of the ACM 37 (3): 77–84. doi:10.1145/175247.175255.
  • Zahedi, F. 1986. “The Analytic Hierarchy Process: A Survey of the Method and Its Applications.” Interfaces 16 (4): 96–108. doi:10.1287/inte.16.4.96.
  • Zakria, G., Z. Guan, Y. Riaz, M. Jahanzaib, and A. Khan. 2010. “Selecting and Prioritizing Key Factors for CAD/CAM Software in Small- and Medium-sized Enterprises Using AHP.” Frontier Mechanical Engineering China 5 (2): 157–164. doi:10.1007/s11465-010-0017-x.
  • Zimmermann, H. J. 1985. Fuzzy Set Theory and Its Applications. Boston: Kluwer Academic Publishers.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.