Dynamic Spatiotemporal scheduling of hull parts under complex constraints in shipbuilding workshop

, &
Pages 123-148 | Received 12 Jul 2022, Accepted 07 Dec 2022, Published online: 03 Jan 2023

References

  • Addanki, R., S. B. Venkatakrishnan, S. Gupta, H. Mao, and M. Alizadeh. 2019. “Placeto: Learning Generalizable Device Placement Algorithms for Distributed Machine Learning.” doi:10.48550/arXiv.1906.08879.
  • Arima, S., A. Kobayashi, Y. Wang, K. Sakurai, and Y. Monma. 2015. “Optimization of Re-Entrant Hybrid Flows with Multiple Queue Time Constraints in Batch Processes of Semiconductor Manufacturing.” IEEE Transactions on Semiconductor Manufacturing 28 (4): 528–544. doi:10.1109/TSM.2015.2478281.
  • Bai, X., M. Cao, W. Yan, and S. S. Ge. 2020. “Efficient Routing for Precedence-Constrained Package Delivery for Heterogeneous Vehicles.” IEEE Transactions on Automation Science and Engineering 17 (1): 248–260. doi:10.1109/TASE.2019.2914113.
  • Belhe, U., and A. Kusiak. 1995. “Resource Constrained Scheduling of Hierarchically Structured Design Activity Networks.” IEEE Transactions on Engineering Management 42 (2): 150–158. doi:10.1109/17.387271.
  • Belhe, U., and A. Kusiak. 1997. “Dynamic Scheduling of Design Activities with Resource Constraints.” IEEE Transactions on Systems, Man and Cybernetics Part A, Systems and Humans 27 (1): 105–111. doi:10.1109/3468.553229.
  • Bona, B., P. Brandimarte, C. Greco, and G. Menga. 1990. “Hybrid Hierarchical Scheduling and Control Systems in Manufacturing.” IEEE Transactions on Robotics and Automation 6 (6): 673–686. doi:10.1109/70.63270.
  • Bo, L., Z. Zhao, and G. Li. 2005. “A Dynamic Scheduling Method for Spatial Layout Planning.” 2005 International Conference on Machine Learning and Cybernetics, Guangzhou, China, August 18-21. doi:10.1109/icmlc.2005.1527568.
  • Buzacott, J. A., and J. G. Shanthikumar. 1992. “Design of Manufacturing Systems Using Queueing Models.” Queueing Systems 12 (1–2): 135–213. doi:10.1007/BF01158638.
  • Chatterjee, A., M. Borokhovich, L. R. Varshney, and S. Vishwanath. 2018. “Efficient and Flexible Crowdsourcing of Specialized Tasks with Precedence Constraints.” IEEE/ACM Transactions on Networking 26 (2): 879–892. doi:10.1109/TNET.2018.2811736.
  • Chazelle, C. 1983. “The Bottomn-Left Bin-Packing Heuristic: An Efficient Implementation.” IEEE Transactions on Computers C-32, no. 8: 697–707. doi:10.1109/TC.1983.1676307.
  • Cheng, Y. Y., and H. J. Shaw. 2015. “Cloud-Based, Service-Oriented and Knowledge-Sharing Architecture: Its Design and Application in Shipbuilding.” International Journal of Computer Integrated Manufacturing 28 (2): 137–154. doi:10.1080/0951192X.2013.874587.
  • Cho, H., C. Kim, J. Sun, A. Easwaran, J. D. Park, and B. C. Choi. 2020. “Scheduling Parallel Real-Time Tasks on the Minimum Number of Processors.” IEEE Transactions on Parallel and Distributed Systems 31 (1): 171–186. doi:10.1109/TPDS.2019.2929048.
  • Crainic, T. G., G. Perboli, and R. Tadei. 2008. “Extreme Point-Based Heuristics for Three-Dimensional Bin Packing.” INFORMS Journal on Computing 20 (3): 368–384. doi:10.1287/ijoc.1070.0250.
  • Cui, W., H. Wang, and B. Jan. 2019. “Simulation Design of AGVS Operating Process in Manufacturing Workshop.” Youth Academic Annual Conference of Chinese Association of Automation, Jinzhou, China, June 06-08. doi:10.1109/YAC.2019.8787622.
  • Dai, Q., and S. Li. 2011. “Optimization of Wind Turbine Vane Manufacture Based on Queuing Theory.” IEEE 18th International Conference on Industrial Engineering and Engineering Management, Changchun, China, September 03-05. doi:10.1109/ICIEEM.2011.6035282.
  • Fraga-Lamas, P., D. Noceda-Davila, T. M. Fernández-Caramés, M. A. Díaz-Bouza, and M. V. Montesinos. 2016. “Smart Pipe System for a Shipyard 4.0.” Sensors (Basel, Switzerland) 16 (12): 2186. doi:10.3390/s1612218.
  • Han, Y. S., J. Lee, J. Lee, W. Lee, and K. Lee. 2019. “3D CAD Data Extraction and Conversion for Application of Augmented/Virtual Reality to the Construction of Ships and Offshore Structures.” International Journal of Computer Integrated Manufacturing 32 (7): 658–668. doi:10.1080/0951192x.2019.1599440.
  • He, Q., X. Jiang, N. Guan, and Z. Guo. 2019. “Intra-Task Priority Assignment in Real-Time Scheduling of DAG Tasks on Multi-Cores.” IEEE Transactions on Parallel and Distributed Systems 30 (10): 2283–2295. doi:10.1109/TPDS.2019.2910525.
  • Jeong, D., D. Kim, T. Choi, and Y. Seo. 2020. “A Process-Based Modeling Method for Describing Production Processes of Ship Block Assembly Planning.” Processes 8 (7): 880. doi:10.3390/pr8070880.
  • Kang, D., H. Kim, B. K. Choi, and B. H. Kim. 2015. “Event Graph Modeling of a Heterogeneous Job Shop with Inline Cells.” Proceedings of the Winter Simulation Conference 2014, Savannah, GA, USA, December 07-10. doi:10.1109/WSC.2014.7020060.
  • Kim, H., S. S. Lee, J. H. Park, and J. G. Lee. 2005. “A Model for a Simulation-Based Shipbuilding System in a Shipyard Manufacturing Process.” International Journal of Computer Integrated Manufacturing 18 (6): 427–441. doi:10.1080/09511920500064789.
  • Koenigsberg, E. 1958. “Cyclic Queues.” Operational Research Quarterly 9 (1): 22–35. doi:10.1057/jors.1958.3.
  • Koh, S., C. Eom, J. Jang, and Y. Choi. 2008. “An Improved Spatial Scheduling Algorithm for Block Assembly Shop in Shipbuilding Company.” 2008 3rd International Conference on Innovative Computing Information and Control, Dalian, China, June 18–20. doi:10.1109/ICICIC.2008.146.
  • Kumar, S., and P. R. Kumar. 2001. “Queueing Network Models in the Design and Analysis of Semiconductor Wafer Fabs.” IEEE Transactions on Robotics and Automation 17 (5): 548–561. doi:10.1109/70.964657.
  • Laili, Y., F. Tao, L. Zhang, and B. R. Sarker. 2012. “A Study of Optimal Allocation of Computing Resources in Cloud Manufacturing Systems.” International Journal of Advanced Manufacturing Technology 63 (5–8): 671–690. doi:10.1007/s00170-012-3939-0.
  • Lee, J. M., Y. K. Jeong, and J. H. Woo. 2018. “Development of an Evaluation Framework of Production Planning for the Shipbuilding Industry.” International Journal of Computer Integrated Manufacturing 31 (9): 831–847. doi:10.1080/0951192X.2018.1449968.
  • Lee, Y. G., S. Ju, and J. H. Woo. 2020. “Simulation-Based Planning System for Shipbuilding.” International Journal of Computer Integrated Manufacturing 33 (6): 626–641. doi:10.1080/0951192X.2020.1775304.
  • Lee, K. J., J. K. Lee, and S. Y. Choi. 1996. “A Spatial Scheduling System and Its Application to Shipbuilding: DAS-CURVE.” Expert Systems with Applications 10 (3): 311–324. doi:10.1016/0957-4174(96)00010-3.
  • Li, X., D. Li, J. Wan, C. Liu, and M. Imran. 2018. “Adaptive Transmission Optimization in SDN-Based Industrial Internet of Things with Edge Computing.” IEEE Internet of Things Journal 5 (3): 1351–1360. doi:10.1109/JIOT.2018.2797187.
  • Li, D., C. Zhang, G. Tian, X. Shao, and Z. Li. 2018. “Multiobjective Program and Hybrid Imperialist Competitive Algorithm for the Mixed-Model Two-Sided Assembly Lines Subject to Multiple Constraints.” IEEE Transactions on Systems, Man, and Cybernetics Systems 48 (1): 119–129. doi:10.1109/TSMC.2016.2598685.
  • Mao, H., M. Schwarzkopf, S. Venkatakrishnan, Z. Meng, and M. Alizadeh. 2019. “Learning Scheduling Algorithms for Data Processing Clusters.” Proceedings of the ACM Special Interest Group on Data Communication, Beijing, China, August 19-23. doi:10.1145/3341302.3342080.
  • Nam, J. H., J. H. Lee, and J. H. Woo. 2016. “Construction of Standardised Data Structure for Simulation of Mid-Term Scheduling of Shipbuilding Process.” International Journal of Computer Integrated Manufacturing 29 (4): 424–437. doi:10.1080/0951192X.2015.1066031.
  • Nouri, M., and M. Ghodsi. 2012. “Scheduling Tasks with Exponential Duration on Unrelated Parallel Machines.” Discrete Applied Mathematics 160 (16–17): 2462–2473. doi:10.1016/j.dam.2012.06.010.
  • Park, C., K. Chung, J. Park, K. Cho, T. Baek, and E. Son. 2002. “A Spatial Scheduling Application at the Block Paint Shop in Shipbuilding: The HYPOS Project.” Production Planning & Control 13 (4): 342–354. doi:10.1080/095372802760108309.
  • Rahman, H. F., R. K. Chakrabortty, and M. J. Ryan. 2020. “Memetic Algorithm for Solving Resource Constrained Project Scheduling Problems.” Automation in Construction 111: 103052. doi:10.1016/j.autcon.2019.103052.
  • Raj, P., and R. K. Srivastava. 2007. “Analytical and Heuristic Approaches for Solving the Spatial Scheduling Problem.” IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 02-04. doi:10.1109/IEEM.2007.4419361.
  • Ryu, C., J. G. Shin, O. H. Kwon, and J. M. Lee. 2008. “Development of Integrated and Interactive Spatial Planning System of Assembly Blocks in Shipbuilding.” International Journal of Computer Integrated Manufacturing 21 (8): 911–922. doi:10.1080/09511920701819163.
  • Sánchez-Sotano, A., A. Cerezo-Narváez, F. Abad-Fraga, A. Pastor-Fernández, and J. Salguero-Gómez. 2020. “Trends of Digital Transformation in the Shipbuilding Sector.” New Trends in the Use of Artificial Intelligence for the Industry 4.0. doi:10.5772/intechopen.91164.
  • Shamos, M. I., and F. P. Preparata. 2012. Computational Geometry: An Introduction. New York: Springer.
  • Shu, C., Z. Zhao, Y. Han, G. Min, and H. Duan. 2020. “Multi-User Offloading for Edge Computing Networks: A Dependency-Aware and Latency-Optimal Approach.” IEEE Internet of Things Journal 7 (3): 1678–1689. doi:10.1109/JIOT.2019.2943373.
  • Tomescu, A. I., T. Gagie, A. Popa, R. Rizzi, A. Kuosmanen, and V. Makinen. 2015. “Explaining a Weighted DAG with Few Paths for Solving Genome-Guided Multi-Assembly.” IEEE/ACM Transactions on Computational Biology and Bioinformatics 12 (6): 1345–1354. doi:10.1109/TCBB.2015.2418753.
  • Varghese, R., and D. Y. Yoon. 2005. “Dynamic Spatial Block Arrangement Scheduling in Shipbuilding Industry Using Genetic Algorithm.” IEEE International Conference on Industrial Informatics, Perth, WA, Australia, August 10-12. doi:10.1109/INDIN.2005.1560417.
  • Wang, S., X. Li, and R. Ruiz. 2020. “Performance Analysis for Heterogeneous Cloud Servers Using Queueing Theory.” IEEE Transactions on Computers 69 (4): 563–576. doi:10.1109/TC.2019.2956505.
  • Wan, J., X. Li, H. Dai, A. Kusiak, M. Martinez-Garcia, and D. Li. 2021. “Artificial-Intelligence-Driven Customized Manufacturing Factory: Key Technologies, Applications, and Challenges.” Proceedings of the IEEE 109 (4): 377–398. doi:10.1109/JPROC.2020.3034808.
  • Woo, J. H., and D. Oh. 2018. “Development of Simulation Framework for Shipbuilding.” International Journal of Computer Integrated Manufacturing 31 (2): 210–227. doi:10.1080/0951192X.2017.1407452.
  • Wu, K., and N. Zhao. 2016. “Mean Queue Time Approximation for a Workstation with Cascading.” 2016 Winter Simulation Conference, Washington, DC, USA, December 11-14. doi:10.1109/WSC.2016.7822304.
  • Xu, J., and R. Nagi. 2013. “Solving Assembly Scheduling Problems with Tree-Structure Precedence Constraints: A Lagrangian Relaxation Approach.” IEEE Transactions on Automation Science and Engineering 10 (3): 757–771. doi:10.1109/TASE.2013.2259816.
  • Zhang, T., and O. Rose. 2013. “Simulation-Based Overhead-Crane Scheduling for a Manufacturing Plant.” Winter Simulations Conference, Washington, DC, USA, December 08-11. doi:10.1109/WSC.2013.6721635.
  • Zhang, B., and Y. Yang. 2015. “Solving Production Scheduling with Chain Constraints in Parallel Production Lines by Column Generation.” Proceeding of the 11th World Congress on Intelligent Control and Automation, Shenyang, China, June 29-July 04. doi:10.1109/WCICA.2014.7052818.
  • Zhang, Z., K. Yang, and Y. Dai. 2010. “PSO-Based Spatial Scheduling Algorithm for Hull Curved Block Construction.” International Conference on Natural Computation, Yantai, China, August 10-12. doi:10.1109/ICNC.2010.5583857.
  • Zhao, Y., X. Xu, and H. Li. 2017. “Throughputs Maximization of Stochastic Customer Orders Under Two Production Schemes.” IEEE Transactions on Automation Science and Engineering 14 (2): 745–757. doi:10.1109/TASE.2017.2670609.
  • Zheng, J., Z. Jiang, F. Chen, and Q. Chen. 2008. “Minimizing Makespan at Module Assembly Shop in Shipbuilding.” IEEE International Conference on Service Operations and Logistics, and Informatics, Beijing, China, October 12-15. doi:10.1109/SOLI.2008.4682821.
  • Zheng, J., Z. Jiang, Q. Chen, and Q. Liu. 2011. “Spatial Scheduling Algorithm Minimising Makespan at Block Assembly Shop in Shipbuilding.” International Journal of Production Research 49 (8): 2351–2371. doi:10.1080/00207541003709536.
  • Zhou, J., R. Xu, and J. Zhu. 2020. “Research on Typical Application of Intelligent Shipbuilding Based on 5G Communication Technology.” IEEE International Conference on Artificial Intelligence and Computer Applications, Dalian, China, June 27-29. doi:10.1109/ICAICA50127.2020.9182624.
  • Zhu, Y., and B. Hu. 2021. “Smart-mDag: An Intelligent Scheduling Method for Multi-DAG Jobs.” International Conference on Information and Communication Technology Convergence, Jeju Island, Republic of Korea, October 20-22. doi:10.1109/ICTC52510.2021.96211.
  • Zhu, F., Z. Liu, Z. Yan, and Y. Liang. 2018. “A Study into Employee Scheduling Problem Based on Graph Theory Algorithms.” IEEE Integrated STEM Education Conference, Princeton, NJ, USA, March 10-10. doi:10.1109/ISECon.2018.8340484.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.