References
- The 1p_solve package can be found atftp://ftp.ics.ele.tue.nl/pub/lp_solve/
- Crauwels H. A. J. Potts C. N. Van Oudheusden D. Van Wassenhove L. N. 2003 Branch and bound algorithms for single machine scheduling with batching to minimize the number of late jobs Journal of Scheduling (accepted)
- Drexl , A. and Kimms , A. 1997 . Lot sizing and scheduling – survey and extensions . European Journal of Operational Research , 99 : 221 – 235 .
- Ham I. Hitomi K. Yoshida T. 1985 Group Technology: Applications to Production Management Boston Kluwer-Nijhoff
- Maes , J. and Van Wassenhove , L. N. 1998 . Multi-item single-level capacitated dynamic lot-sizing heuristics: a general review . Journal of the Operational Research Society , 39 ( 11 ) : 991 – 1004 .
- Nagendra , P. , Das , S. and Nathan , S. 2000 . Deriving the detailed machine schedule from a weekly MRP requirement . Production Planning & Control , 11 ( 6 ) : 547 – 555 .
- Potts , C. N. and Van Wassenhove , L. N. 1992 . Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity . Journal of the Operational Research Society , 43 : 395 – 406 .
- Potts , C. N. and Kovalyov , M. Y. 2000 . Scheduling with batching: a review . European Journal of Operational Research , 120 : 228 – 249 .
- Webster , S. and Baker , K. R. 1995 . Scheduling groups of jobs on a single machine . Operations Research , 43 : 692 – 703 .