A model for considering the impact of rescheduling planned maintenance activities in a maintenance service contract

, &
Pages 241-259 | Received 02 May 2011, Accepted 04 Feb 2012, Published online: 28 Feb 2012

References

  • Aggoune, R. 2004. “Minimizing the makespan for the flow shop scheduling problem with availability constraints.” European Journal of Operational Research 153(3): 534–543.
  • Aghezzaf, E. H., M. A. Jamali, and D. Ait-Kadi. 2007. “An integrated production and preventive maintenance planning model.” International Journal of Operational Research 181(2): 679–685.
  • Aghezzaf, E., and N. Najid. 2008. “Integrated production planning and preventive maintenance in deteriorating production systems.” Information Sciences 178(17): 3382–3392.
  • Budai, G. Dekker, R., and Nicolai, R. 2006. A review of planning models for maintenance and production, Economic Institute Report 2006–44.
  • Cassandry, C. R., and E. Kutanoglu. 2003. “Minimizing job tardiness using integrated preventive maintenance planning and production scheduling.” IIE Transactions 35(6): 503–513.
  • Cassandry, C. R., and E. Kutanoglu. 2005. “Integrating preventive maintenance planning and production scheduling for a single machine.” IEEE Transactions on Reliability 54(2): 304–309.
  • Chelbi, A., and D. Ait-Kadi. 2004. “Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance.” European Journal of Operational Research 156(3): 712–718.
  • Chelbi, A., D. Ait-Kadi, and M. Radhoui. 2008. “An integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demand.” European Journal of Operational Research 46(19): 5427–5440.
  • Chelbi, A., and N. Rezg. 2006. “Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level.” International Journal of Production Economics 99(1–2): 131–143.
  • Chen, W.-J. 2007. “Minimizing total flow time and maximum tardiness with periodic maintenance.” Journal of Quality in Maintenance Engineering 13(3): 293–303.
  • Chen, J. S. 2008. “Scheduling of non-resumable jobs and flexible maintenance activities on a single machine to minimize makespan.” European Journal of Operational Research 190(1): 90–102.
  • Crespo Marquez, A., J. N. D. Gupta, and J. P. Ignizio. 2006. “Improving preventive maintenance scheduling in semiconductor fabrication facilities.” Production Planning & Control 17(7): 742–754.
  • Fumagalli, L.. et al., 2010. Economic value of technologies in an e-maintenance platform, In: Preprints of 1st IFAC workshop, A-MEST'10, advanced maintenance engineering, services and technology, Lisboa, Portugal, 1–2 July.
  • Garg, A., and S. G. Deshmukh. 2010. “Engineering support issues for flexibility in maintenance.” Asia Pacific Journal of Marketing and Logistics 22(2): 247–270.
  • Gómez, J. F., et al. 2009. “Outsourcing maintenance in services providers.” In Safety, reliability and risk analysis: theory, methods and applications, edited by A. Martorell, et al., 829–837. London: Taylor & Francis Group.
  • Harland, C., R. Brenchley, and H. Walker. 2003. “Risk in supply networks.” Journal of Purchasing and Supply Management 9(2): 51–62.
  • Ho, C. J., and P. L. Carter. 1996. “An investigation of alternative dampening procedure to cope with MRP system nervousness.” International Journal of Production Research 34(1): 137–156.
  • Ho, C. J., W. K. Law, and R. Rampal. 1995. “Uncertainty-dampening methods for reducing MRP system nervousness.” International Journal of Production Research 33(2): 483–496.
  • Horngren, C., G. Foster, and S. Datar. 2000. Cost accounting: a managerial emphasis. Englewood Cliffs, NJ: Prentice-Hall.
  • Ji, M., Y. He, and T. C. E. Cheng. 2007. “Single-machine scheduling with periodic maintenance to minimize makespan.” Computer and Operations Research 34(6): 1764–1770.
  • Kadipasaoglu, S. N., and V. Sridharan. 1997. “Measurement of instability in multi-level MRP systems.” International Journal of Production Research 35(3): 713–717.
  • Kim, S.-H., M. A. Cohen, and S. Netessine. 2007. “Performance contracting in after-sales service supply chains.” Management Science 53(12): 1843–1858.
  • Kubiak, W., et al. 2002. “Two-machine flow shops with limited machine availability.” European Journal of Operational Research 136(3): 528–540.
  • Kumar, R., T. Markeset, and U. Kumar. 2004. “Maintenance of machinery – Negotiating service contracts in business-to-business marketing.” International Journal of Service Industry Management 15(4): 400–413.
  • Kuo, Y., and Z. Chang. 2007. “Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process.” Naval Research Logistics 54(6): 589–708.
  • Lee, C. Y. 1999. “Two-machine flow shop scheduling with availability constraints.” European Journal of Operational Research 114(2): 420–429.
  • Lee, C. Y., and Z. L. Chen. 2000. “Scheduling jobs and maintenance activities on parallel machines.” Naval Research Logistics 47(2): 145–165.
  • Legnani, E., S. Cavalieri, and S. Ierace. 2009. “A framework for the configuration of after-sales service processes.” Production Planning & Control 20(2): 113–124.
  • Liao, L.-M., and C.-H. Tsai. 2009. “Heuristic algorithms for two-machine flow shop with availability constraints.” Computers and Industrial Engineering 56(1): 306–311.
  • Mirghani, M. A. 2001. “A framework for costing planned maintenance.” Journal of Quality in Maintenance Engineering 7(3): 170–182.
  • Oyarbide-Zubillaga, A., A. Goti, and A. Sanchez. 2008. “Preventive maintenance optimization of multi-equipment manufacturing systems by combining discrete event simulation and multi-objective evolutionary algorithms.” Production Planning & Control 19(4): 342–355.
  • Panesar, S. S., and T. Markeset. 2008. “Industrial service innovation through improved contractual relationship: a case study in maintenance.” Journal of Quality in Maintenance Engineering 14(3): 290–305.
  • Pistikopolos, E. N., et al. 2001. “Interactions of maintenance and production planning for multipurpose process plants – a system effectiveness approach.” Industrial and Engineering Chemistry Research 40(14): 3195–3207.
  • Portioli-Staudacher, A. and Tantardini M., 2008. Production and maintenance integrated management: proposal and validation of a model in the case of outsourced maintenance. In: 10th international conference on the modern information technology in the innovation processes of the industrial enterprises, MITIP 2008, Prague, 148–154.
  • Qi, X., T. Chen, and F. Tu. 1999. “Scheduling the maintenance on a single machine.” Journal of the Operational Research Society 50(10): 1071–1078.
  • Radhoui, M., N. Rezg, and A. Chelbi. 2009. “Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems.” European Journal of Operational Research 47(2): 389–402.
  • Rezg, N., S. Dellagi, and A. Chelbi. 2008. “Joint optimal inventory control and preventive maintenance policy.” European Journal of Operational Research 46(19): 5349–5365.
  • Rishel, T. D., and D. P. Christy. 1996. “Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level.” International Journal of Production Research 34(2): 421–446.
  • Ruiz, R., J. C. García-Díaz, and C. Maroto. 2007. “Considering scheduling and preventive maintenance in the flow shop sequencing problem.” Computers & Operations Research 34(11): 3314–3330.
  • Tam, A. S. B., W. M. Chan, and J. W. H. Price. 2006. “Optimal maintenance intervals for a multi-component system.” Production Planning & Control 17(8): 769–779.
  • Taracki, H., et al. 2006. “Maintenance outsourcing of a mulyi-process manufacturing system with multiple contractors.” IIE Transactions 38(1): 67–78.
  • Weinstein, L., and C. H. Chung. 1999. “Integrating maintenance and production decisions in a hierarchical production planning environment.” Computers & Operations Research 26(10–11): 1059–1074.
  • Yin, R. K. 1994. Case study research: design and methods. 2nd ed. Thousand Oaks: Sage.
  • Yulan, J., J. Zuhua, and H. Wenrui. 2008. “Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine.” International Journal of Advanced Manufacturing Technology 39(9–10): 954–964.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.