Publication Cover
Production Planning & Control
The Management of Operations
Volume 25, 2014 - Issue 10
1,161
Views
6
CrossRef citations to date
0
Altmetric
Articles

Revised MRP for reducing inventory level and smoothing order releases: a case in manufacturing industry

, &
Pages 814-820 | Received 27 Jul 2012, Accepted 15 Dec 2012, Published online: 12 Mar 2013

References

  • Blackburn, J. D., D. H. Kropp, and R. A. Millen. 1986. “A comparison of strategies to dampen nervousness in MRP systems.” Management Science 32 (4): 413–419.
  • Bregni, A., M. D’Avino, and M. Schiraldi. 2011. “A new approach to lower MRP nervousness.” In Annals of DAAAM for 2011 & Proceedings of the 22nd International DAAAM Symposium, edited by B. Katalinic, 1513–1514. Vienna: DAAAM International.
  • Carlson, R., S. Beckman, and D. Kropp. 1982. “The effectiveness of extending the horizon in rolling production scheduling.” Decision Science (13), 129–146.
  • Chen, F., Z. Drezner, J. K. Ryan, and D. Simchi-Levi. 2000. “Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information.” Management Science 46 (3): 436–443.
  • D’Avino, M., A. Bregni, and M. Schiraldi. 2012. “A revised and improved version of the MRP algorithm: Rev MRP.” Beijin: ICMMM 2012 Conference on Manufacturing and Materials Engineering.
  • Forrester, J. 1958. “Industrial dynamics: A major breakthrough for decision-makers.” Harvard Business Review 36 (4): 37–66.
  • Hadley, G., and T. M. Whitin. 1963. Analysis of Inventory Systems. Englewood Cliffs, NJ: Prentice-Hall.
  • Ho, C.-J. 1999. “Evaluating the effectiveness of using lot-sizing rules to cope with MRP system nervousness.” Production Planning & Control 10 (2): 150–161.
  • Ho, C.-J., and T. C. Ireland. 1998. “Correlating MRP system nervousness with forecast errors.” International Journal of Production Research 36 (8): 2285–2299.
  • Ho, C.-J., S.-C. Kim, and M. Koo. 2001. “MRP system performance under lumpy demand environments.” Production Planning & Control 12 (1): 316–325.
  • Iannone, R., A. Lambiase, S. Miranda, and S. Riemma. 2006. Performance improvement of a supply chain network with on-line management of backward scheduling: A simulation study. Flexible Automation and Intelligent Manufacturing. Proceedings 16th International conference.
  • Inderfurth, K. 1994. “Nervousness in Inventory Control: Analytical Results.” OR Spectrum 16 (2): 113–123.
  • Kimms, A. 1998. “Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing.” Omega 26 (3): 355–366.
  • Lee, T. S., and E. Everett. 1986. “Forecasting error evaluation in material requirements planning (MRP) production-inventory systems.” Management Science 32 (9): 1186–1205.
  • Lee, H. L., V. Padmanabhan, and S. Whang. 1997. “The bullwhip effect in supply chains.” Sloan Management Review 38 (3): 93–102.
  • Mather, H. 1977. “Reschedule the schedules you just scheduled – Way of life for MRP?” Journal of Production and Inventory Management 18 (1): 60–79.
  • Orlicky, J. 1975. Material Requirements Planning: The new way of life in Production and Inventory Management. New York, NY: McGraw-Hill.
  • Protopappa-Sieke, M., and R. Seifert. 2010. “Interrelating operational and financial performance measurements in inventory control.” European Journal of Operational Research 204 (3): 439–448.
  • Steele, D. 1975. “The nervous MRP System: How to do battle.” Production and Inventory Management 16 (4): 83–89.
  • Taal, M., and J. C. Wortmann. 1997. “Integrating MRP and finite capacity planning.” Production Planning and Control 8 (3): 245–254.
  • Vollman, B., and J. Whybark. 1988. Manufactury Planning and Control Systems. Massachusetts, Massachusetts: Irwin McGraw-Hill.
  • Vollman, B., and J. Whybark. 2005. Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill.
  • Wemmerlov, U. 1979. Design factors in MRP systems: A limited survey. Production and Inventory Management 20 (4): 15–35.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.