Publication Cover
Production Planning & Control
The Management of Operations
Volume 26, 2015 - Issue 5
1,869
Views
25
CrossRef citations to date
0
Altmetric
Articles

Maintenance spare parts planning and control: a framework for control and agenda for future research

, , , &
Pages 407-426 | Received 11 Mar 2013, Accepted 13 Mar 2014, Published online: 14 Apr 2014

References

  • Adan, I. J. B. F., A. Sleptchenko, and G. J. Van Houtum. 2009. “Reducing Costs of Spare Parts Supply Systems via Static Priorities.” Asia-Pacific Journal of Operational Research 26 (4): 559–585.10.1142/S0217595909002377
  • Akçay, Y., and S. H. Xu. 2004. “Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-order System.” Management Science 50 (1): 99–116.10.1287/mnsc.1030.0167
  • Alfredsson, P. 1997. “Optimization of Multi-echelon Repairable Item Inventory Systems with Simultaneous Location of Repair Facilities.” European Journal of Operational Research 99: 584–595.10.1016/S0377-2217(96)00322-0
  • Alfredsson, P., and J. Verrijdt. 1999. “Modeling Emergency Supply Flexibility in a Two-echelon Inventory System.” Management Science 45 (10): 1416–1431.10.1287/mnsc.45.10.1416
  • Altay, N., and L. A. Litteral, eds. 2011. Service Parts Management: Demand Forecasting and Inventory Control. New York: Springer.
  • Bailey, G. J., and M. M. Helms. 2007. “MRO Inventory Reduction – Challenges and Management: A Case Study of the Tennessee Valley Authority.” Production Planning & Control 18 (3): 261–270.
  • Barros, L. L., and M. Riley. 2001. “A Combinatorial Approach to Level of Repair Analysis.” European Journal of Operational Research 129 (2): 242–251.10.1016/S0377-2217(00)00221-6
  • Basten, R. J. I., M. C. van der Heijden, and J. M. J. Schutten. 2011. “A Minimum Cost Flow Model for Level of Repair Analysis.” International Journal of Production Economics 133 (1): 233–242.10.1016/j.ijpe.2010.03.025
  • Basten, R. J. I., J. M. J. Schutten, and M. C. van der Heijden. 2009. “An Efficient Model Formulation for Level of Repair Analysis.” Annals of Operations Research 172 (1): 119–142.10.1007/s10479-009-0516-5
  • Basten, R. J. I., and G. J. Van Houtum. 2013. System-oriented Inventory Models for Spare Parts. Beta working paper 422. Eindhoven University of Technology, Eindhoven.
  • Benjaafar, S., W. L. Cooper, and S. Mardan. 2011. “Production-inventory Systems with Imperfect Advance Demand Information and Updating.” Naval Research Logistics 58 (2): 88–106.10.1002/nav.v58.2
  • Bitran, G. R., E. A. Haas, and A. C. Hax. 1981. “Hierarchical Production Planning: A Single Stage System.” Operations Research 29 (4): 717–743.10.1287/opre.29.4.717
  • Bitran, G. R., E. A. Haas, and A. C. Hax. 1982. “Hierarchical Production Planning: A Two-stage System.” Operations Research 30 (2): 232–251.10.1287/opre.30.2.232
  • Bitran, G. R., and A. C. Hax. 1977. “On the Design of Hierarchical Production Planning Systems.” Decision Sciences 8: 28–55.10.1111/deci.1977.8.issue-1
  • Borst, S., A. Mandelbaum, and M. I. Reiman. 2004. “Dimensioning Large Call Centers.” Operations Research 52 (1): 17–34.10.1287/opre.1030.0081
  • Box, G. E. P., and G. M. Jenkins. 1970. Time Series Analysis, Forecasting and Control. San Francisco, CA: Holden-Day.
  • Bradley, J. R., and H. H. Guerrero. 2009. “Lifetime Buy Decisions with Multiple Obsolete Parts.” Production and Operations Management 18 (1): 114–126.
  • Caggiano, K. E., J. A. Muckstadt, and J. A. Rappold. 2006. “Integrated Real-time Capacity and Inventory Allocation for Repairable Service Parts in a Two-echelon Supply System.” Manufacturing & Service Operations Management 8 (3): 292–319.
  • Cavalieri, S., M. Garetti, M. Macchi, and R. Pinto. 2008. “A Decision-making Framework for Managing Maintenance Spare Parts.” Production Planning & Control 19 (4): 379–396.
  • Chakravarthy, S. R., and A. Agarwal. 2003. “Analysis of a Machine Repair Problem with an Unreliable Server and Phase Type Repairs and Services.” Naval Research Logistics 50 (5): 462–480.10.1002/(ISSN)1520-6750
  • Chatfield, C. 2004. The Analysis of Time Series: An Introduction. Boca Raton, FL: Chapman & Hall/CRC.
  • Cohen, M. A., Y. Zheng, and V. Agrawal. 1997. “Service Parts Logistics: A Benchmark Analysis.” IIE Transactions 29: 627–639.
  • Croston, J. D. 1972. “Forecasting and Stock Control for Intermittent Demands.” Journal of the Operational Research Society 23 (3): 289–303.10.1057/jors.1972.50
  • Dempster, M. A. H., M. L. Fisher, L. Jansen, B. J. Lageweg, J. K. Lenstra, and A. H. G. Rinnooy Kan. 1981. “Analytical Evaluation of Hierarchical Planning Systems.” Operations Research 29 (4): 707–716.10.1287/opre.29.4.707
  • Díaz, A., and M. C. Fu. 1997. “Models for Multi-echelon Repairable Item Inventory Systems with Limited Repair Capacity.” European Journal of Operational Research 97: 480–492.10.1016/S0377-2217(96)00279-2
  • Ebeling, C. E. 1997. Introduction to Reliability and Maintainability Engineering. Long Grove, IL: McGraw-Hill.
  • Fransoo, J. C., and V. C. S. Wiers. 2006. “Action Variety of Planners: Cognitive Load and Requisite Variety.” Journal of Operations Management 24: 813–821.10.1016/j.jom.2005.09.008
  • Fransoo, J. C., and V. C. S. Wiers. 2008. “An Empirical Investigation of the Neglect of MRP Information by Production Planners.” Production Planning & Control 19 (8): 781–787.
  • Graves, S. C. 1985. “A Multi-echelon Inventory Model for a Repairable Item with One-for-one Replenishment.” Management Science 31 (10): 1247–1256.10.1287/mnsc.31.10.1247
  • Guide Jr, V. D. R., and R. Srivastava. 1997. “Repairable Inventory Theory: Models and Applications.” European Journal of Operational Research 102: 1–20.10.1016/S0377-2217(97)00155-0
  • Guide Jr, V. D. R., R. Srivastava, and M. E. Kraus. 2000. “Priority Scheduling Policies for Repair Shops.” International Journal of Production Research 38 (4): 929–950.10.1080/002075400189220
  • Hariharan, R., and P. Zipkin. 1995. “Customer-order Information, Leadtimes, and Inventories.” Management Science 41 (10): 1599–1607.10.1287/mnsc.41.10.1599
  • Hausman, W. H., and G. D. Scudder. 1982. “Priority Scheduling Rules for Repairable Inventory Systems.” Management Science 28 (11): 1215–1232.10.1287/mnsc.28.11.1215
  • Hax, A. C. 1978. “Aggregate Production Planning.” In Handbook of Operations Research Models and Applications, edited by J. J. Moder and S. E. Elmaghraby, 53–69. New York: Van Nostrand-Reinhold.
  • Hax, A. C., and H. C. Meal. 1975. “Hierarchical Integration of Production Planning and Scheduling.” In Studies in Management Sciences Vol. 1 Logistics, edited by M. A. Geisler, 53–69. Amsterdam: North-Holland-American Elsevier.
  • Head, K. L., P. B. Mirchandani, and D. Sheppard. 1992. “Hierarchical Framework for Real-time Traffic Control.” Transportation Research Record 1360: 82–88.
  • Heng, A., S. Zhang, A. C. C. Tan, and J. Mathew. 2009. “Rotating Machinery Prognostics: State of the Art, Challenges and Opportunities.” Mechanical Systems and Signal Processing 23: 72–739.
  • Hopp, W. J., and M. L. Spearman. 2001. Factory Physics. New York: McGraw-Hill.
  • Hua, Z. S., B. Zhang, J. Yang, and D. S. Tan. 2007. “A New Approach of Forecasting Intermittent Demand for Spare Parts Inventories in the Process Industries.” Journal of the Operational Research Society 58: 52–61.10.1057/palgrave.jors.2602119
  • Huiskonen, J. 2001. “Maintenance Spare Parts Logistics: Special Characteristics and Strategic Choices.” International Journal of Production Economics 71: 125–133.10.1016/S0925-5273(00)00112-2
  • Iglehart, D. L. 1965. “Limiting Diffusion Approximations for the Many Server Queue and the Repairman Problem.” Journal of Applied Probability 2: 429–441.10.2307/3212203
  • Ivanov, D. 2010. “An Adaptive Framework for Aligning (Re)planning Decisions on Supply Chain Strategy, Design, Tactics, and Operations.” International Journal of Production Research 48 (13): 3999–4017.10.1080/00207540902893417
  • Kennedy, W. J., J. D. Wayne Patterson, and L. D. Fredendall. 2002. “An Overview of Recent Literature on Spare Parts Inventories.” International Journal of Production Economics 76: 201–215.10.1016/S0925-5273(01)00174-8
  • Kranenburg, A. A., and G. J. Van Houtum. 2007. “Effect of Commonality on Spare Parts Provisioning Costs for Capital Goods.” International Journal of Production Economics 108: 221–227.10.1016/j.ijpe.2006.12.025
  • Kranenburg, A. A., and G. J. Van Houtum. 2009. “A New Partial Pooling Structure for Spare Parts Networks.” European Journal of Operational Research 199 (3): 908–921.10.1016/j.ejor.2009.01.057
  • Lee, H. L. 1987. “A Multi-echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments.” Management Science 33 (10): 1302–1316.10.1287/mnsc.33.10.1302
  • Lu, Y., J. S. Song, and Y. Zhao. 2010. “No-holdback Allocation Rules for Continuous-time Assemble-to-order Systems.” Operations Research 58 (3): 691–705.10.1287/opre.1090.0785
  • Meal, H. C. 1984. “Putting Production Decisions Where They Belong.” Harvard Business Review 62: 102–111.
  • Muckstadt, J. A. 1973. “A Model for a Multi-item, Multi-echelon, Multi-indenture Inventory System.” Management Science 20 (4): 472–481.10.1287/mnsc.20.4.472
  • Muckstadt, J. A. 2005. Analysis and Algorithms for Service Parts Supply Chains. New York: Springer.
  • Nelson, W. 1982. Applied Life Data Analysis. New York: Wiley.10.1002/0471725234
  • Öner, K. B., G. P. Kiesmüller, and G. J. Van Houtum. 2010. “Optimization of Component Reliability in the Design Phase of Capital Goods.” European Journal of Operational Research 205: 615–624.
  • Paterson, C, G. P. Kiesmüller, R. Teunter, and K. Glazebrook. 2011. “Inventory Models with Lateral Transshipments: A Review.” European Journal of Operational Research 210 (2): 125–136.10.1016/j.ejor.2010.05.048
  • Pinedo, M. L. 2009. Planning and Scheduling in Manufacturing and Services. New York: Springer.10.1007/978-1-4419-0910-7
  • Schneeweiss, C. A. 1998. “Hierarchical Planning in Organizations: Elements of a General Theory.” International Journal of Production Economics 56–57: 547–556.10.1016/S0925-5273(96)00109-0
  • Schneeweiss, C. A. 2003. “Distributed Decision Making – A Unified Approach.” European Journal of Operational Research 150: 237–252.10.1016/S0377-2217(02)00501-5
  • Schneeweiss, C. A., and H. Schröder. 1992. “Planning and Scheduling the Repair Shops of the Deutsche Lufthansa AG: A Hierarchical Approach.” Production and Operations Management 1 (1): 22–33.
  • Schneeweiss, C. A., and K. Zimmer. 2004. “Hierarchical Coordination Mechanisms within the Supply Chain.” European Journal of Operational Research 153: 687–703.10.1016/S0377-2217(02)00801-9
  • Scudder, G. D. 1985. “An Evaluation of Overtime Policies for a Repair Shop.” Journal of Operations Management 6 (1): 87–98.10.1016/0272-6963(85)90037-3
  • Scudder, G. D. 1986. “Scheduling and Labour-assignment Policies for a Dual-constrained Repair Shop.” International Journal of Production Research 24 (3): 623–634.10.1080/00207548608919755
  • Scudder, G. D., and R. C. H. Chua. 1987. “Determining Overtime Policies for a Repair Shop.” Omega 15 (3): 197–206.10.1016/0305-0483(87)90070-3
  • Sherbrooke, C. C. 1968. “Metric: A Multi-echelon Technique for Recoverable Item Control.” Operations Research 16 (1): 122–141.10.1287/opre.16.1.122
  • Sherbrooke, C. C. 1986. “Vari-metric: Improved Approximations for Multi-indenture, Multi-echelon Availability Models.” Operations Research 34 (2): 311–319.10.1287/opre.34.2.311
  • Sherbrooke, C. C. 2004. Optimal Inventory Modeling of Systems: Multi-echelon Techniques. New York: Wiley.
  • Silver, E. A., D. F. Pyke, and R. Peterson. 1998. Inventory Management and Production Planning and Scheduling. Hoboken, NJ: Wiley.
  • Sleptchenko, A., M. C. van der Heijden, and A. van Harten. 2002. “Effects of Finite Repair Capacity in Multi-echelon, Multi-indenture Service Part Supply Systems.” International Journal of Production Economics 79: 209–230.10.1016/S0925-5273(02)00155-X
  • Stamatis, D. H. 1995. Failure Mode and Effect Analysis. Milwaukee, WI: ASQC Quality press.
  • STD-1390D MIL. 1993. Level of Repair Analysis (LORA). Technical Report, Military Standard. United States Department of Defense, MIL-STD-1390D.
  • Teunter, R., and L. Duncan. 2009. “Forecasting Intermittent Demand: A Comparative Study.” Journal of the Operational Research Society 60: 321–329.10.1057/palgrave.jors.2602569
  • Teunter, R. H., and L. Fortuin. 1999. “End-of-life Service.” International Journal of Production Economics 59: 487–497.10.1016/S0925-5273(98)00112-1
  • Teunter, R. H., and W. K. K. Haneveld. 1998. “The ‘Final Order Problem.” European Journal of Operational Research 107: 35–44.10.1016/S0377-2217(97)00133-1
  • Van Kooten, J. P. J., and T. Tan. 2009. “The Final Order Problem for Repairable Spare Parts under Condemnation.” Journal of the Operational Research Society 60: 1449–1461.10.1057/jors.2008.111
  • Van Weele, A. J. 2010. Purchasing and Supply Chain Management. 5th ed. London: Cengage.
  • Verrijdt, J., I. Adan, and T. de Kok. 1998. “A Trade Off between Emergency Repair and Inventory Investment.” IIE Transactions 30: 119–132.
  • Wagner, S. M., and E. Lindemann. 2008. “A Case Study-based Analysis of Spare Parts Management in the Engineering Industry.” Production Planning & Control 19 (4): 397–407.
  • Wang, W., and A. A. Syntetos. 2011. “Spare Parts Demand: Linking Forecasting to Equipment Maintenance.” Transportation Research Part E: Logistics and Transportation Review 47 (6): 1194–1209.10.1016/j.tre.2011.04.008
  • Wiers, V. C. S. 2009. “The Relationship between Shop floor Autonomy and APS Implementation Success: Evidence from Two Cases.” Production Planning & Control 20 (7): 576–585.
  • Willemain, T. R., C. N. Smart, and H. F. Schwarz. 2004. “A New Approach to Forecasting Intermittent Demand for Service Parts Inventories.” International Journal of Forecasting 20: 375–387.10.1016/S0169-2070(03)00013-X
  • Yin, R. K. 2003. Applications of Case Study Research. Thousand Oaks, CA: Sage.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.