Publication Cover
Production Planning & Control
The Management of Operations
Volume 27, 2016 - Issue 2
411
Views
6
CrossRef citations to date
0
Altmetric
Articles

Improving labour relations performance using a Simplified Drum Buffer Rope (S-DBR) technique

&
Pages 102-113 | Received 27 Aug 2014, Accepted 20 Jul 2015, Published online: 28 Aug 2015

References

  • Baker, K. R. 1984. “The Effects of Input Control in a Simple Scheduling Model.” Journal of Operations Management 4 (2): 99–112.10.1016/0272-6963(84)90026-3
  • Chakravorty, S. S. 2001. “An Evaluation of the DBR Control Mechanism in a Job Shop Environment.” OMEGA: The International Journal of Management Science 29 (4): 335–342.
  • Chakravorty, S. S. 2011. “Natural Selection.” Quality Progress 44 (10): 30–35.
  • Chakravorty, S. S., and P. R. Verhoeven. 1996. “Learning the Theory of Constraints with a Simulation Game.” Simulation & Gaming 27 (2): 223–237.
  • Chang, Y., and W. Huang. 2011. “Using Simplified Drum-Buffer-Rope for Re-entrant Flow Shop Scheduling in a Random Environment.” African Journal of Business Management 5 (26): 796–810.
  • Childe, S. J. 2011. “Case Studies in Operations Management.” Production Planning & Control. 22 (2): 195–219.
  • Cooper, A. H. 2014. “Anderson Cooper 360.” CNN News, February–April, New York. www.cnn.com.
  • Darlington, J., M. Francis, P. Found, and A. Thomas 2015. “Design and Implementation of a Drum-Buffer-Rope Pull-System.” Production Planning & Control 26 (6): 489–504.
  • Deming, W. E. 1986. Out of the Crisis. Cambridge, MA: MIT Press.
  • Ewing Jr, P. L., W. Tarantino, and G. S. Parnell. 2006. “Use of Decision Analysis in the Army Base Realignment and Closure (BRAC) 2005 Military Value Analysis.” Decision Analysis 3 (1): 33–49.10.1287/deca.1060.0062
  • Fredendall, L., D. Ojha, J. Wayne Patterson. 2010. “Concerning the Theory of Work Load Control.” European Journal of Operational Research 201 (1): 99–111.10.1016/j.ejor.2009.02.003
  • Goldratt, E. M. 2006. Reliable Rapid Response Strategy and Tactics Tree. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M., and J. Cox. 1984. The Goal. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M., and R. E. Fox. 1986. The Race. Croton-on-Hudson, NY: North River Press.
  • Goldratt, E. M., R. Goldratt, E. Abramov. 2002. “Strategy and Tactics.” Goldratt Consulting. Available online at www.goldrattconsulting.com.
  • Hales, D., V. Sridharan, A. Radhakrishnan, S. Chakravorty, and S. Siha. 2008. “Testing the Accuracy of Employee-reported Data: An Inexpensive Approach to Traditional Methods.” European Journal of Operational Research 189: 583–593.10.1016/j.ejor.2006.09.092
  • Harrod, S., and J. Kanet. 2013. “Applying Work Flow Control in Make-to-Order Job Shops.” International Journal of Production Economics 143: 620–626.10.1016/j.ijpe.2012.02.017
  • Huang, Y. L., C. Huang, and R. K. Li. 2011. “Using Simplified Drum-Buffer-Rope to Rapidly Improve Operational Performance: A Case Study in China.” Production and Inventory Management Journal 47 (1): 80–93.
  • Lawrence, S. R., and A. H. Buss. 1994. “Shifting Production Bottlenecks: Causes, Cures, and Conundrums.” Production and Operations Management 3 (1): 21–37.
  • Liker, J. K. 2004. The Toyota Way. New York: McGraw Hill.
  • Lindbeck, Assar, and Dennis Snower. 1996. “Reorganization of Firms and Labor-Market Inequality.” The American Economic Review, American Economic Assoc. Publishers 86 (20): 315–321.
  • Moodie, D. R. 1999. “Demand Management: The Evaluation of Price and Due Date Negotiation Strategies Using Simulation.” Production and Operations Management 8 (2): 151–162.
  • Onur, L., and W. J. Fabrycky. 1987. “An Input/Output Control System for the Dynamic Job Shop.” IIE Transactions 19 (1): 88–97.10.1080/07408178708975374
  • Otal, C. A., and W. Melhuish. 2013. “A Model for Realignment and Consolidation: Applying BRAC Principles to the Federal Financial Management and System Environment.” The Journal of Government Financial Management 62 (2): 20–26.
  • Pyzdek, T., and P. Keller. 2009. The Six Sigma Handbook. New York: McGraw-Hill.
  • Rahman, Shams-ur. 1998. “Theory of Constraints: A Review of the Philosophy and its Applications.” International Journal of Operations & Production Management 18 (4): 336–355.
  • Scheinkopf, L. J. 2010. “Thinking Process including and S&T Tree.” In Theory of Constraints Handbook, edited by J. F. Cox and J. G. Schleier Jr., 134–136. New York: McGraw-Hill.
  • Schragenheim, E. 2010. “From DBR to Simplified DBR for Make-to-Order.” In Theory of Constraints Handbook, edited by J. F. Cox and J. G. Schleier Jr., 89–90. New York: McGraw-Hill.
  • Schragenheim, E., and H. W. Dettmer. 2000. Manufacturing at Warp Speed: Optimizing Supply Chain Business Performance. Boca Raton, FL: St. Lucie Press.
  • Schragenheim, E., H. W. Dettmer, and J. W. Patterson. 2009. Supply Chain Management at Warp Speed: Integrating the System from End to End. Boca Raton, FL: CRC Press.10.1201/9781420073362
  • Schragenheim, E., and B. Ronen. 1991. “Buffer Management: A Diagnostic Tool for Production Control.” Production and Inventory Management Journal 32 (2): 74–79.
  • Simons, J. V., and W. P. Simpson. 1997. “An Exposition of Multiple Constraint Scheduling as Implemented in the Goal System (Formerly Disaster).” Production and Operations Management 34 (1): 3–22.
  • Umble, M. M., and M. L. Srikanth. 1990. Synchronous Manufacturing. Cincinnati, OH: South-Western.
  • Womack, J. P., and D. T. Jones. 2003. Lean Thinking: Banish Waste and Create Wealth. New York: Free Press.
  • Wright, P., T. Gardner, and L. Moynihan. 2006. “The Impact of HR Practices on the Performance of Business Units.” Human Resource Management Journal 13 (3): 21–36.
  • Yin, R. K. 2013. Case Study Research: Design and Methods. 5th ed. Thousand Oaks, CA: Sage.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.