Variability propagation in the production planning and control mechanism of construction projects

ORCID Icon &
Pages 707-726 | Received 27 Aug 2015, Accepted 01 Mar 2017, Published online: 29 Mar 2017

References

  • Alarcón, Luis F., and David B. Ashley. 1999. “Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule.” In 7th Annual Conference of the International Group for Lean Construction, 263–274. http://iglc.net/Papers.
  • Alarcón, Luis F., and Omar Zegarra. 2012. “Identifying the Bullwhip Effect of the Last-planner Conversations During the Construction Stage.” In 20th Annual Conference of the International Group for Lean Construction. http://iglc.net/Papers/Details/745.
  • Ballard, Glenn, and Gregory Howell. 1994. “Implementing Lean Construction: Stabilizing Work Flow.” In Lean Construction, edited by Luis Alarcón, 1997th ed., 101–110. Rotterdam: Balkema.
  • Ballard, Glenn, and Gregory Howell. 1998. “Shielding Production: Essential Step in Production Control.” Journal of Construction Engineering and Management 124 (1): 11–17. doi:10.1061/(ASCE)0733-9364(1998)124:1(11).
  • Ballard, Glenn, and Gregory Howell. 2003. “Lean Project Management.” Building Research & Information 31 (2): 119–133. doi:10.1080/09613210301997.
  • Ballard, Glenn, Lauri Koskela, Gregory A. Howell, and Iris D. Tommelein. 2005. “Discussion of ‘Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle’ by H. Randolph Thomas, Michael J. Horman, R. Edward Minchin Jr., and Dong Chen.” Journal of Construction Engineering and Management 131 (5): 615–616. doi:10.1061/(ASCE)0733-9364(2005)131:5(615).
  • Ballard, Glenn, and Iris Tommelein. 2012. “Lean Management Methods for Complex Projects.” Engineering Project Organization Journal 2 (1–2): 85–96. doi:10.1080/21573727.2011.641117.
  • Bartlett, Albert A.. 1993. “The Arithmetic of Groth: Methods of Calculation.” Population and Environment 14 (4): 359–387.10.1007/BF01270916
  • Bartolomei, Jason E., Daniel E. Hastings, Richard de Neufville, and Donna H. Rhodes. 2012. “Engineering Systems Multiple-domain Matrix: An Organizing Framework for Modeling Large-scale Complex Systems.” Systems Engineering 15 (1): 41–61.10.1002/sys.v15.1
  • Betts, Mike, Graham Robinson, Charles Burton, Leonard Jeremy, and Amit Sharda. 2013. “Global Construction 2025 A Global Forecast for the Construction Industry to 2025.” http://www.globalconstruction2025.com/.
  • Boisot, Max, and Bill McKelvey. 2011. “Complexity and Organization-environment Relations: Revisiting Ashby’s Law of Requisite Variety’.” In The SAGE Handbook of Complexity and Management, edited by Peter Allen, Steve Maguire, and Bill McKelvey, 279–298. Thousand Oaks, CA: SAGE.
  • Brockwell, Peter J., and Richard A. Davis. 2002. Introduction to Time Series and Forecasting. Springer Texts in Statistics. New York, NY: Springer New York. doi:10.1007/b97391.
  • Burbidge, John L. 1990. “Production Control: A Universal Conceptual Framework.” Production Planning & Control 1 (1): 3–16.
  • Cachon, G. P., T. Randall, and G. M. Schmidt. 2007. “In Search of the Bullwhip Effect.” Manufacturing & Service Operations Management 9 (4): 457–479. doi:10.1287/msom.1060.0149.
  • Cartin, Thomas J. 1999. Tools for Continuous Improvement Principles and Practices of Organizational Performance Excellence. Milwaukee, WI: ASQ Quality Press.
  • Chakravorty, S. S., and J. Brian Atwater. 2006. “Bottleneck Management: Theory and Practice.” Production Planning & Control 17 ( March 2015): 441–447. doi:10.1080/09537280600682752.
  • Choi, Thomas Y., Kevin J. Dooley, and Manus Rungtusanatham. 2001. “Supply Networks and Complex Adaptive Systems: Control Versus Emergence.” Journal of Operations Management 19 (3): 351–366.10.1016/S0272-6963(00)00068-1
  • Dooley, K. J., and A. H. Van de Ven. 1999. “Explaining Complex Organizational Dynamics.” Organization Science 10 (3): 358–372.10.1287/orsc.10.3.358
  • Eisenhardt, K. M. 1989. “Building Theories from Case Study Research.” Academy of Management Review 14 (4): 532–550.
  • Endsley, Mica R. 1995. “Toward a Theory of Situation Awareness in Dynamic Systems.” Human Factors: The Journal of the Human Factors and Ergonomics Society 37 (1): 32–64.10.1518/001872095779049543
  • Flores, C. F., and J. Ludlow. 1981. “Doing and Speaking in the Office.” In DSS: Issues and Challenges, edited by G. Fick and R. Sprague. London: Pergamon Press.
  • Flyvbjerg, Bent, Mette Skamris Holm, and Soren Buhl. 2002. “Underestimating Costs in Public Works Projects.” APA Journal 68 (3): 279–295. doi:10.1080/01944360208976273.
  • Forbes, Lincoln H., and Syed M. Ahmed. 2011. Productivity and Performancce Measurement in Construction. Modern Construction: Lean Project Delivery and Integrated Practices. Boca Raton, FL: CRC Press Taylor & Francis Group 6000 Broken Sound Parkway NW, Suite 300 Boca Raton, FL 33487-2742. doi:10.1515/9783990434550.
  • Fransoo, Jan C., and Marc J. F. Wouters. 2000. “Measuring the Bullwhip Effect in the Supply Chain.” Supply Chain Management: An International Journal 5 (2): 78–89. doi:10.1108/13598540010319993.
  • Forrester, Jay W. 1958. “Industrial Dynamics – A Major Breakthrought for Decision Makers.” Harvard Business Review 36 (4): 37–66.
  • Galloway, Patricia D. 2006. “Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects.” Journal of Construction Engineering and Management 132 (7): 697–711. doi:10.1061/(ASCE)0733-9364(2006)132:7(697).
  • Geary, S., S. M. Disney, and D. R. Towill. 2006. “On Bullwhip in Supply Chains—Historical Review, Present Practice and Expected Future Impact.” International Journal of Production Economics 101 (1): 2–18. doi:10.1016/j.ijpe.2005.05.009.
  • Gonzalez, V., L. F. Alarcon, and F. Mundaca. 2008. “Investigating the Relationship between Planning Reliability and Project Performance.” Production Planning & Control 19 (5): 461–474. doi:10.1080/09537280802059023.
  • Guinery, Jane, and Bart MacCarthy. 2009. “Managing Key Interfaces in Production Planning and Control.” Production Planning & Control 20 (1): 40–56.10.1080/09537280802658535
  • Hedström, Peter, and Petri Ylikoski. 2010. “Causal Mechanisms in the Social Sciences.” Annual Review of Sociology 36 (1): 49–67.10.1146/annurev.soc.012809.102632
  • Henrich, Guilherme, and Lauri Koskela. 2006. “Evolution of Production Management Methods in Construction.” Construction in the XXI Century: Local and Global Challenges ARTEC, 1–10.
  • Heylighen, Francis, and Clément Vidal. 2008. “Getting Things Done: The Science behind Stress-Free Productivity.” Long Range Planning 41 (6): 585–605.
  • Holland, J. H. 1995. Hidden Order: How Adaptation Builds Complexity. New York: Addison-Wesley.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics: Foundation of Manufacturing Management. 2nd ed. Boston, MA: Irwin/McGraw- Hill.
  • Howell, Gregory A., Glenn Ballard, Iris D. Tommelein, Lauri Koskela, H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Završki. 2004. “Closure to ‘Reducing Variability to Improve Performance as a Lean Construction Principle’ by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavřski.” Journal of Construction Engineering and Management 130 (2). American Society of Civil Engineers: 299–300. doi:10.1061/(ASCE)0733-9364(2004)130:2(299).
  • Jameson, Ian. 2006. “Australian National Algae Culture Collection (ANACC).” http://www.marine.csiro.au/microalgae/methods/.
  • Koenigsberg, E., and K. N. McKay. 2010. “A Taxonomy for Understanding the Origins of Production Control.” Production Planning & Control 21 (5): 437–451. doi:10.1080/09537280903441518.
  • Koskela, Lauri, and Glenn Ballard. 2006. “Should Project Management Be Based on Theories of Economics or Production?” Building Research & Information 34 (2): 154–163. doi:10.1080/09613210500491480.
  • Kurtz, Cynthia F., and David J. Snowden. 2003. “The New Dynamics of Strategy: Sense-making in a Complex and Complicated World.” IBM Systems Journal 42 (3): 462–483.10.1147/sj.423.0462
  • Leal, Mauricio, and Luis F. Alarcón. 2010. “Quantifying Impacts of Last PlannerTM Implementation in Industrial Mining Projects.” In 18th Annual Conference of the International Group for Lean Construction, 518–527. http://iglc.net/Papers.
  • Lee, Hau L., V. Padmanabhan, and Seungjin Whang. 2004. “Information Distortion in a Supply Chain: The Bullwhip Effect.” Management Science 50 (4): 546–558. doi:10.1287/mnsc.1040.0266.
  • Lindhard, Søren. 2014. “Understanding the Effect of Variation in a Production System.” Journal of Construction Engineering and Management 140 (11): 4014051 doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000887.
  • Liu, Min, Glenn Ballard, and William Ibbs. 2011. “Work Flow Variation and Labor Productivity: Case Study.” Journal of Management in Engineering 27 (4): 236–242.10.1061/(ASCE)ME.1943-5479.0000056
  • Macomber, Hal, and Gregory A. Howell. 2003. “Linguistic Action: Contributing to the Theory of Lean Construction.” In Proceedings of the 11th Annual Meeting of the International Group for Lean Construction. Blacksburg, Virginia, 1–10. http://iglc.net/Papers.
  • Macomber, Hal, Gregory A. Howell, and Dean Reed. 2005. “Managing Promises With the Last Planner System: Closing in on Uninterrupted Flow.” In 13th Annual Conference of the International Group for Lean Construction, 13–18.
  • Maddala, G. S., and Ellen M. Miller. 1989. Microeconomics : Theory and Applications (Spanish Edition). Translated and Edited by Julio Coro and Agustín Cue. México: First Edit.
  • Maguire, Steve, Peter Allen, and Bill McKelvey. 2011. “Complexity and Management: Introducing the SAGE Handbook.” In The SAGE Handbook of Complexity and Management, edited by P. Allen, Steve Maguire, and B. McKelvey, 1–26. Thousand Oaks, CA 91320: SAGE Publications Ltd.
  • Malone, Thomas W., and Kevin Crowston. 1994. “The Interdisciplinary Study of Coordination.” ACM Computing Surveys 26 (1): 87–119. doi:10.1145/174666.174668.
  • Marks, Michelle A., John E. Mathieu, and Stephen J. Zaccaro. 2001. “A Temporally Based Framework and Taxonomy of Team Processes.” Academy of Management Review 26 (3): 356–376.
  • McKelvey, Bill, and Max Boisot. 2009. “Redefining Strategic Foresight: ‘Fast’ and ‘Far’ Sight via Complexity Science.” In Handbook of Research on Straregy and Foresight, edited by Laura Anna Costanzo, and Robert Bradley MacKay, 15–47. Cheltenham UK, Northampton, MA: Edward Elgar.
  • Merali, Yasmin, and Peter Allen. 2011. “Complexity and Systems Thinking.” In The SAGE Handbook of Complexity and Management, edited by Peter Allen, Steve Maguire, and Bill McKelvey, 27–52. Thousand Oaks, CA: Sage.
  • Mintzberg, H. 1978. “Patterns in Strategy Formation.” Management Science 24 (9): 934–948.10.1287/mnsc.24.9.934
  • Moscoso, Philip G., Jan C. Fransoo, and Dieter Fischer. 2010. “An Empirical Study on Reducing Planning Instability in Hierarchical Planning Systems.” Production Planning & Control 21 (4): 413–426. doi:10.1080/09537280903454172.
  • NIST/SEMATECH (National Institute of Standards and Technology/) 2013. “NIST/SEMATECH E-Handbook of Statistical Methods.” http://www.itl.nist.gov/div898/handbook/.
  • Olhager, J., and J. Wikner. 2000. “Production Planning and Control Tools.” Production Planning & Control 11 (3): 210–222. doi:10.1080/095372800232180.
  • Park, Moonseo, and Feniosky Peña-Mora. 2004. “Reliability Buffering for Construction Projects.” Journal of Construction Engineering and Management 130 (5): 626–637. doi:10.1061/(ASCE)0733-9364(2004)130:5(626).
  • Paulson, Boyd C. 1976. “Designing to Reduce Construction Costs.” Journal of the Construction Division 102 (4): 587–592.
  • Pereira, Pedro, Nuno Cachadinha, Omar Zegarra, and Luis Alarcón. 2013. “Bullwhip Effect in Production Control a Comparison Between Traditional Methods and LPS.” In 21th Annual Conference of the International Group for Lean Construction, 619–628. Available at http://iglc.net/Papers/Details/939.
  • PMI (Project Management Institute) 2004. A Guide to the Project Management Body of Knowledge (PMBOK Guide). 3rd ed. Sp. Newtown Square, PA: Project Management Institute.
  • Schoop, Mareike. 2001. “An Introduction to the Language-Action Perspective.” ACM SIGGROUP Bulletin 22 (2): 3–8. doi:10.1145/605676.605677.
  • Snowden, David J., and Me Mary E. Boone. 2007. “A Leader’s Framework for Decision Making.” Harvard Business Review 85 (11): 68–76.
  • Sterman, John D. 2006. “Operational and Behavioral Causes of Supply Chain Instability.” In The Bullwhip Effect in Supply Chains, edited by O. Carranza and F. Villegas, 2–36. London: Palgrave Macmillan.
  • Thomas, H. Randolph, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavřski. 2002. “Reducing Variability to Improve Performance as a Lean Construction Principle.” Journal of Construction Engineering and Management 128 (2): 144–154. doi:10.1061/(ASCE)0733-9364(2002)128:2(144).
  • Tommelein, Iris D. 1998. “Pull-driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique.” Journal of Construction Engineering and Management 124 (4): 279–88. doi:10.1061/(ASCE)0733-9364(1998)124:4(279).
  • Tommelein, Iris D., David R. Riley, and Greg A. Howell. 1999. “Parade Game: Impact of Work Flow Variability on Trade Performance.” Journal of Construction Engineering and Management 125 (5): 304–310. doi:10.1061/(ASCE)0733-9364(1999)125:5(304).
  • Winch, Graham M., and John Kelsey. 2005. “What Do Construction Project Planners Do?” International Journal of Project Management 23 (2): 141–49.
  • Winograd, Terry. 1987. “A Language/Action Perspective on the Design of Cooperative Work.” Human-Computer Interaction 3 (1): 3–30. doi:10.1207/s15327051hci0301_2.
  • Winograd, Terry, and Fernando Flores. 1986. Understanding Computers and Cognition: A New Foundation for Design. Norwood, NJ: Ablex Publishing Corporation.
  • Wysocki, Robert K. 2011. How to Plan a TPM Project. Wiley: Effective Project Management: Traditional, Agile, Extreme. 6th ed. Indianapolis, IN: Wiley.
  • Yin, Robert K. 2013. Case Study Research: Design and Methods. Thousand Oaks, CA: Sage.
  • Zegarra, Omar. 2012. “Lean Project Dynamics: Análisis Y Modelo de Control de La Inestabilidad En El Last Planner System [Lean Project Dynamics: Analysis and Control Model of the Instability in the Last Planner System].” MA diss., Pontificia Universidad Católica de Chile.
  • Zegarra, Omar, and Luis Fernando Alarcón. 2013. “Propagation and Distrotions of Variability into the Production Control System: Bullwhip of Conversations of the Last Planner.” In 21th Annual Conference of the International Group for Lean Construction, 589–598. Available at http://www.iglc.net/Papers/Details/964.
  • Zegarra, Omar, Luis Fernando Alarcón, Pedro Pereira, and Nuno Cachadinha. 2013. “Weekly Tracking of Stability of the Flow of Conversations into the Subprocesses of Last Planner System.” In 21th Annual Conference of the International Group for Lean Construction, 629–638. http://iglc.net/Papers/Details/965.
  • Zimmerman, Brenda. 2001. “Ralph Stacey’s Agreement & Certainty Matrix.” Edgeware, Plexus Institute. http://216.119.127.164/edgeware/archive/edgeplace/map.html.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.