Lean thinking in the highways construction sector: motivation, implementation and barriers

, ORCID Icon &
Pages 247-269 | Received 20 Aug 2017, Accepted 18 Nov 2017, Published online: 12 Dec 2017

References

  • Abdulmalek, F. A., and J. Rajgopal. 2007. “Analyzing the Benefits of Lean Manufacturing and Value Stream Mapping via Simulation: A Process Sector Case Study.” International Journal of Production Economics 107 (1): 223–236.10.1016/j.ijpe.2006.09.009
  • Achanga, P., E. Shehab, R. Roy, and G. Nelder. 2006. “Critical Success Factors for Lean Implementation within SMEs.” Journal of Manufacturing Technology Management 17 (4): 460–471.10.1108/17410380610662889
  • Åhlström, P. 1998. “Sequences in the Implementation of Lean Production.” European Management Journal 16 (3): 327–334.
  • Alarcon, L. F., and L. Seguel. 2002. “Developing Incentive Strategies for Implementation of Lean Construction.” Proceedings of the 10th Annual Conference of International Group for Lean Construction. Gramado: IGLC.
  • Almeida, J. C., and G. F. Salazar. 2003. “Strategic Issues in Lean Construction.” In Proceedings of the 11th Annual Conference of the International Group for Lean Construction. Blacksburg: IGLC.
  • Alves, T. C. D. L., and C. C. Tsao. 2007. “Lean Construction–2000 to 2006.” Lean Construction Journal 3 (1): 46–70.
  • Anand, G., and R. Kodali. 2009. “Development of a Framework for Lean Manufacturing Systems.” International Journal of Services and Operations Management 5 (5): 687–716.10.1504/IJSOM.2009.025121
  • Ansell, M., M. Holmes, R. Evans, C. Pasquire, and A. Price. 2007. “Lean Construction Trial on a Highways Maintenance Project.” In Proceedings of the 15th Annual Conference of the International Group for Lean Construction. East Lansing: IGLC.
  • Arbulu, R., G. Ballard, and N. Harper. 2003. “Kanban in Construction.” In Proceedings of the 11th Annual Conference of the International Group for Lean Construction. Blacksburg: IGLC.
  • Arbulu, R., and I. D. Tommelein. 2002. “Value Stream Analysis of Construction Supply Chains: Case Study on Pipe Supports Used in Power Plants.” In Proceedings of the 10th Annual Conference of International Group for Lean Construction. Gramado: IGLC.
  • Arbulu, R., and T. Zabelle. 2006. “Implementing Lean in Construction: How to Succeed.” In Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Santiago: IGLC.
  • Baldwin, J. S., P. M. Allen, B. Winder, and K. Ridgway. 2005. “Modelling Manufacturing Evolution: Thoughts on Sustainable Industrial Development.” Journal of Cleaner Production 13 (9): 887–902.10.1016/j.jclepro.2004.04.009
  • Ballard, G. 1997. “Lookahead Planning: The Missing Link in Production Control.” In Proceedings of the 5th Annual Conference of the International Group for Lean Construction. Gold Coast: IGLC.
  • Ballard, G. 1999. “Improving Work Flow Reliability.” In Proceedings of the 7th Annual Conference of the International Group for Lean Construction. Berkeley: IGLC.
  • Ballard, G., and G. Howell. 1998. “Shielding Production: Essential Step in Production Control.” Journal of Construction Engineering and Management 124 (1): 11–17.10.1061/(ASCE)0733-9364(1998)124:1(11)
  • Bamber, L., and B. G. Dale. 2000. “Lean Production: A Study of Application in a Traditional Manufacturing Environment.” Production Planning and Control 11 (3): 291–298.10.1080/095372800232252
  • Barlett, J. E., J. W. Kotrlik, and C. C. Higgins. 2001. “Organizational Research: Determining Appropriate Sample Size in Survey Research.” Information Technology, Learning, and Performance Journal 19 (1): 43–50.
  • Barros Neto, J. D. P., and T. D. C. L. Alves. 2007. “Strategic Issues in Lean Construction Implementation.” In Proceedings of the 15th Annual Conference of the International Group for Lean Construction. East Lansing: IGLC.
  • Baruch, Y. 1999. “Response Rate in Academic Studies: A Comparative Analysis.” Human Relations 52 (4): 421–438.
  • Bayo-Moriones, A., A. Bello-Pintado, and J. Merino-Díaz de Cerio. 2010. “5S Use in Manufacturing Plants: Contextual Factors and Impact on Operating Performance.” International Journal of Quality and Reliability Management 27 (2): 217–230.10.1108/02656711011014320
  • Becerik-Gerber, B., F. Jazizadeh, N. Li, and G. Calis. 2011. “Application Areas and Data Requirements for BIM-enabled Facilities Management.” Journal of Construction Engineering and Management 138 (3): 431–442.
  • Behera, P., R. P. Mohanty, and A. Prakash. 2015. “Understanding Construction Supply Chain Management.” Production Planning and Control 26 (16): 1332–1350.10.1080/09537287.2015.1045953
  • Ben Fredj-Ben Alaya, L. 2016. “VSM a Powerful Diagnostic and Planning Tool for a Successful Lean Implementation: A Tunisian Case Study of an Auto Parts Manufacturing Firm.” Production Planning & Control 27 (7–8): 563–578.
  • Berg, B. L. 2004. Qualitative Research Methods for the Social Sciences. London: Pearson Education.
  • Berroir, F., L. Harbouche, and C. Boton. 2015. “Top down vs. Bottom up Approaches regarding the Implementation of Lean Construction through a French Case Study.” In Proceedings of the 23rd Annual Conference of the International Group for Lean Construction. Perth: IGLC.
  • Bertelsen, S. 2004. “Lean Construction: Where are We and How to Proceed.” Lean Construction Journal 1 (1): 46–69.
  • Briscoe, G., and A. Dainty. 2005. “Construction Supply Chain Integration: An Elusive Goal?” Supply Chain Management: An International Journal 10 (4): 319–326.10.1108/13598540510612794
  • Bruun, P., and R. N. Mefford. 2004. “Lean Production and the Internet.” International Journal of Production Economics 89 (3): 247–260.10.1016/j.ijpe.2003.10.007
  • Chen, C., S. Housley, P. Sprague, and P. Goodlad. 2012. “Introducing Lean into the UK Highways Agency’s Supply Chain.” Proceedings of the Institution of Civil Engineers 165 (5): 34–39.
  • Cheng, R. 2016. Motivation and Means: How and Why IPD and Lean Lead to Success. Minneapolis, MN: Lean Construction Institute.
  • Chiarini, A. 2017. “An Adaptation of the EOQ Formula for JIT Quasi-Pull System Production.” Production Planning & Control 28 (2): 123–130.10.1080/09537287.2016.1237687
  • Colicchia, C., A. Creazza, and F. Dallari. 2017. “Lean and Green Supply Chain Management through Intermodal Transport: Insights from the Fast Moving Consumer Goods Industry.” Production Planning & Control 28 (4): 321–334.10.1080/09537287.2017.1282642
  • Costa, L. B. M., and M. Godinho Filho. 2016. “Lean Healthcare: Review, Classification and Analysis of Literature.” Production Planning & Control 27 (10): 823–836.10.1080/09537287.2016.1143131
  • Dainty, A. R., S. J. Millett, and G. H. Briscoe. 2001. “New Perspectives on Construction Supply Chain Integration.” Supply Chain Management: An International Journal 6 (4): 163–173.10.1108/13598540110402700
  • Dalal, A. F. 2010. “Keep it Simple.” Quality Progress 43 (9): 24–28.
  • Daniel, E. I., C. Pasquire, G. Dickens, and G. Ballard. 2017. “The Relationship between the Last Planner® System and Collaborative Planning Practice in UK Construction.” Engineering, Construction and Architectural Management 24 (3): 407–425.10.1108/ECAM-07-2015-0109
  • Deif, A. M. 2012. “Dynamic Analysis of a Lean Cell under Uncertainty.” International Journal of Production Research 50 (4): 1127–1139.10.1080/00207543.2011.556154
  • Diekman, J., M. Krewedl, T. Stewart, and S. Won. 2004. Application of Lean Manufacturing Principles to Construction: Technical Report 191–11 for Construction Industry Institute. Austin: The University of Texas at Austin.
  • Dora, M., M. Kumar, and X. Gellynck. 2016. “Determinants and Barriers to Lean Implementation in Food-Processing SMEs – A Multiple Case Analysis.” Production Planning & Control 27 (1): 1–23.10.1080/09537287.2015.1050477
  • Dos Santos, A., and J. Powell. 1999. “Potential of Poka-Yoke Devices to Reduce Variability in Construction.” In Proceedings of the 7th Annual Conference of the International Group for Lean Construction. Berkeley: IGLC.
  • Drucker, P. 1971. “What We Can Learn from Japanese Management.” Harvard Business Review, 49: 110–122.
  • Drysdale, D. 2013. “Introducing Lean Improvement into the UK Highways Agency Supply Chain.” In Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Fortaleza: IGLC.
  • Dubois, A., and L. E. Gadde. 2002. “The Construction Industry as a Loosely Coupled System: Implications for Productivity and Innovation.” Construction Management and Economics 20 (7): 621–631.10.1080/01446190210163543
  • EC (European Commission). 2015. “User Guide to the SME Definition.” EC. Accessed August 15, 2017. https://ec.europa.eu/docsroom/documents/15582/attachments/1/translations/en/renditions/pdf.
  • Egan, J. Sir. 1998. Rethinking Construction: Report of the Construction Task Force to the Deputy Prime Minister, Department of the Environment, Transport and the Regions. Norwich: Construction Task Force.
  • Eriksson, E. P. 2010. “Improving Construction Supply Chain Collaboration and Performance: A Lean Construction Pilot Project.” Supply Chain Management: An International Journal 15 (5): 394–403.10.1108/13598541011068323
  • Fawcett, S. E., and G. M. Magnan. 2002. “The Rhetoric and Reality of Supply Chain Integration.” International Journal of Physical Distribution & Logistics Management 32 (5): 339–361.
  • Fearne, A., and N. Fowler. 2006. “Efficiency versus Effectiveness in Construction Supply Chains: The Dangers of ‘Lean’ Thinking in Isolation.” Supply Chain Management: An International Journal 11 (4): 283–287.10.1108/13598540610671725
  • Filho, A. N. D. M., F. M. M. Filho, A. N. D. Miranda, and M. I. A. D. Miranda. 2005. “Improving the Root Pile Execution Process through Setup Time Reduction.” In Proceedings of the 21st Association of Researchers in Construction Management Conference. London: ARCOM.
  • Flynn, B. B., B. Huo, and X. Zhao. 2010. “The Impact of Supply Chain Integration on Performance: A Contingency and Configuration Approach.” Journal of Operations Management 28 (1): 58–71.10.1016/j.jom.2009.06.001
  • Formoso, C. T., A. D. Santos, and J. Powell. 2002. “An Exploratory Study on the Applicability of Process Transparency in Construction Sites.” Journal of Construction Research 03 (01): 35–54.10.1142/S1609945102000102
  • Frandson, A., K. Berghede, and I. D. Tommelein. 2013. “Takt Time Planning for Construction of Exterior Cladding.” In Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Fortaleza: IGLC.
  • Frandson, A., O. Seppänen, and I. D. Tommelein. 2015. “Comparison between Location Based Management and Takt Time Planning.” In Proceedings of the 23rd Annual Conference of the International Group for Lean Construction. Perth: IGLC.
  • Freire, J., and L. F. Alarcón. 2002. “Achieving Lean Design Process: Improvement Methodology.” Journal of Construction Engineering and Management 128 (3): 248–256.10.1061/(ASCE)0733-9364(2002)128:3(248)
  • Fujimoto, T. 1999. The Evolution of a Manufacturing System at Toyota. Oxford: Oxford University Press.
  • Fullalove, L. H. 2013. “Examples of Lean Techniques and Methodology Applied to UK Road Schemes.” In Proceedings of the 21st Annual Conference of the International Group for Lean Construction. Fortaleza: IGLC.
  • Gledson, B., and D. Greenwood. 2016. “Surveying the Extent and Use of 4D BIM in the UK.” Journal of Information Technology in Construction 21: 57–71.
  • Golhar, D. Y., and C. L. Stamm. 1991. “The Just-in-time Philosophy: A Literature Review.” International Journal of Production Research 29 (4): 657–676.10.1080/00207549108930094
  • Golicic, S. L., and S. S. Medland. 2007. “Size Might Matter: A Case Study of Lean Implementation in an SME.” In Proceedings of the Society for Marketing Advances. Kuala Lumpur: Society for Marketing Advances.
  • Gosling, J., and M. M. Naim. 2009. “Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–754.10.1016/j.ijpe.2009.07.002
  • Gosling, J., M. Pero, M. Schoenwitz, D. Towill, and R. Cigolini. 2016. “Defining and Categorizing Modules in Building Projects: An International Perspective.” Journal of Construction Engineering and Management 142 (11): 04016062.10.1061/(ASCE)CO.1943-7862.0001181
  • Green, S. 1999. “The Missing Arguments of Lean Construction.” Construction Management and Economics 17 (2): 133–137.10.1080/014461999371637
  • Green, S. 2002. “The Human Resource Management Implications of Lean Construction: Critical Perspectives and Conceptual Chasms.” Journal of Construction Research 03 (01): 147–165.10.1142/S1609945102000114
  • Green, S., and S. May. 2005. “Lean Construction: Arenas of Enactment, Models of Diffusion and the Meaning of ‘Leanness’.” Building Research and Information 33 (6): 498–511.10.1080/09613210500285106
  • Hamzeh, F. R., G. Ballard, and I. D. Tommelein. 2009. “Is the Last Planner System Applicable to Design?—A Case Study.” In Proceedings of the 17th Annual Conference of the International Group for Lean Construction. Taipei: IGLC.
  • Harvey, M. 2003. “Privatization, Fragmentation and Inflexible Flexibilization in the UK Construction Industry.” In Building Chaos: An International Comparison of Deregulation in the Construction Industry, edited by G. Bosch and P. Philips, 188–209. London: Routledge.
  • HE (Highways England). 2016. “Lean Support to Highways England.” HE. Accessed August 15, 2017. http://www.highwaysindustry.com/wp-content/uploads/2016/04/Lean_Strategy_Document_2015-2020__2_.pdf.
  • Heineck, L. F., P. E. Pereira, S. L. Kemmer, T. D. C. Alves, and J. D. P. Barros Neto. 2009. “Incentives and Innovation to Sustain Lean Construction Implementation.” In Proceedings of the 17th Annual Conference of the International Group for Lean Construction. Taipei: IGLC.
  • Herron, C., and P. M. Braiden. 2006. “A Methodology for Developing Sustainable Quantifiable Productivity Improvement in Manufacturing Companies.” International Journal of Production Economics 104 (1): 143–153.10.1016/j.ijpe.2005.10.004
  • Hodge, G. L., K. Goforth Ross, J. A. Joines, and K. Thoney. 2011. “Adapting Lean Manufacturing Principles to the Textile Industry.” Production Planning and Control 22 (3): 237–247.10.1080/09537287.2010.498577
  • Howell, G. 1999. “What is Lean Construction-1999.” In Proceedings of the 7th Annual Conference of the International Group for Lean Construction. Berkeley, CA: IGLC.
  • Howell, G., and G. Ballard. 1998. “Implementing Lean Construction: Understanding and Action.” In Proceedings of the 6th Annual Conference of the International Group for Lean Construction. Guaruja: IGLC.
  • Hu, Q., S. J. Williams, R. Mason, and P. Found. 2016. “The Change of Production Systems through Consultancy Involved Projects: A Multiple Case Study in Chinese SMEs.” Production Planning & Control 27 (7–8): 550–562.
  • Johansen, E., and L. Walter. 2007. “Lean Construction: Prospects for the German Construction Industry.” Lean Construction Journal 3 (1): 19–32.
  • Jorgensen, B., and S. Emmitt. 2008. “Lost in Transition: The Transfer of Lean Manufacturing to Construction.” Engineering, Construction and Architectural Management 15 (4): 383–398.10.1108/09699980810886874
  • Jorgensen, B., and S. Emmitt. 2009. “Investigating the Integration of Design and Construction from a ‘Lean’ Perspective.” Construction Innovation 9 (2): 225–240.10.1108/14714170910950849
  • Jorgensen, B., S. Emmitt, and S. Bonke. 2004. “Revealing Cultures and Sub-cultures during the Implementation of Lean Construction.” In Proceedings of the 12th Annual Conference of the International Group for Lean Construction. Helsingør: IGLC.
  • Kemmer, S. L., M. A. Saraiva, L. F. Heineck, A. V. L. Pacheco, M. D. V. Novaes, C. A. M. A. Mourão, and L. C. R. Moreira. 2006. “The Use of Andon in High Rise Building.” In Proceedings of the 14th Annual Conference of the International Group for Lean Construction. Santiago: IGLC.
  • Kent, D. C., and B. Becerik-Gerber. 2010. “Understanding Construction Industry Experience and Attitudes Toward Integrated Project Delivery.” Journal of Construction Engineering and Management 136 (8): 815–825.10.1061/(ASCE)CO.1943-7862.0000188
  • Kim, Y. W., and G. Ballard. 2010. “Management Thinking in the Earned Value Method System and the Last Planner System.” Journal of Management in Engineering 26 (4): 223–228.10.1061/(ASCE)ME.1943-5479.0000026
  • Kitazawa, S., and J. Sarkis. 2000. “The Relationship between ISO 14001 and Continuous Source Reduction Programs.” International Journal of Operations and Production Management 20 (2): 225–248.10.1108/01443570010304279
  • Ko, C. H., and J. D. Kuo. 2015. “Making Formwork Construction Lean.” Journal of Civil Engineering and Management 21 (4): 444–458.10.3846/13923730.2014.890655
  • Koskela, L. 1992. Application of the New Production Philosophy to Construction: Technical Report. Vol. 72. Stanford, CA: Stanford University.
  • Koskela, L. 1996. “Towards the Theory of (Lean) Construction.” In Proceedings of the 4th Annual Conference of the International Group for Lean Construction. Birmingham, AL: IGLC.
  • Lahdenperä, P. 2012. “Making Sense of the Multi-Party Contractual Arrangements of Project Partnering, Project Alliancing and Integrated Project Delivery.” Construction Management and Economics 30 (1): 57–79.10.1080/01446193.2011.648947
  • Latham, M. Sir. 1994. Constructing the Team: Final Report of the Government/Industry Review of Procurement and Contractual Arrangements in the UK Construction Industry. London: HMSO.
  • LCI (Lean Construction Institute). 2017. “Lean Articles.” LCI. Accessed August 15, 2017. https://www.leanconstruction.org/learning/lean-articles/.
  • LEI (Lean Enterprise Institute). 2007. “New Survey: Middle Managers are Biggest Obstacle to Lean Enterprise.” LEI. Accessed August 15, 2017. https://www.lean.org/WhoWeAre/NewsArticleDocuments/lean_survey_07.pdf.
  • Leong, M. S., and P. Tilley. 2008. “A Lean Strategy to Performance Measurement – Reducing Waste by Measuring ‘Next’ Customer Needs.” In Proceedings of the 16th Annual Conference of the International Group for Lean Construction. Manchester, NH: IGLC.
  • Lyons, A. C., K. Vidamour, R. Jain, and M. Sutherland. 2013. “Developing an Understanding of Lean Thinking in Process Industries.” Production Planning and Control 24 (6): 475–494.10.1080/09537287.2011.633576
  • Manfredsson, P. 2016. “Textile Management Enabled by Lean Thinking: A Case Study of Textile SMEs.” Production Planning & Control 27 (7–8): 541–549.
  • Mariz, R. N., F. A. Picchi, A. D. Granja, and R. S. S. Melo. 2013. “Production Cells in Construction: Considering Time, Space and Information Linkages to Seek Broader Implementations.” Journal of Engineering, Project, and Production Management 3 (1): 46–55.
  • Martínez-Jurado, P. J., and J. Moyano-Fuentes. 2014. “Key Determinants of Lean Production Adoption: Evidence from the Aerospace Sector.” Production Planning and Control 25 (4): 332–345.10.1080/09537287.2012.692170
  • Matthews, O., and G. Howell. 2005. “Integrated Project Delivery: An Example of Relational Contracting.” Lean Construction Journal 2 (1): 46–61.
  • McCarthy, I., M. Leseure, K. Ridgway, and N. Fieller. 1997. “Building a Manufacturing Cladogram.” International Journal of Technology Management 13 (3): 269–286.10.1504/IJTM.1997.001664
  • McGraw-Hill Construction. 2013. Lean Construction: Leveraging Collaboration and Advanced Practices to Increase Project Efficiency. Bedford: McGraw-Hill.
  • McGuinness, S., and J. Bennett. 2006. “Examining the Link Between Skill Shortages, Training Composition and Productivity Levels in the Construction Industry: Evidence from Northern Ireland.” International Journal of Human Resource Management 17 (2): 265–279.
  • Mendes, J. R., and L. F. M. Heineck. 1998. “Preplanning Method for Multi-story Building Construction Using Line-of-balance.” In Proceedings of the 6th Annual Conference of the International Group for Lean Construction. Guaruja: IGLC.
  • Mileham, A. R., S. J. Culley, G. W. Owen, and R. I. McIntosh. 1999. “Rapid Changeover – A Pre‐Requisite for Responsive Manufacture.” International Journal of Operations and Production Management 19 (8): 785–796.10.1108/01443579910274383
  • Miles, M. B., and A. M. Huberman. 1994. Qualitative Data Analysis. Thousand Oaks, CA: Sage.
  • Millstein, M. A., and J. S. Martinich. 2014. “Takt Time Grouping: Implementing Kanban-flow Manufacturing in an Unbalanced, High Variation Cycle-time Process with Moving Constraints.” International Journal of Production Research 52 (23): 6863–6877.10.1080/00207543.2014.910621
  • Miron, L., S. Talebi, L. Koskela, and A. Tezel. 2016. “Evaluation of Continuous Improvement Programmes.” In Proceedings of the 24th Annual Conference of the International Group for Lean Construction. Boston, MA: IGLC.
  • Monden, Y. 1983. The Toyota Production System. Portland, ME: Productivity Press.
  • Moser, L., and A. Dos Santos. 2003. “Exploring the Role of Visual Controls on Mobile Cell Manufacturing: A Case Study on Drywall Technology.” In Proceedings of the 11th Annual Conference of the International Group for Lean Construction. Blacksburg: IGLC.
  • Mossman, A. 2009. “Why Isn’t the UK Construction Industry Going Lean with Gusto?” Lean Construction Journal 5 (1): 24–36.
  • Mukhopadhyay, S. K., and S. Shanker. 2005. “Kanban Implementation at a Tyre Manufacturing Plant: A Case Study.” Production Planning and Control 16 (5): 488–499.10.1080/09537280500121778
  • Murata, K., and H. Katayama. 2010. “Development of Kaizen Case-base for Effective Technology Transfer–A Case of Visual Management Technology.” International Journal of Production Research 48 (16): 4901–4917.10.1080/00207540802687471
  • Nahmens, I., and L. H. Ikuma. 2009. “An Empirical Examination of the Relationship between Lean Construction and Safety in the Industrialized Housing Industry.” Lean Construction Journal 1: 1–12.
  • Nahmens, I., and L. H. Ikuma. 2011. “Lean Homebuilding: Lessons Learned from a Precast Concrete Panelizer.” Journal of Architectural Engineering 17 (4): 155–161.10.1061/(ASCE)AE.1943-5568.0000037
  • Negrão, L. L. L., M. Godinho Filho, and G. Marodin. 2017. “Lean Practices and Their Effect on Performance: A Literature Review.” Production Planning & Control 28 (1): 33–56.
  • Nesensohn, C., D. Bryde, E. Ochieng, and D. Fearon. 2015. “Maturity and Maturity Models in Lean Construction.” Australasian Journal of Construction Economics and Building 14 (1): 45–59.
  • Ngai, E. W. T., T. C. E. Cheng, and S. S. M. Ho. 2004. “Critical Success Factors of Web-based Supply-chain Management Systems: An Exploratory Study.” Production Planning and Control 15 (6): 622–630.10.1080/09537280412331283928
  • Oehmen, J., B. W. Oppenheim, D. Secor, E. Norman, E. Rebentisch, J. A. Sopko, M. Steuber, et al. 2012. The Guide to Lean Enablers for Managing Engineering Programs. Cambridge, MA: Joint MIT‐PMI‐INCOSE Community of Practice on Lean in Program Management.
  • Ogunbiyi, O., J. S. Goulding, and A. Oladapo. 2014. “An Empirical Study of the Impact of Lean Construction Techniques on Sustainable Construction in the UK.” Construction Innovation 14 (1): 88–107.10.1108/CI-08-2012-0045
  • Ohno, T. 1988. The Toyota Production System: Beyond Large-scale Production. Portland, ME: Productivity Press.
  • Oppenheim, B. W. 2011. Lean for Systems Engineering with Lean Enablers for Systems Engineering. Hoboken, NJ: Wiley.10.1002/9781118063996
  • Paez, O., S. Salem, J. Solomon, and A. Genaidy. 2005. “Moving from Lean Manufacturing to Lean Construction: Toward a Common Sociotechnological Framework.” Human Factors and Ergonomics in Manufacturing 15 (2): 233–245.10.1002/(ISSN)1520-6564
  • Panizzolo, R., P. Garengo, M. K. Sharma, and A. Gore. 2012. “Lean Manufacturing in Developing Countries: Evidence from Indian SMEs.” Production Planning and Control 23 (10–11): 769–788.10.1080/09537287.2011.642155
  • Parry, G. C., and C. E. Turner. 2006. “Application of Lean Visual Process Management Tools.” Production Planning and Control 17 (1): 77–86.10.1080/09537280500414991
  • Pasquire, C., S. Sarhan, and A. King. 2015a. “A Critical Review of the Safeguarding Problem in Construction Procurement: Unpicking the Coherent Current Model.” In Proceedings of the 23rd Annual Conference of the International Group for Lean Construction. Perth: IGLC.
  • Pasquire, C., S. Sarhan, and A. King. 2015b. “Exploring the Implementation of the Last Planner System through IGLC Community: Twenty One Years of Experience.” In Proceedings of the 23rd Annual Conference of the International Group for Lean Construction. Perth: IGLC.
  • Pettersen, J. 2009. “Defining Lean Production: Some Conceptual and Practical Issues.” The TQM Journal 21 (2): 127–142.10.1108/17542730910938137
  • Pheng, L. S., and C. J. Chuan. 2001. “Just-in-time Management of Precast Concrete Components.” Journal of Construction Engineering and Management 127 (6): 494–501.10.1061/(ASCE)0733-9364(2001)127:6(494)
  • Rapley, T. J. 2001. “The Art(Fulness) of Open-ended Interviewing: Some Considerations on Analysing Interviews.” Qualitative Research 1 (3): 303–323.10.1177/146879410100100303
  • Rose, A. N. M., B. M. Deros, and M. N. Ab-Rahman. 2013. “Lean Manufacturing Perceptions and Actual Practice among Malaysian SME’s in Automotive Industry.” International Journal of Automotive and Mechanical Engineering 7: 820–829.10.15282/ijame
  • Rosenbaum, S., M. Toledo, and V. González. 2013. “Improving Environmental and Production Performance in Construction Projects Using Value-stream Mapping: Case Study.” Journal of Construction Engineering and Management 140 (2): 04013045.
  • Sacks, R., L. Koskela, B. A. Dave, and R. Owen. 2010. “Interaction of Lean and Building Information Modeling in Construction.” Journal of Construction Engineering and Management 136 (9): 968–980.10.1061/(ASCE)CO.1943-7862.0000203
  • Salem, O., J. Solomon, A. Genaidy, and I. Minkarah. 2006. “Lean Construction: From Theory to Implementation.” Journal of Management in Engineering 22 (4): 168–175.10.1061/(ASCE)0742-597X(2006)22:4(168)
  • Sarhan, S., and A. Fox. 2013. “Barriers to Implementing Lean Construction in the UK Construction Industry.” The Built and Human Environment Review 6 (1): 1–17.
  • Saurin, T. A., G. A. Marodin, and J. L. D. Ribeiro. 2011. “A Framework for Assessing the Use of Lean Production Practices in Manufacturing Cells.” International Journal of Production Research 49 (11): 3211–3230.10.1080/00207543.2010.482567
  • Saurin, T. A., J. L. D. Ribeiro, and G. Vidor. 2012. “A Framework for Assessing Poka-Yoke Devices.” Journal of Manufacturing Systems 31 (3): 358–366.10.1016/j.jmsy.2012.04.001
  • Schuring, R. W. 1996. “Operational Autonomy Explains the Value of Group Work in Both Lean and Reflective Production.” International Journal of Operations and Production Management 16 (2): 171–182.10.1108/01443579610197120
  • Segerstedt, A., and T. Olofsson. 2010. “Supply Chains in the Construction Industry.” Supply Chain Management: An International Journal 15 (5): 347–353.10.1108/13598541011068260
  • Seppänen, O., G. Ballard, and S. Pesonen. 2010. “The Combination of Last Planner System and Location-based Management System.” Lean Construction Journal 6 (1): 43–54.
  • Serrano Lasa, I., R. D. Castro, and C. O. Laburu. 2009. “Extent of the Use of Lean Concepts Proposed for a Value Stream Mapping Application.” Production Planning and Control 20 (1): 82–98.10.1080/09537280802685322
  • Seth, D., and V. Gupta. 2005. “Application of Value Stream Mapping for Lean Operations and Cycle Time Reduction: An Indian Case Study.” Production Planning and Control 16 (1): 44–59.10.1080/09537280512331325281
  • Seth, D., N. Seth, and P. Dhariwal. 2017. “Application of Value Stream Mapping (VSM) for Lean and Cycle Time Reduction in Complex Production Environments: A Case Study.” Production Planning & Control 28 (5): 398–419.10.1080/09537287.2017.1300352
  • Shah, R., and P. T. Ward. 2003. “Lean Manufacturing: Context, Practice Bundles, and Performance.” Journal of Operations Management 21 (2): 129–149.10.1016/S0272-6963(02)00108-0
  • Shao, J., and R. Müller. 2011. “The Development of Constructs of Program Context and Program Success: A Qualitative Study.” International Journal of Project Management 29 (8): 947–959.
  • Shaw, D., and J. S. Edwards. 2006. “Manufacturing Knowledge Management Strategy.” International Journal of Production Research 44 (10): 1907–1925.10.1080/00207540500431339
  • Shingo, S. 1986. Zero Quality Control: Source Inspection and the Poka-Yoke System. Portland, ME: CRC Press.
  • Shingo, S., and A. P. Dillon. 1989. A Study of the Toyota Production System: From an Industrial Engineering Viewpoint. Portland, ME: CRC Press.
  • Shirazi, B., D. A. Langford, and S. M. Rowlinson. 1996. “Organizational Structures in the Construction Industry.” Construction Management and Economics 14 (3): 199–212.10.1080/014461996373467
  • Shishank, S., and R. Dekkers. 2013. “Outsourcing: Decision-making Methods and Criteria During Design and Engineering.” Production Planning and Control 24 (4–5): 318–336.10.1080/09537287.2011.648544
  • Slomp, J., J. A. Bokhorst, and R. Germs. 2009. “A Lean Production Control System for High-variety/Low-volume Environments: A Case Study Implementation.” Production Planning and Control 20 (7): 586–595.10.1080/09537280903086164
  • Soini, M., I. Leskelä, and O. Seppänen. 2004. “Implementation of Line-of-balance Based Scheduling and Project Control System in a Large Construction Company.” In Proceedings of the 12th Annual Conference of the International Group for Lean Construction. Helsingør: IGLC.
  • Sokovic, M., D. Pavletic, and K. K. Pipan. 2010. “Quality Improvement Methodologies: PDCA Cycle, RADAR Matrix, DMAIC and DFSS.” Journal of Achievements in Materials and Manufacturing Engineering 43 (1): 476–483.
  • Souza, D. V. S. D. 2015. “A Conceptual Framework and Best Practices for Designing and Improving Construction Supply Chains.” PhD diss., University of Salford.
  • Stanworth, J. O. 2012. “Deep Supply Relationships: Influencing Outcomes by Managing Supply Service Quality.” Production Planning and Control 23 (7): 541–552.10.1080/09537287.2011.640054
  • Stehn, L., and M. Höök. 2008. “Lean Principles in Industrialized Housing Production: The Need for a Cultural Change.” Lean Construction Journal: 20–33.
  • Storch, R. L., and S. Lim. 1999. “Improving Flow to Achieve Lean Manufacturing in Shipbuilding.” Production Planning and Control 10 (2): 127–137.10.1080/095372899233280
  • Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just-in-time and Respect-for-human System.” International Journal of Production Research 15 (6): 553–564.10.1080/00207547708943149
  • Tatum, C. B. 1987. “Process of Innovation in Construction Firm.” Journal of Construction Engineering and Management 113 (4): 648–663.10.1061/(ASCE)0733-9364(1987)113:4(648)
  • Tezel, A., and Z. Aziz. 2017. “Visual Management in Highways Construction and Maintenance in England.” Engineering, Construction and Architectural Management 24 (3): 486–513.10.1108/ECAM-02-2016-0052
  • Tezel, A., L. Koskela, and Z. Aziz. 2017. “Lean Construction in Small-medium Sized Enterprises (SMEs): An Exploration of the Highways Supply Chain.” In Proceedings of the 25th Annual Conference of the International Group for Lean Construction. Heraklion: IGLC.
  • Tezel, A., L. Koskela, P. Tzortzopoulos, C. T. Formoso, and T. Alves. 2015. “Visual Management in Brazilian Construction Companies: Taxonomy and Guidelines for Implementation.” Journal of Management in Engineering 31 (6): 05015001.10.1061/(ASCE)ME.1943-5479.0000354
  • Thomas, H. R., M. J. Horman, U. Espinelli Lemes de Souza, and I. Zavřski. 2002. “Reducing Variability to Improve Performance as a Lean Construction Principle.” Journal of Construction Engineering and Management 128 (2): 144–154.
  • Thürer, M., I. Tomašević, and M. Stevenson. 2017. “On the Meaning of ‘Waste’: Review and Definition.” Production Planning and Control 28 (3): 244–255.10.1080/09537287.2016.1264640
  • Tjell, J., and P. M. Bosch-Sijtsema. 2015. “Visual Management in Mid-sized Construction Design Projects.” Procedia Economics and Finance 21: 193–200.10.1016/S2212-5671(15)00167-7
  • Tommelein, I. D. 1998. “Pull-driven Scheduling for Pipe-spool Installation: Simulation of Lean Construction Technique.” Journal of Construction Engineering and Management 124 (4): 279–288.10.1061/(ASCE)0733-9364(1998)124:4(279)
  • Tommelein, I. D. 2008. “Poka Yuka or Quality by Mistake Proofing Design and Construction System.” In Proceedings of the 16th Annual Conference of the International Group for Lean Construction. Manchester, NH: IGLC.
  • Tsao, C. C., I. D. Tommelein, E. S. Swanlund, and G. Howell. 2004. “Work Structuring to Achieve Integrated Product-process Design.” Journal of Construction Engineering and Management 130 (6): 780–789.10.1061/(ASCE)0733-9364(2004)130:6(780)
  • Viana, D. D., C. T. Formoso, and E. L. Isatto. 2017. “Understanding the Theory behind the Last Planner System Using the Language-action Perspective: Two Case Studies.” Production Planning and Control 28 (3): 177–189.10.1080/09537287.2016.1233360
  • Vlachos, I. 2015. “Applying Lean Thinking in the Food Supply Chains: A Case Study.” Production Planning and Control 26 (16): 1351–1367.10.1080/09537287.2015.1049238
  • Vrijhoef, R., and L. Koskela. 2000. “The Four Roles of Supply Chain Management in Construction.” European Journal of Purchasing and Supply Management 6 (3–4): 169–178.10.1016/S0969-7012(00)00013-7
  • Wandahl, S. 2014. “Lean Construction with or without Lean: Challenges of Implementing Lean Construction.” In Proceedings of the 22nd Annual Conference of the International Group for Lean Construction. Oslo: IGLC.
  • Ward, S. A. 2015. “Critical Success Factors for Lean Construction Intervention.” PhD diss., University of Dundee.
  • Wilson, M. M., and R. N. Roy. 2009. “Enabling Lean Procurement: A Consolidation Model for Small‐ and Medium‐sized Enterprises.” Journal of Manufacturing Technology Management 20 (6): 817–833.10.1108/17410380910975096
  • Winch, G., M. C. Meunier, J. Head, and K. Russ. 2012. “Projects as the Content and Process of Change: The Case of the Health and Safety Laboratory.” International Journal of Project Management 30 (2): 141–152.10.1016/j.ijproman.2011.06.005
  • Wolbers, M., R. J. E. Evans, M. Holmes, C. Pasquire, and A. D. F. Price. 2005. “Construction Management and Lean Thinking in Highways Maintenance.” In Proceedings of the 21st Association of Researchers in Construction Management Conference. London: ARCOM.
  • Womack, J., D. Jones, and D. Roos. 1990. The Machine that Changed the World. New York, NY: Macmillan.
  • Yang, H. E., and C. C. Wu. 2009. “Effects of Image Interactivity Technology Adoption on E-Shoppers’ Behavioural Intentions with Risk as Moderator.” Production Planning and Control 20 (4): 370–382.10.1080/09537280902843755
  • Yu, H., M. Al-Hussein, S. Al-Jibouri, and A. Telyas. 2011. “Lean Transformation in a Modular Building Company: A Case for Implementation.” Journal of Management in Engineering 29 (1): 103–111.
  • Yu, H., T. Tweed, M. Al-Hussein, and R. Nasseri. 2009. “Development of Lean Model for House Construction Using Value Stream Mapping.” Journal of Construction Engineering and Management 135 (8): 782–790.10.1061/(ASCE)0733-9364(2009)135:8(782)
  • Yusuf, Y. Y., and E. O. Adeleye. 2002. “A Comparative Study of Lean and Agile Manufacturing with a Related Survey of Current Practices in the UK.” International Journal of Production Research 40 (17): 4545–4562.10.1080/00207540210157141
  • Zanotti, N. L., F. L. Maranhão, and V. L. C. Aly. 2017. “Bottom-up Strategy for Lean Construction on Site Implementation.” In Proceedings of the 25th Annual Conference of the International Group for Lean Construction. Heraklion: IGLC.
  • Zegarra, O., and L. F. Alarcon. 2017. “Variability Propagation in the Production Planning and Control Mechanism of Construction Projects.” Production Planning & Control 28 (9): 707–726.10.1080/09537287.2017.1304588
  • Zhou, B. 2016. “Lean Principles, Practices, and Impacts: A Study on Small and Medium-sized Enterprises (SMEs).” Annals of Operations Research 241 (1–2): 457–474.10.1007/s10479-012-1177-3

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.