Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach

&
Pages 743-760 | Received 18 Oct 2017, Accepted 17 Apr 2018, Published online: 04 May 2018

References

  • Acebes, Fernando, Javier Pajares, José Manuel Galán, and Adolfo López-Paredes. 2014. “A New Approach for Project Control under Uncertainty. Going back to the Basics.” International Journal of Project Management 32 (3): 423–434.10.1016/j.ijproman.2013.08.003
  • ANSI. 1999. “ANSI/EIA 748 Guidelines on Earned Value Management.” In edited by ANSI (American National Standards Institute).
  • Armstrong, J. Scott. 2002. “Principles of Forecasting: A Handbook of Researchers and Practitioners.” In 849. Boston, MA: Kluwer Academic.
  • Barraza, Gabriel A., and Rafael A. Bueno. 2007. “Probabilistic Control of Project Performance Using Control Limit Curves.” Journal of Construction Engineering and Management 133 (12): 957–965.10.1061/(ASCE)0733-9364(2007)133:12(957)
  • Barraza, Gabriel A., W. Edward Back, and Fernando Mata. 2000. “Probabilistic Monitoring of Project Performance Using SS-Curves.” Journal of Construction Engineering and Management 126 (2): 142–148.10.1061/(ASCE)0733-9364(2000)126:2(142)
  • Barraza, Gabriel A., W. Edward Back, and Fernando Mata. 2004. “Probabilistic Forecasting of Project Performance Using Stochastic S Curves.” Journal of Construction Engineering and Management 130 (1): 25–32.10.1061/(ASCE)0733-9364(2004)130:1(25)
  • Bates, J. M., and C. W. J. Granger. 1969. “The Combination of Forecasts.” OR 20 (4): 451–468.
  • Batselier, Jordy, and Mario Vanhoucke. 2015. “Construction and Evaluation Framework for a Real-Life Project Database.” International Journal of Project Management 33 (3): 697–710.10.1016/j.ijproman.2014.09.004
  • Batselier, Jordy, and Mario Vanhoucke. 2017. “Improving Project Forecast Accuracy by Integrating Earned Value Management with Exponential Smoothing and Reference Class Forecasting.” International Journal of Project Management 35 (1): 28–43.10.1016/j.ijproman.2016.10.003
  • Bunn, D. W. 1975. “A Bayesian Approach to the Linear Combination of Forecasts.” Operational Research Quarterly 26 (2, Part 1): 325–329.
  • Bunn, Derek W. 1985. “Statistical Efficiency in the Linear Combination of Forecasts.” International Journal of Forecasting 1 (2): 151–163.10.1016/0169-2070(85)90020-2
  • Caron, Franco, Fabrizio Ruggeri, and Alessandro Merli. 2013. “A Bayesian Approach to Improve Estimate at Completion in Earned Value Management.” Project Management Journal 44 (1): 3–16.10.1002/pmj.21303
  • Caron, Franco, Fabrizio Ruggeri, and Beatrice Pierini. 2016. “A Bayesian Approach to Improving Estimate to Complete.” International Journal of Project Management 34 (8): 1687–1702. doi:10.1016/j.ijproman.2016.09.007.
  • Chambers, John C., Satinder K. Mullick, and Donald D. Smith. 1971. “How to Choose the Right Forecasting Technique.” Harvard Business Review 49 (4): 45–70.
  • Christensen, David S., and Scott R. Heise. 1993. “Cost Performance Index Stability.” National Contract Management Journal 25 (1): 7–15.
  • Christensen, David S., and Carl Templin. 2002. “EAC Evaluation Methods: Do They Still Work?” Acquisition Review Quarterly 105–116.
  • Clemen, Robert T. 1989. “Combining Forecasts: A Review and Annotated Bibliography.” International Journal of Forecasting 5 (4): 559–583.10.1016/0169-2070(89)90012-5
  • Department of Defense (DoD), U.S. 2017. “Earned Value Management.” Accessed October 13, 2017. www.acq.osd.mil/evm
  • Department of Energy (DoE), U.S. 2017. “Earned Value Management.” Accessed October 13, 2017. . https://www.energy.gov/projectmanagement/services-0/earned-value-management
  • DoE, U.S. 1997. “DOE Cost Estimating Guide.” In edited by U.S. Department of Energy (DoE).
  • Fleming, Quentin W., and Joel M. Koppelman. 2010. Earned Value Project Management. 4th ed. Newtown Square, PA: Project Management Institute.
  • Fouché, Deon Paul, and Asbjørn Rolstadås. 2010. “The Use of Performance Measurement as a Basis for Project Control of Offshore Modification Oil and Gas Projects.” Production Planning and Control 21 (8): 760–773.10.1080/09537281003661385
  • GAO. 2009. “GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Capital Program Costs.” In Applied Research and Methods, 440. Washington, DC: U.S. Government Accountability Office (GAO).
  • GAO. 2012. “GAO Schedule Assessment Guide: Best Practices for Project Schedules.” In Applied Research and Methods, 220. Washington, DC: U.S. Government Accountability Office (GAO).
  • Gardoni, Paolo, Kenneth F. Reinschmidt, and Ramesh Kumar. 2007. “A Probabilistic Framework for Bayesian Adaptive Forecasting of Project Progress.” Computer-Aided Civil and Infrastructure Engineering 22 (3): 182–196. doi:10.1111/j.1467-8667.2007.00478.x.
  • Garvey, Paul R, Stephen A. Book, and Raymond P. Covert. 2016. Probability Methods for Cost Uncertainty Analysis: A Systems Engineering Perspective. Boca Raton: CRC Press.
  • González, Vicente, Luis F. Alarcón, and Fernando Mundaca. 2008. “Investigating the Relationship between Planning Reliability and Project Performance.” Production Planning and Control 19 (5): 461–474.10.1080/09537280802059023
  • Hazır, Öncü. 2015. “A Review of Analytical Models, Approaches and Decision Support Tools in Project Monitoring and Control.” International Journal of Project Management 33 (4): 808–815. doi:10.1016/j.ijproman.2014.09.005.
  • Hulett, David. 2012. Integrated Cost-Schedule Risk Analysis. Gower Publishing, Ltd.
  • Hwang, Seokyon, and Liang Y. Liu. 2005. “Proactive Project Control Using Productivity Data and Time Series Analysis.” In Computing in Civil Engineering 2005: 1–11.
  • Jeong, Dae Il, and Young-Oh Kim. 2009. “Combining Single-Value Streamflow Forecasts – a Review and Guidelines for Selecting Techniques.” Journal of Hydrology 377 (3–4): 284–299.10.1016/j.jhydrol.2009.08.028
  • Kang, Heejoon. 1986. “Unstable Weights in the Combination of Forecasts.” Management Science 32 (6): 683–695.10.1287/mnsc.32.6.683
  • Kim, Byung Cheol. 2007. “Forecasting Project Progress and Early Warning of Project Overruns with Probabilistic Methods.” Dissertation, Texas A&M University.
  • Kim, Byung-Cheol and Kenneth F. Reinschmidt. 2010. “Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method.” ASCE Journal of Construction Engineering and Management 136 (8): 834–843.10.1061/(ASCE)CO.1943-7862.0000192
  • Kim, Byung-Cheol. 2015. “Integrating Risk Assessment and Actual Performance for Probabilistic Project Cost Forecasting: A Second Moment Bayesian Model.” IEEE Transactions on Engineering Management 62 (2): 158–170. doi:10.1109/TEM.2015.2404935.
  • Kim, Byung-Cheol. 2016. “Probabilistic Evaluation of Cost Performance Stability in Earned Value Management.” ASCE Journal of Management in Engineering 32 (1): 04015025.10.1061/(ASCE)ME.1943-5479.0000383
  • Kim, Byung-Cheol, and Kenneth F. Reinschmidt. 2009. “Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution.” ASCE Journal of Construction Engineering and Management 135 (3): 178–186.10.1061/(ASCE)0733-9364(2009)135:3(178)
  • Krishnamurti, T. N., C. M. Kishtawal, Timothy E. LaRow, David R. Bachiochi, C. Zhan Zhang, Eric Williford, Sulochana Gadgil, and Sajani Surendran. 1999. “Improved Weather and Seasonal Climate Forecasts from Multimodel Superensemble.” Science 285 (5433): 1548–1550.10.1126/science.285.5433.1548
  • Lee, Sang Hyun, Feniosky Pena-Mora, and Moonseo Park. 2006. “Dynamic Planning and Control Methodology for Strategic and Operational Construction Project Management.” Automation in Construction 15 (1): 84–97.10.1016/j.autcon.2005.02.008
  • Makridakis, Spyros, and Robert L. Winkler. 1983. “Averages of Forecasts: Some Empirical Results.” Management Science 29 (9): 987–996.10.1287/mnsc.29.9.987
  • McLeod, A., D. Noakes, K. Hipel, and R. Thompstone. 1987. “Combining Hydrologic Forecasts.” Journal of Water Resources Planning and Management 113 (1): 29–41.10.1061/(ASCE)0733-9496(1987)113:1(29)
  • de Menezes, Lilian M., and Derek W. Bunn. 1993. “Diagnostic Tracking and Model Specification in Combined Forecasts of U.K. Inflation.” Journal of Forecasting 12 (7): 559–572.10.1002/(ISSN)1099-131X
  • de Menezes, Lilian M., Derek W. Bunn, and James W. Taylor. 2000. “Review of Guidelines for the Use of Combined Forecasts.” European Journal of Operational Research 120 (1): 190–204.10.1016/S0377-2217(98)00380-4
  • NASA. 2008. NASA Cost Estimating Handbook.
  • Pajares, J., and A. Lopez-Paredes. 2011. “An Extension of the EVM Analysis for Project Monitoring: The Cost Control Index and the Schedule Control Index.” International Journal of Project Management 29 (5): 615–621.10.1016/j.ijproman.2010.04.005
  • PMI. 2011. Practice Standard for Earned Value Management. 2nd ed. Newtown Square, PA: Project Management Institute Inc..
  • PMI. 2013. A Guide to the Project Management Body of Knowledge. 5th ed. Newtown Square, PA: Project Management Institute Inc..
  • Schmittlein, David C., Jinho Kim, and Donald G. Morrison. 1990. “Combining Forecasts: Operational Adjustments to Theoretically Optimal Rules.” Management Science 36 (9): 1044–1056.10.1287/mnsc.36.9.1044
  • Slemaker, Chuck M. 1985. The Principles and Practice of Cost/Schedule Control Systems. Petrocelli Books.
  • Vandevoorde, Stephan, and Mario Vanhoucke. 2006. “A Comparison of Different Project Duration Forecasting Methods Using Earned Value Metrics.” International Journal of Project Management 24 (4): 289–302.10.1016/j.ijproman.2005.10.004
  • Vanhoucke, Mario, José Coelho, and Jordy Batselier. 2016. “An Overview of Project Data for Integrated Project Management and Control.” Journal of Modern Project Management 3 (2): 6–21.
  • Willems, Laura L., and Mario Vanhoucke. 2015. “Classification of Articles and Journals on Project Control and Earned Value Management.” International Journal of Project Management 33 (7): 1610–1634.10.1016/j.ijproman.2015.06.003
  • Winkler, Robert L., and Spyros Makridakis. 1983. “The Combination of Forecasts.” Journal of the Royal Statistical Society. Series a (General) 146 (2): 150–157.
  • Zegarra, Omar, and Luis F. Alarcón. 2017. “Variability Propagation in the Production Planning and Control Mechanism of Construction Projects.” Production Planning & Control 28 (9): 707–726.10.1080/09537287.2017.1304588
  • Zwikael, Ofer, Shlomo Globerson, and Tzvi Raz. 2000. “Evaluation of Models for Forecasting the Final Cost of a Project.” Project Management Journal 31 (1): 53–57.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.