Publication Cover
Production Planning & Control
The Management of Operations
Volume 30, 2019 - Issue 4
767
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Understanding the planner’s role in lookahead construction planning

, ORCID Icon, , &
Pages 271-284 | Received 16 Jan 2018, Accepted 05 Sep 2018, Published online: 06 Feb 2019

References

  • Abourizk, S. 2010. “Role of Simulation in Construction Engineering and Management.” Journal of Construction Engineering and Management ASCE 136 (10): 1140–1153. doi:10.1061/(ASCE)CO.1943-7862.0000220
  • Alves, T. D. C., J. D. P. B. Neto, L. F. Heineck, S. L. Kemmer, and P. E. Pereira. 2009. “Incentives and Innovation to Sustain Lean Construction Implementation.” In 17th Annual Conference of the International Group for Lean Construction, edited by Y. Cuperus and E. H. Hirota. 583–592. Taipei, Taiwan: International Group for Lean Construction, IGLC.
  • Arbulu, R., and G. Ballard. 2004. “Lean Supply Systems in Construction.” In 12th Annual Conference of the International Group for Lean Construction, edited by S. Bertelsen and C.T. Formoso. Helsingør, Denmark: International Group for Lean Construction, IGLC.
  • Arbulu, R., G. Ballard, and N. Harper. 2003. “Kanban in Construction.” In 11th Annual Conference of the International Group for Lean Construction, edited by. Virginia, USA: International Group for Lean Construction, IGLC.
  • Axelrod, R. 2006. “Advancing the Art of Simulation in the Social Sciences.” In Handbook of research on nature inspired computing for economy and management, edited by J. P. Rennard, 90–100. Hershey: Idea Group Publishing.
  • Aziz, R. F., and S. M. Hafez. 2013. “Applying Lean Thinking in Construction and Performance Improvement.” Alexandria Engineering Journal 52 (4): 679–695. doi:10.1016/j.aej.2013.04.008
  • Ballard, G. 2000. “The Last PlannerTM System of Production Control.” Birmingham: Ph.D. dissertation. The University of Birmingham.
  • Ballard, G., and G. Howell. 1998. “Shielding Production: Essential Step in Production Control.” Journal of Construction Engineering and Management 124 (1): 11–17. doi:10.1061/(ASCE)0733-9364(1998)124:1(11)
  • Ballard, G., Y. Kim, J. Jang, and M. Liu. 2007. Roadmap to Lean Implementation at Project Level. Austin, Texas: Construction Industry Institute (CIU).
  • Ben-Haim, Y., and A. Laufer. 1998. “Robust Reliability of Projects with Activity-Duration Uncertainty.” Journal of Construction Engineering and Management 124 (2):125–132. doi:10.1061/(ASCE)0733-9364(1998)124:2(125)
  • Bennett, N. D., B. F. W. Croke, G. Guariso, J. H. A. Guillaume, S. H. Hamilton, A. J. Jakeman, and S. Marsili-Libelli. 2013. “Characterising Performance of Environmental Models.” Environmental Modelling and Software 40: 1–20. doi:10.1016/j.envsoft.2012.09.011
  • Borshchev, A. 2013. “Multi-Method Modeling.” In Proceedings of the 2013 Winter Simulation Conference, edited by S.-H. Kim, A. Tolk, R. Hill, and M. E. Kuhl, R. Pasupathy, 4089–4100.
  • Bustamante, J. A. 2007. “Implementing of a Rational Commitment Model for Improving Planning Reliability in Construction Projects.” Santiago: M.Eng. thesis, Faculty of Engineering, Pontificia Universidad Católica de Chile.
  • De Kok, T. G., and J. C. Fransoo. 2003. “Planning Supply Chain Operations: Definition and Comparison of Planning Concepts.” In Supply chain management: design, coordination and operation. Handbooks in operations research and management science, edited by A. G. de Kok and S. C. Graves, 597–675. North-Holland: Amsterdam,
  • Dooley, K. 2002. “Simulation Research Methods.” In Ompanion to organizations, edited by Joel Baum, 829–848. London: Blackwell.
  • Dvir, D.,. T. Raz, and A. J. Shenhar. 2003. “In Empirical Analysis of the Relationship Between Project Planning and Project Success.” International Journal of Proejct Management 21 (2): 89–95. doi:10.1016/S0263-7863(02)00012-1
  • Geary, S., S. M. Disney, and D. R. Towill. 2006. “On Bullwhip in Supply Chains—Historical Review, Present Practice and Expected Future Impact.” International Journal of Production Economics 101 (1): 2–18. doi:10.1016/j.ijpe.2005.05.009
  • Gelders, L. F., and L. N. Van Wassenhove. 1982. “Hierarchical Integration in Production Planning: theory and Practice.” Journal of Operations Management 3 (1): 27–35. doi:10.1016/0272-6963(82)90019-5
  • Gonzalez, V., L. F. Alarcon, and F. Mundaca. 2008. “Investigating the Relationship between Planning Reliability and Project Performance.” Production Planning and Control 19 (5): 461–474. doi:10.1080/09537280802059023
  • González, V., L. F. Alarcón, and K. Molenaar. 2009. “Multiobjective Design of Work-In-Process Buffer for Scheduling Repetitive Building Projects.” Automation in Construction 18 (2): 95–108. doi:10.1016/j.autcon.2008.05.005
  • González, V., L. F. Alarcón, S. Maturana, and F. Mundaca. 2008. “Work-in-Process Buffer Management Using the Rational Commitment Model in Repetitive Projects.” Proceedings of 16th Annual Conference of International Group for Lean Construction, 667-678. Manchester, UK, 16-18 July 2008.
  • González, V., L. F. Alarcón, S. Maturana, F. Mundaca, and J. Bustamante. 2010. “Improving Planning Reliability and Project Performance Using the Reliable Commitment Model.” Journal of Construction Engineering and Management @ Management 136 (10): 1129–1139. doi:10.1061/(ASCE)CO.1943-7862.0000215
  • Gupta, A., V. Gonzalez, and G. Miller. 2012. “Understanding the Relationship between Productivity and Buffers in Construction: A Simulation-Based Case.” In 20th Annual Conference of the International Group for Lean Construction, edited by I.D. Tommelein and C.L. Pasquire. San Diego, USA: IGLC.
  • Hamzeh, F. 2009. Improving Construction Workflow- The Role of Production Planning and Control. PhD Dissertation, Civil and Environmental Engineering Department, University of California, Berkeley, California.
  • Hamzeh, F., and B. Langerud. 2011. “Using Simulation to Study the Impact of Improving Lookahead Planning on the Reliability of Production Planning.” In proceedings of the 2011 Winter Simulation Conference, edited by S. Jain, R.R. Creasey, J. Himmelspach, K.P. White, and M. Fu, 3436–3447. Phoenix, AZ, USA: IEEE.
  • Hamzeh, F., E. Zankoul, and C. Rouhana. 2015. “How Can ‘Tasks Made Ready’ during Lookahead Planning Impact Reliable Workflow and Project Duration.” Construction Management and Economics 33 (4): 243–258. doi:10.1080/01446193.2015.1047878
  • Hamzeh, F. R., I. Saab, I. D. Tommelein, and G. Ballard. 2015. “Understanding the Role of “Tasks Anticipated” in Lookahead Planning through Simulation.” Automation in Construction 49: 18–26. doi:10.1016/j.autcon.2014.09.005
  • Ho, C. J. 1994. “Evaluating the Impact of Frequent Engineering Changes on MRP System Performance.” International Journal of Production Research 32 (3): 619–641. doi:10.1080/00207549408956956
  • Inman, R. R., and D. J. A. Gonsalvez. 1997. “Measuring and Analysing Supply Chain Schedule Stability: A Case Study in the Automotive Industry.” Production Planning and Control 8 (2): 194–204. doi:10.1080/095372897235460
  • Kim, S. C., Y. W. Kim, and C. J. Park. 2008. “Introduction of Workforce Database System for Effective Production Planning.” In Proceedings for the 16th Annual Conference of the International Group for Lean Construction, edited by P. Tzortzopoulos and M. Kagioglou. Manchester, UK: IGLC.
  • Laufer, A., A. Shapira, D. Cohenca-Zall, and G. A. Howell. 1993. “Prebid and Preconstruction Planning Process.” Journal of Construction Engineering and Management 119 (3): 426–444. doi:10.1061/(ASCE)0733-9364(1993)119:3(426)
  • Law, A. M. 2014. “A tutorial on Design of Experiments for Simulation Modeling.” In Proceedings of the 2014 Winter Simulation Conference, edited by A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, Savannah, GA, USA: IEEE.
  • Lee, H. L., V. Padmanabhan, and S. Whang. 2004. “Information Distortion in a Supply Chain: The Bullwhip Effect.” Management Science 50 (4): 546–558. Doi: 10.1287/mnsc.1040.0266
  • Lee, S., F. Pena-Mora, and M. Park. 2006. “Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects.” Journal of Construction Engineering and Management 132 (5): 452–464. doi:10.1061/(ASCE)0733-9364(2006)132:5(452)
  • Lindhard, S., and S. Wandahl. 2012. “On the Road to Improved Scheduling – Fitting Activities to Capacity.” In Proceedings of the Construction, Building and Real Estate Conference: COBRA, edited by D. Kashiwagi and K. Sullivan, 1604–1612. Las Vegas, Nevada: Arizona State University.
  • Lindhard, S. 2014. “Understanding the Effect of Variation in a Production System.” Journal of Construction Engineering and Management 140 (11): 04014051. doi:10.1061/(ASCE)CO.1943-7862.0000887
  • Martinez, J. C. 2010. “Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management.” Journal of Construction Engineering and Management 136 (1): 3–16. doi:10.1061/(ASCE)CO.1943-7862.0000087
  • Meal, H. C. 1984. “Putting Production Decisions Where They Belong.” Harvard Business Review 62 (2): 102–111.
  • Moscoso, P. G., J. C. Fransoo, and D. Fischer. 2010. “An Empirical Study on Reducing Planning Instability in Hierarchical Planning Systems.” Production Planning and Control 21 (4): 413–426. doi:10.1080/09537280903454172
  • Mundaca, F. 2006. “Variability Analysis and Planning Reliability Improvement in Construction Projects.” Valparaíso: M.S. thesis, Dept. of Civil Engineering, Universidad Técnica Federico Santa María.
  • Park, M., and F. Pena-Mora. 2004. “Reliability Buffering for Construction Projects.” Journal of Construction Engineering and Management 130 (5): 626–637. doi:10.1061/(ASCE)0733-9364(2004)130:5(626)
  • Ramrez, R. R., L. F. C. Alarcón, and P. Knights. 2004. “Benchmarking System for Evaluating Management Practices in the Construction Industry.” Journal of Management in Engineering 20 (3): 110–117. doi:10.1061/(ASCE)0742-597X(2004)20:3(110)
  • Sakamoto, M., M. J. Horman, and H. R. Thomas. 2002. “A Study of the Relationship Between Buffers and Performance in Construction.” In 10th Annual Conference of the International Group for Lean Construction, edited by C.T. Formoso and G. Ballard. Gramado, Brazil: IGLC. Gramado, Brazil.
  • Sargent, R. G. 2011. “Verification and Validation of Simulation.” Proceedings of the 2011 Winter Simulation Conference, edited by S. Jain, R.R. Creasey, J. Himmelspach, K.P. White, and M. Fu, 183–198. Phoenix, AZ, USA: IEEE. doi:10.1109/WSC.2011.6147750
  • Selcuk, B., J. C. Fransoo, and A. G. De Kok. 2006. “The Effect of Updating Lead Times on the Performance of Hierarchical Planning Systems.” International Journal of Production Economics 104 (2): 427–440. doi:10.1016/j.ijpe.2005.04.005
  • Shannon, R. E. 1998. “Introduction to the Art and Science of Simulation.” In Proceedings of the 1998 Winter Simulation Conference, edited by D. J. Medeiros, E. F. Watson, J. S. Carson, and M. S. Manivannan, 7–14. Washington, D.C., USA: IEEE.
  • Spetzler, C. S., and C. S. S. Von Holstein. 1975. “Probability Encoding in Decision Analysis.” Management Science 22 (3): 340–358. doi:10.1287/mnsc.22.3.340
  • Sterman, J. D. 2006. “Operational and behavioral causes of supply chain instability” in The Bullwhip Effect in Supply Chains: A Review of Methods, Components and Cases, edited by O. Carranza and F. Villegas. Palgrave Macmillan, Basingstoke, UK..
  • Thomas, H. R., and M. Horman. 2006. “Fundamental Principles of Workforce Management.” Journal of Construction Engineering and Management 132 (1): 97–104. doi:10.1061/(ASCE)0733-9364(2006)132:1(97)
  • Tommelein, I. D., D. R. Riley, and G. A. Howell. 1999. “Parade Game: Impact of Work Flow Variability on Trade Performance.” Journal of Construction Engineering and Management 125 (5): 304–310. doi:10.1061/(ASCE)0733-9364(1999)125:5(304)
  • Tommelein, I. D., and Li. A. E. Y. 1999. “Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration.” In 7th Annual Conference of the International Group for Lean Construction, 97-108. Berkeley, USA: IGLC.
  • Zhao, X., and T. S. Lee. 1996. “Freezing the Master Production Schedule in Multilevel Material Requirements Planning Systems under Deterministic Demand.” Production Planning and Control 7 (2): 144–161. doi:10.1080/09537289608930337

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.