Publication Cover
Production Planning & Control
The Management of Operations
Volume 30, 2019 - Issue 4
702
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

Make-or-break during production: shedding light on change-orders, rework and contractors margin in construction

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 285-298 | Received 30 May 2018, Accepted 10 Oct 2018, Published online: 29 Jan 2019

References

  • Adafin, J., J. O. B. Rotimi, and S. Wilkinson. 2015. “Why do the Design Stage Elemental Cost Plan and Final Tender Sum Differ in New Zealand?.” Journal of Financial Management of Property and Construction 20 (2): 116–131. doi:10.1108/JFMPC-08-2014-0016.
  • Adafin, J., J. O. B. Rotimi, and S. Wilkinson. 2016. “Determining Significant Risks in the Variability Between Design Stage Elemental Cost Plan and the Final Tender Sum.” ASCE Journal of Management in Engineering 32 (6). DOI: (ASCE)ME.1943 5479:0000448.
  • Ahiaga-Dagbui, D. D., P. E. D. Love, S. Smith, and F. Ackermann. 2017. “Toward a Systemic View of Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research.” Project Management Journal 48 (2): 88–98. doi:10.1177/875697281704800207
  • Ahiaga-Dagbui, D. D., and S. D. Smith. 2014. “Rethinking Construction Cost Overruns: Cognition, Learning and Estimation.” Journal of Financial Management of Property and Construction 19 (1): 38–54. doi:10.1108/JFMPC-06-2013-0027.
  • Ahsan, K., and I. Gunawan. 2010. “Analysis of Cost and Schedule Performance of International Development Projects.” International Journal of Project Management 28 (1): 68–78. doi:10.1016/j.ijproman.2009.03.005
  • Aibinu, A. A., and T. Pasco. 2008. “The Accuracy of Pre‐Tender Building Cost Estimates in Australia.” Construction Management and Economics 26 (12): 1257–1269. doi:10.1080/01446190802527514.
  • Akintoye, A. 2000. “Analysis of Factors Influencing Project Cost Estimating Practice.” Construction Management and Economics 18 (1): 77–89. doi:10.1080/014461900370979
  • Allison, D. B., R. M. Shiffrin, and V. Stodden. 2018. “Reproducibility of Research: Issues and Proposed Remedies.” Proceedings of the National Academy of Sciences of the United States of America 115 (11): 2561–2562. doi:10.1073/pnas.1802324115
  • Anastasopoulos, P., J. Haddock, and S. Peeta. 2014. “Cost Overrun in Public-Private Partnerships: Toward Sustainable Highway Maintenance and Rehabilitation.” ASCE Journal of Construction Engineering and Management 140 (6): 04014018. doi:10.1061/(ASCE)CO.1943-7862.0000854
  • Baccarini, D., and P. E. D. Love. 2014. “Statistical Characteristics of Contingency in Water Infrastructure Projects.” ASCE Journal of Construction Engineering and Management 140 (3): 04013063. doi:10.1061/(ASCE)CO.1943-7862.0000820.
  • Baker, M., and D. Penny. 2016. “Is There a Reproducibility Crisis?” Nature 533 (7604): 452–454. Accessed 30 October 2018. https://www.nature.com/news/1-500-scientists-lift-the-lid-on-reproducibility-1.19970
  • Bergh, D. D., B. M. Sharp, H. Aguinis, and M. Liing. 2017. “Is There a Credibility Crisis in Strategic Management Research? Evidence on the Reproducibility of Study Findings.” Strategic Organisation 15 (3): 423–436. doi:10.1177/1476127017701076
  • Bhargava, A., P. Anastasopoulos, S. Labi, K. Sinha, and F. Mannering. 2010. “Three-Stage Least Squares Analysis of Time and Cost Overruns in Construction Contracts.” ASCE Journal of Construction Engineering and Management 136 (11): 1207–1218. doi:10.1061/(ASCE)CO.1943-7862.0000225.
  • Brookes, N., D. Sage, G. Locatelli, A. Dainty, and J. Whyte. 2017. “An Island of Constancy in a Sea of Change: Rethinking Project Temporalities with Long-Term Megaprojects.” International Journal of Project Management 35 (7): 1213–1224. doi:10.1016/j.ijproman.2017.05.007
  • Callegari, C., A. Szklo, and R. Schaeffer. 2018. “Cost Overruns and Delays in Energy Megaprojects: How Big Is Big Enough?” Energy Policy 114: 211–220. doi:10.1016/j.enpol.2017.11.059.
  • Ernst and Young. 2017. “UK Construction: Margin Pressure.” Accessed 14 April 2018. http://www.ey.com/Publication/vwLUAssets/UK_Construction_Industry_-_Margin_matters/$FILE/ATTJK7IP.pdf.
  • Fanelli, D. 2018. “Opinion: Is Science Really Facing a Reproducibility Crisis, and Do we Need It to?” Proceedings of the National Academy of Sciences of the United States of America 115 (11): 2628–2631. doi:10.1073/pnas.1708272114.
  • Flyvbjerg, B., M. Skamris Holm, and S. Buhl. 2002. “Underestimating Costs in Public Works Projects: Error or Lie?” Journal of the American Planning Association 68 (3): 279–295. doi:10.1080/01944360208976273
  • Flyvbjerg, B., and C. R. Sunstein. 2016. “The Principle of the Malevolent Hiding Hand; or, the Planning Fallacy Writ Large.” Social Research: An International Quarterly 83 (4): 979–1004.
  • Flyvbjerg, B., and J. R. Turner. 2018. “Editorial. Do Classics Exist in Megaproject Management?” International Journal of Project Management 36 (1): 334–341. doi:10.1016/j.ijproman.2017.07.006
  • Forcada, N., M. Gangolells, M. Casals, and M. Macarulla. 2017. “Factors Affecting Rework Costs in Construction.” ASCE Journal of Construction Engineering and Management 143 (8): 04017032. doi:10.1061/(ASCE)CO.1943-7862.0001324.
  • Fry, H., S. Ketteridge, and S. Marshall. 1999. A Handbook for Teaching and Learning in Higher Education. Glasgow, UK: Kogan Page.
  • Heffner, C. L. 2016. “Introduction to research.” Accessed 14 April 2018. http://allpsych.com/researchmethods/introduction/
  • Hinze, J., G. Selstad, and J. P. Mahoney. 1992. “Cost Overruns on State of Washington Construction Contracts.” Transportation Research Records 1351: 87–93. Accessed 30 October 2018. http://onlinepubs.trb.org/Onlinepubs/trr/1992/1351/1351-013.pdf
  • Hwang, B.-G., S. R. Thomas, C. T. Haas, and C. H. Caldas. 2009. “Measuring the Impact of Rework on Construction Performance.” ASCE Journal of Construction Engineering and Management 135 (3): 187–198. doi:10.1061/(ASCE)0733-9364(2009)135:3(187).
  • Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2018. “Cost Overruns Helping to Define What They Really Mean.” Proceedings of the Institution of Civil Engineers: Civil Engineering 171 (2): 85–90. doi:10.1680/jcien.17.00001.
  • Jaffe, E. 2013. “Why mega-projects always end up costing more than expected?” CitiLab, July 30. Accessed 8 April 2018. https://www.citylab.com/life/2013/07/why-mega-projects-end-costing-way-more-expected/6364/
  • Jahren, C. T., and A. M. Ashe. 1991. “Predictors of Cost Overrun Rates.” ASCE Journal of Construction Engineering and Management 116 (3): 548–552. doi: 10.1061/(ASCE)0733-9364(1990)116:3(548).
  • Liu, J., P. E. D. Love, J. Smith, Z. Irani, N. Hajli, and M. C. Sing. 2018. “From Design to Operations: A Process Management Life-Cycle Performance Measurement System for Public-Private-Partnerships.” Production Planning and Control 29 (1): 63–83. doi:10.1080/09537287.2017.1382740.
  • Love, P. E. D. 2002. “Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects.” ASCE Journal of Construction Engineering and Management 128 (1): 18–29. 10.1061/(ASCE)0733-9364(2002)128:1(18)
  • Love, P. E. D., and C.-P. Sing. 2013. “Determining the Probability Distribution of Rework Costs in Construction and Engineering Projects.” Structure and Infrastructure Engineering 9 (11): 1136–1148. doi:10.1080/15732479.2012.667420
  • Love, P. E. D., D. D. Ahiaga-Dagbui, S. Smith, and C. P. Sing. 2018a. “Cost Profiling of Water Infrastructure Projects.” ASCE Journal of Infrastructure Systems 24 (4). DOI: 10.1061/(ASCE)IS.1943-555X.0000441
  • Love, P. E. D., I. Simpson, O. Olatunji, J. Smith, and M. Regan. 2015. “Understanding the Landscape of Overruns in Transportation Infrastructure Projects.” Environment and Planning B: Planning and Design 42 (3): 490–509.
  • Love, P. E. D., J. Smith, F. Ackermann, and Z. Irani. 2018d. “The Praxis of Stupidity: An Explanation to Understand the Barriers to Rework Mitigation in Construction.” Production Planning and Control doi:10.1080/09537287.2018.1518551.
  • Love, P. E. D., J. Smith, F. Ackermann, Z. Irani and P. Teo. 2018c. “The Costs of Rework: Insights from Construction and Opportunities for Learning.” Production Planning and Control (In press).
  • Love, P. E. D., J. Smith, M. Regan, Z. Irani, and J. Liu. 2017a. “Cost Performance of Public Infrastructure Projects: The Nemesis and Nirvana of Change-Orders.” Production Planning and Control 28 (13): 1081–1092. doi:10.1080/09537287.2017.1333647
  • Love, P. E. D., J. Zhou, Z. Iran, D. J. Edwards, and C. P. Sing. 2017b. “Off the Rails: Cost Performance of Rail Infrastructure Projects.” Transportation Research Part A: Policy and Practice 99: 14–29. doi:10.1016/j.tra.2017.02.008.
  • Love, P. E. D., P. Teo, F. Ackermann, J. Smith, J. Alexander, E. Palaneeswaran, and J. Morrison. 2018b. “Reduce Rework, Improve Safety: An Empirical Inquiry into the Precursors to Error in Construction.” Production Planning and Control 29 (5): 353–356. doi:10.1080/09537287.2018.1424961
  • Merrow, E. 2011. Industrial Mega-Projects: Concepts, Strategies and Practices for Success. Hoboken, NJ: John Wiley.
  • NAO. 2013. “Government Contracting: The Role of Major Contractors in the Delivery of Public Services.” National Audit Office (NAO), HC-810, Session 2013–2105, 12 November, The Stationary Office. London: Memorandum for Parliament.
  • Odeck, J. 2004. “Cost Overruns in Road Construction — What Are Their Sizes and Determinants?” Transport Policy 11 (1): 43–53. doi:10.1016/S0967-070X(03)00017-9
  • Pashler, H., and E. -J. Wagenmakers. 2012. “Editors’ Introduction to the Special Section on Replicability in Psychological Science: A Crisis of Confidence?” Perspectives on Psychological Science 7 (6): 528–530. doi:10.1177/1745691612465253
  • Patton, M. Q. 2015. Qualitative Research and Evaluation Methods: Integrating Theory and Practice. 4th ed. Saint Paul, MN: Sage Publishing.
  • Rayner, S. 2012. “Uncomfortable Knowledge: The Social Construction of Ignorance in Science and Environmental Policy Discourses.” Economy and Society 41 (1): 107–125. doi: 10.1080/03085147.2011.637335
  • Rousseeuw, P. J., and M. Hubert. 2011. “Robust Statistics for Outlier Detection.” Wiley Interdisciplinary Reviews: Data Mining and Knowledge Discovery 1 (1): 73–79.
  • Shane, J., K. Molenaar, S. Anderson, and C. Schexnayder. 2009. “Construction Project Cost Escalation Factors.” ASCE Journal of Management in Engineering 25 (4): 221. (ASCE)0742-597X(2009)25:4(221). doi: 10.1061/(ASCE)0742-597X(2009)25:4(221).
  • Siemiatycki, M. 2009. “Comparing Perspectives on Transportation Project Cost Overruns.” Journal of Planning Education Research 29 (2): 157–170. doi: 10.1177/0739456X09348798
  • Thurgood, G. S., L. C. Walters, G. R. Williams, and N. D. Wright. 1990. “Changing Environmental for Highway Construction: The Utah Experience with Construction Cost Overruns.” Transportation Record 1262: 121–130. Accessed 30 October 2018. http://onlinepubs.trb.org/Onlinepubs/trr/1990/1262/1262-015.pdf
  • Tozer, B. 2007. “What Is Included in a Contractor’s Margin?” Australian Construction Law Newsletter September/October 116: 48–50. Accessed 30 October 2018. http://classic.austlii.edu.au/au/journals/AUConstrLawNlr/2007/53.pdf
  • Wanberg, J., C. Harper, M. Hallowell, and S. Rajendran. 2013. “Relationship Between Construction Safety and Quality Performance.” ASCE Journal of Construction Engineering and Management 139 (10): 04013003. 10.1061/(ASCE)CO.1943-7862.0000732, 04013003.
  • Welde, M., and J. Odeck. 2017. “Cost Escalations in the Front-End of Projects – Empirical Evidence from Norwegian Road Projects.” Transport Reviews 37 (5): 612–630. doi:10.1080/01441647.2016.1278285
  • Yin, R. K. 1984. Case Study Research: Design and Methods. Beverly Hills, CA: Sage Publications.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.