Publication Cover
Production Planning & Control
The Management of Operations
Volume 31, 2020 - Issue 14
816
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

Bottleneck identification and ranking model for mine operations

ORCID Icon, &
Pages 1178-1194 | Received 04 Dec 2018, Accepted 15 Oct 2019, Published online: 29 Dec 2019

References

  • Atwater, J. B., and S. S. Chakravorty. 2009. “A Study of the Utilization of Capacity Constrained Resources in Drum‐Buffer‐Rope Systems.” Production and Operations Management 11 (2): 259–273. doi:10.1111/j.1937-5956.2002.tb00495.x.
  • Bellgran, M., and K. Safsten. 2010. Production Development Design and Operation of Production Systems. London: Springer.
  • Biswal, S. 2012. “Simulation Study on Industrial Ball Mill for Iron Ore Processing.” Paper presented at International Mineral Processing Congress (IMPC), New Delhi, India, 2012.
  • Bloss, M. 2009. “Increasing Throughput at Olympic Dam by Effective Management of the Mine Bottlleneck.” Mining Technology 118 (1): 33–46. doi:10.1179/174328609X457347.
  • Bodon, P., C. Fricke, T. Sandeman, and C. Stanford. 2011. “Modeling the Mining Supply Chain from Mine to Port: A Combined Optimization and Simulation Approach.” Journal of Mining Science 47 (2): 202–211. doi:10.1134/S1062739147020079.
  • Bozarth, C. C., and R. B. Handfield. 2006. Introduction to Operations and Supply Chain Management. Upper Saddle River, NJ: Pearson Prentice Hall.
  • Cambitsis, A. 2013. “A Framework to Simplify the Management of Throughput and Constraints.” Journal of the South African Institute of Mining and Metallurgy 113 (10): 769–773.
  • Chakravorty, S. S., and J. B. Atwater. 2006. “Bottleneck Management: theory and Practice.” Production Planning & Control 17 (5): 441–447. doi:10.1080/09537280600682752.
  • Chiang, S., C. Kuo, and S. Meerkov. 1998. “Bottlenecks in Markovian Production Lines Identification and Application.” Paper presented at Proceedings from IEEE; 98: Conference Decision & Control, Tampa, FL.
  • Chiang, S., C. Kuo and S. Meerkov. 2000. “DT-Bottlenecks in Serial Production Lines: Theory and Application.” IEEE Transactions on Robotics and Automation 16 (5): 567–580. doi:10.1109/70.880806.
  • de Treville, S., I. Bicer, V. Chavez-Demoulin, V. Hagspiel, N. Schürhoff, C. Tasserit, and S. Wager. 2014. “Valuing Lead Time.” Journal of Operations Management 32 (6): 337–346. doi:10.1016/j.jom.2014.06.002.
  • D'Souza, R. 2004. “A Throughput-based Technique for Identifying Production System Bottlenecks.” Thesis., Mississippi State University.
  • Ernst, A., M. Krishnamoorthy, D. Sier, and L. Marquez. 2008. “Solving Regional Infrastructure Bottlenecks: rail Allocation Policies for a Coal Terminal.” Australasian Journal of Regional Studies 14 (2): 177–193.
  • Eskandari, H., N. Babolmorad, and N. Farrokhnia. 2013. “Bottleneck Analysis in a Pharmaceutical Production Line Using Simulation Approach.” Paper presented at Proceedings of the 2013 Summer Computer Simulation Conference.
  • Goldratt, E., and J. Cox. 1984. The Goal. Revised 1st ed. New York, NY: North River Press.
  • Gurses, A. 1999. “An Activity-Based Costing and Theory of Constraints Model for Product Mix Decisions.” Thesis., Virginia Polytechnic Institute and State University.
  • Hsiao, Y. C., Y. Lin, and Y. K. Huang. 2010. “Optimal Multi-Stage Logistic and Inventory Policies with Production Bottleneck in a Serial Supply Chain.” International Journal of Production Economics 124 (2): 408–413. doi:10.1016/j.ijpe.2009.12.002.
  • Kahraman, M. M. 2015. “Holistic Mine Management by Identification of Real-Time and Historical Production Bottlenecks.” Dissertation: The University of Arizona.
  • Kahraman, M., and S. Dessureault. 2013. “Holistic Mine Management by Identification of Production Bottlenecks.” Paper presented at International Symposium on the 36th Applications of Computers and Operations Research in the Mineral Industry (APCOM), Fundacao Luiz Englert, Porto Alegre, Brazil.
  • Karthikeyan, A. 2007. “Detection of Bottlenecs for Multiproducts and Mitigation using Alternative Process Plans.” Thesis., Anna University.
  • Khan, A. 2011. “An Integrated Optimization Tool with Applications in Mining Using Discrete Rate Stochastic Model.” Dissertation, Dalhouise University.
  • Khan, A., and C. Ciriello. 2013. “Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations.” Presented at Metso Proceedings 2013, Toronto, CA.
  • Lanke, A., H. Hoseinie, and B. Ghodrati. 2016. “Mine Production Index (MPI)-Extension of OEE for Bottleneck Detection in Mining.” International Journal of Mining Science and Technology 26 (5): 753–760. doi:10.1016/j.ijmst.2016.05.050.
  • Law, A., and W. Kelton. 2000. Simulation Modeling and Analysis. 3rd ed. Boston, MA: McGraw Hill.
  • Li, J., and S. Meerkov. 2009. Production Systems Engineering. New York, NY: Springer.
  • Li, L., Q. Chang, and J. Ni. 2009. “Data Driven Bottleneck Detection of Manufacturing Systems.” International Journal of Production Research 47 (18): 5019–5036. doi:10.1080/00207540701881860.
  • Li, L., Q. Chang, J. Ni, and S. Biller. 2009. “Real Time Production Improvement through Bottleneck Control.” International Journal of Production Research 47 (21): 6145–6158. doi:10.1080/00207540802244240.
  • Li, M. 2011. “Modeling Network-Wide Impacts of Traffic Bottleneck Mitigation Strategies under Stochasitic Capacity Conditions.” Dissertation, The University of Utah.
  • Lima, E., L. Chwif, and M. Periera Barreto. 2008. “Methodology for Selecting the Best Suitable Bottleneck Detection Method.” Paper presented at Proceedings of the 2008 Winter Simulation Conference, Miami, FL.
  • Lin, L. 2018. “A Systematic-Theoretic Analysis of Data-Driven Throughput Bottleneck Detection of Production Systems.” Journal of Manufacturing Systems 47: 43–52. doi:10.1016/j.jmsy.2018.03.001.
  • Madowe, A. 2013. “The Mine Planning Process for an Open-Pit Diamond Mining Operation–A Case Study on Letseng Diamond Mine in Lesotho.” Journal of South African Institute of Mining and Metallurgy 7 (547–54): 113.
  • Miwa, K., and S. Takakuwa. 2011. “Operations Modeling and Analysis of an Underground Coal Mine.” Paper presented at Proceedings of the 2011 Winter Simulation Conference, Phoenix, AZ.
  • Mizgier, K., M. Juttner, and S. Wagner. 2013. “Bottleneck Identification in Supply Chain Networks.” International Journal of Production Research 51 (5): 1477–1490. doi:10.1080/00207543.2012.695878.
  • Peng, H. J., M. H. Zhou, M. Z. Liu, Y. Zhang, and Y. B. Huang. 2009. “A Dynamic Optimization Model of an Integrated Coal Supply Chain System and Its Application.” Mining Science and Technology 19: 0842–0846.
  • Petersen, K., M. Khurum, and A. Lefteris. 2014. “Reasons for Bottlenecks in Very Large-Scale System of Systems Development.” Information and Software Technology 56 (10): 1403–1420. doi:10.1016/j.infsof.2014.05.004.
  • Phillis, R., and H. Gumede. 2011. “A Case Study on Stoping Shift Buffering at Impala Platinum: A Critical Chain Project Management Perspective.” Journal of the Southern African Institute of Mining and Metallurgy 111: 793–799.
  • Porter, A. 2010. Operations Management. s.l. Frederiksberg: Ventus Publishing ApS.
  • Roser, C., M. Nakano, and M. Tanaka. 2002. “Shifting Bottleneck Detection.” Paper presented at Proceedings of the 2002 Winter Simulation Conference, San Diego, CA.
  • Roser, C., M. Nakano, and M. Tanaka. 2002. “Throughput Sensitivity Analysis using a Single Simulation.” Paper presented at Proceedings of the 2002 Winter Simulation Conference, San Diego, CA.
  • Sengupta, S., K. Das, and R. VanTil. 2008. “A New Method for Bottleneck Detection.” Paper Presented at Proceedings of the 2008 Winter Simulation Conference, Miami, FL.
  • Shen, M., and L. Chen. 2010. “Production Bottleneck Shiftiness Study.” Paper presented at 2010 International Conference on System Science, Engineering Design and Manufacturing Informatization, Yichang, China.
  • Slack, N., S. Chambers, and R. Johnston. 2007. Operations Management. 5th ed. Essex, UK: Prentice Hall.
  • Tamilselvan, P. 2010. “Bottleneck Shifting in Production Lines Impact of Variability, New Detection Method and Control Strategies.” Thesis, Wichita State University.
  • Van Heerden, F. 2015. “South Africa Colliery Engineers Association.” Accessed 25 January 2015. http://www.sacea.org.za/.%5Cdocs%5CDetermining%20the%20Capicity%20Constraint%20Resource%20of%20an%20Underground%20Production%20Section.pdf.
  • Wang, Y., Q. Zhao, and D. Zheng. 2005. “Bottlenecks in Production Networks: An Overview.” Journal of Systems Science and Systems Engineering 14 (3): 347–363. doi:10.1007/s11518-006-0198-3.
  • Wu, T., and P. O'Grady. 2005. “A Network-Based Approach to Integrated Supply Chain Design.” Production Planning & Control 16 (5): 444–453. doi:10.1080/00207720500148519.
  • Yan, H., Y. An, and W. Shi. 2010. “A New Bottleneck Detecthing Approach to Productivity Improvement of Knowledgeable Manufacturing System.” Journal of Intelligent Manufacturing 21 (6): 665–680. doi:10.1007/s10845-009-0244-3.
  • Yu, C., and A. Matta. 2016. “A Statistical Framework of Data-Driven Bottleneck Identification in Manufacturing Systems.” International Journal of Production Research 54 (21): 6317–6332. doi:10.1080/00207543.2015.1126681.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.