Publication Cover
Production Planning & Control
The Management of Operations
Volume 32, 2021 - Issue 4
511
Views
6
CrossRef citations to date
0
Altmetric
Articles

Value stream analysis and design for make-to-order companies

&
Pages 322-334 | Received 22 Nov 2018, Accepted 23 Feb 2020, Published online: 09 Mar 2020

References

  • Bechte, W. 1988. “Theory and Practice of Load-Oriented Manufacturing Control.” International Journal of Production Research 26 (3): 375–395. doi:10.1080/00207548808947871.
  • Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies in a Job Shop Environment. A Review and a Classification.” International Journal of Production Research 35 (2): 399–420. doi:10.1080/002075497195821.
  • Bertrand, J. W. M., and J. Wortmann. 1981. “Production Control and Information Systems for Component-Manufacturing Shops.” Vol. 1 of Studies in Production and Engineering Economics. Amsterdam: Elsevier.
  • Braglia, M., G. Carmignani, and F. Zammori. 2006. “A New Value Stream Mapping Approach for Complex Production Systems.” International Journal of Production Research 44 (18–19): 3929–3952. doi:10.1080/00207540600690545.
  • Chitturi, R. M., D. J. Glew, and A. Paulls. 2007. “Value Stream Mapping in a Jobshop.” Paper presented at The IET International Conference on Agile Manufacturing, Durham, 142–147.
  • Erlach, K. 2013. Value Stream Design. The Way towards a Lean Factory. Heidelberg: Springer.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics. Boston, MA: McGraw-Hill/Irwin.
  • Jendralski, J. 1978. “Kapazitätsterminierung zur Bestandsregelung in der Werkstattfertigung.” [Capacity Scheduling for a WIP Control in Job Shop Production]. PhD diss., TU Hannover.
  • Khaswala, Z. N., and S. Irani. 2001. “Value Network Mapping. Visualization and Analysis of Multiple Flows in Value Stream Maps.” Paper presented at Proceedings of the Lean Management Solutions Conference, St. Louis, MO, September 10–11.
  • Kingsman, B., L. Worden, L. Hendry, A. Mercer, and E. Wilson. 1993. “Integrating Marketing and Production Planning in Make-To-Order Companies.” International Journal of Production Economics 30–31: 53–66. doi:10.1016/0925-5273(93)90081-U.
  • Koch, Ch. 2018. “Wertstromanalyse und -design für Auftragsfertiger.” [Value Stream Analysis and Design for Make-to-Order Companies]. PhD diss., Hamburg University of Technology.
  • Kuyumcu, A. 2013. “Modellierung der Termintreue in der Produktion.” [Modelling Schedule Reliability in Production]. PhD diss., Hamburg University of Technology.
  • Land, M., and G. Gaalman. 1996. “Workload Control Concepts in Job Shops. A Critical Assessment.” International Journal of Production Economics 46–47: 535–548. doi:10.1016/S0925-5273(96)00088-6.
  • Little, J. 1961. “A Proof of the Queuing Formula L = λW.” Operations Research 9 (3): 383–387. doi:10.1287/opre.9.3.383.
  • Lödding, H. 2012. “A Manufacturing Control Model.” International Journal of Production Research 50 (22): 6311–6328. doi:10.1080/00207543.2011.631605.
  • Lödding, H. 2013. Handbook of Manufacturing Control. Fundamentals, Description, Configuration. Heidelberg: Springer.
  • Lödding, H. 2016. Verfahren der Fertigungssteuerung. Grundlagen, Beschreibung, Konfiguration. [3rd German Edition of: Handbook of Manufacturing Control. Fundamentals, Description, Configuration]. Berlin, Heidelberg: Springer.
  • Lödding, H., P. Nyhuis, M. Schmidt, and A. Kuyumcu. 2014. “Modelling Lateness and Schedule Reliability: How Companies Can Produce on Time.” Production Planning & Control 25 (1): 59–72. doi:10.1080/09537287.2012.655803.
  • Lödding, H., and A. Piontek. 2017. “The Surprising Effectiveness of Earliest Operation Due-Date Sequencing.” Production Planning & Control 28 (5): 459–471. doi:10.1080/09537287.2017.1302616.
  • Mayer, J., and P. Nyhuis. 2017. “Describing the Influence of Setup Optimized Sequencing on Output Lateness of Workstations.” Production Planning & Control 28 (10): 791–801. doi:10.1080/09537287.2017.1314038.
  • Nyhuis, P., (ed), J. Mayer, J. Pielmeier, C. Berger, F. Engehausen, T. Hempel, and P. Hünnekes. 2016. Aktuellen Herausforderungen der Produktionsplanung und -steuerung mittels Industrie 4.0 begegnen [Confronting Actual Challenges of Production Planning and Control with Industry 4.0]. Garbsen: PZH-Verlag.
  • Nyhuis, P., and H.-P. Wiendahl. 2009. “Fundamentals of Production Logistics: Theory.” In Tools and Applications. Heidelberg, Berlin: Springer.
  • Ohno, T. 1988. The Toyota Production System. Beyond Large-Scale Production. Portland, OR: Productivity Press.
  • Petermann, D. 1996. “Modellbasierte Produktionsregelung.” [Model-based Production Control]. PhD diss., University of Hanover 1995, published in Fortschr.-Berichte VDI, Reihe 20, Nr. 193, Düsseldorf: VDI.
  • Pinedo, M. L. 2012. Scheduling. Theory, Algorithms, and Systems. New York, NY: Springer.
  • Rother, M. 2005. “Value-Stream Mapping in a Make-to-Order Environment”. Lean Enterprise Institute. https://www.lean.org/Downloads/Value-_Stream_Mapping_in_a_Make_to_Order_Environment.pdf.
  • Rother, M. 2009. Toyota Kata. Managing People for Improvement, Adaptiveness and Superior Results. New York, NY: McGraw-Hill.
  • Rother, M., and R. Harris. 2001. Creating Continuous Flow – An Action Guide for Managers, Engineers and Production Associates. Cambridge, MA: The Lean Enterprise Institute.
  • Rother, M., and J. Shook. 2003. Learning to See. Value-Stream Mapping to Create Value and Eliminate Muda. Cambridge, MA: The Lean Enterprise Institute.
  • Seitz, M., L. Härtel, M. Hübner, F. Engehausen, R. Rost, N. Meluzov, M. Schmidhuber, et al. 2018. PPS-Report 2017–2018. Studienergebnisse [PPC Report 2017–2018. Study Results]. Hannover: PZH Verlag.
  • Spath, D. (ed), M. Hämmerle, and P. Rally. 2010. Wertschöpfung steigern. Ergebnisse der Datenerhebung über die Verbreitung und Ausgestaltung von Methoden zur Prozessoptimierung in der Produktion mit besonderem Fokus auf die Wertstrommethode [Increasing the Creation of Value. Results of a Data Collection on the Dissemination and Design of Process Optimisation Methods in Production with a Focus on the Value Stream Method]. Stuttgart: Fraunhofer-Verlag.
  • Spearman, M. L., D. L. Woodruff, and W. J. Hopp. 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894. doi:10.1080/00207549008942761.
  • Stamm, M. L., and T. Neitzert. 2008. “Value Stream Mapping in a Manufacture-to-order Small and Medium Enterprise.” Paper presented at the 3rd World Conference on Production and Operations Management (POM), Tokyo, 1–15.
  • Takeda, H. 2006. The Synchronized Production System. Going beyond Just-in-Time through Kaizen. London and Philadelphia: Kogan Page.
  • Wiendahl, H.-P. 1995. Load-Oriented Manufacturing Control. Berlin, Heidelberg: Springer.
  • Yu, K.-W. 2001. Terminkennlinie. Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich [Schedule Reliability Operating Curve. A Methodology for Describing Lateness in Production]. Düsseldorf: VDI-Verl.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.