Publication Cover
Production Planning & Control
The Management of Operations
Volume 32, 2021 - Issue 11
327
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

A fuzzy-based leanness evaluation model for manufacturing organisations

, , & ORCID Icon
Pages 959-974 | Received 09 Oct 2019, Accepted 01 Jun 2020, Published online: 12 Jun 2020

References

  • Ahsan, K. B., M. R. Alam, D. G. Morel, and M. A. Karim. 2019. “Emergency Department Resource Optimisation for Improved Performance: A Review.” Journal of Industrial Engineering International 15 (S1): 253–266. doi:10.1007/s40092-019-00335-x.
  • Al Owad, A., P. Samaranayake, A. Karim, and K. B. Ahsan. 2018. “An Integrated Lean Methodology for Improving Patient Flow in an Emergency Department–Case Study of a Saudi Arabian Hospital.” Production Planning & Control 29 (13): 1058–1081. doi:10.1080/09537287.2018.1511870.
  • Amin, M. A., and M. A. Karim. 2013. “A Time-Based Quantitative Approach for Selecting Lean Strategies for Manufacturing Organisations.” International Journal of Production Research 51 (4): 1146–1167. doi:10.1080/00207543.2012.693639.
  • Anand, G., and R. Kodali. 2008. “Performance Measurement System for Lean Manufacturing: A Perspective from SMEs.” International Journal of Globalisation and Small Business 2 (4): 371–410. doi:10.1504/IJGSB.2008.018101.
  • Arif-Uz-Zaman, A., M. E. Cholette, L. Ma, and A. Karim. 2017. “Extracting Failure Time Data from Industrial Maintenance Records Using Text Mining.” Advanced Engineering Informatics 33: 388–396. doi:10.1016/j.aei.2016.11.004.
  • Bayou, M. E., and A. de Korvin. 2008. “Measuring the Leanness of Manufacturing Systems—A Case Study of Ford Motor Company and General Motors.” Journal of Engineering and Technology Management 25 (4): 287–304. doi:10.1016/j.jengtecman.2008.10.003.
  • Behrouzi, F., and K. Y. Wong. 2011. “Lean Performance Evaluation of Manufacturing Systems: A Dynamic and Innovative Approach.” Procedia Computer Science 3: 388–395. doi:10.1016/j.procs.2010.12.065.
  • Belekoukias, I., J. A. Garza-Reyes, and V. Kumar. 2014. “The Impact of Lean Methods and Tools on the Operational Performance of Manufacturing Organisations.” International Journal of Production Research 52 (18): 5346–5366. doi:10.1080/00207543.2014.903348.
  • Castro, J. 1999. “The Limits of Fuzzy Logic.” Mathew & Soft Computing 6 (2/3): 155–161.
  • Chang, S. L., R. C. Wang, and S. Y. Wang. 2006. “Applying Fuzzy Linguistic Quantifier to Select Supply Chain Partners at Different Phases of Product Life Cycle.” International Journal of Production Economics 100 (2): 348–359. doi:10.1016/j.ijpe.2005.01.002.
  • Chiarini, A., and F. Brunetti. 2019. “What Really Matters for a Successful Implementation of Lean Production?” Production Planning & Control 30 (13): 1091–1101. doi:10.1080/09537287.2019.1589010.
  • Daum, J. H., and P. Bretscher. 2004. “Measuring Performance in a Knowledge Economy: Linking Subjective and Objective Measurement into a “Vector-Based” Concept for Performance Measurement.” Fourth International Conference on Theory and Practice in Performance Measurement and Management, Edinburgh.
  • Gurumurthy, A., and R. Kodali. 2009. “Application of Benchmarking for Assessing the Lean Manufacturing Implementation.” Benchmarking: An International Journal 16 (2): 274–308. doi:10.1108/14635770910948268.
  • Herrera, F., E. Herrera-Viedma, and L. Martı́nez. 2000. “A Fusion Approach for Managing Multi-Granularity Linguistic Term Sets in Decision Making.” Fuzzy Sets and Systems 114 (1): 43–58. doi:10.1016/S0165-0114(98)00093-1.
  • Hong, T.-P., and C.-Y. Lee. 1996. “Induction of Fuzzy Rules and Membership Functions from Training Examples.” Fuzzy Sets and Systems 84 (1): 33–47. doi:10.1016/0165-0114(95)00305-3.
  • Islam, M., E. Habes, A. Karim, and A. S. Syed. 2015. “Quality Certification and Company Performance – The Newly Developed Country Experience.” Journal of Business Economics and Management 17 (4): 628–644. doi:10.3846/16111699.2015.1110712.
  • Islam, M., and M. A. Karim. 2011. “Manufacturing Practices and Performance: Comparison among Small-Medium and Large Industries.” International Journal of Quality & Reliability Management 28 (1): 43–61. doi:10.1108/02656711111097544.
  • Islam, M., A. Turki, M. Murad, and M. A. Karim. 2017. “Do Sustainable Procurement Practices Improve Organisational Performance?” Sustainability 9 (12): 2281–2217. doi:10.3390/su9122281.
  • Kaplan, R. S., and D. P. Norton. 1992. “The Balanced Scorecard: Measures That Drive Performance.” Harvard Business Review, January–February, 71–79.
  • Karim, A. 2009. “A Conceptual Model for Manufacturing Performance Improvement.” Journal of Achievements in Materials and Manufacturing Engineering 35 (1): 87–105.
  • Karim, M. A., and K. Arif‐Uz‐Zaman. 2013. “A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organisations.” Business Process Management Journal 19 (1): 169–196. doi:10.1108/14637151311294912.
  • Karim, M. A., P. Samaranayake, A. J. R. Smith, and S. K. Halgamuge. 2010. “An on-Time Delivery Improvement Model for Manufacturing Organisations.” International Journal of Production Research 48 (8): 2373–2394. doi:10.1080/00207540802642245.
  • Karim, M. A., A. J. R. Smith, and S. Halgamuge. 2008. “Empirical Relationships between Some Manufacturing Practices and Performance.” International Journal of Production Research 46 (13): 3583–3613. doi:10.1080/00207540601164201.
  • Karim, M. A., A. J. R. Smith, S. K. Halgamuge, and M. M. Islam. 2008. “A Comparative Study of Manufacturing Practices and Performance Variables.” International Journal of Production Economics 112 (2): 841–859. doi:10.1016/j.ijpe.2007.07.005.
  • Khadem, M., S. A. Ali, and H. Seifoddini. 2008. “Efficacy of Lean Metrics in Evaluating the Performance of Manufacturing Systems.” International Journal of Industrial Engineering: Theory, Applications and Practice 15 (2): 176–184.
  • Kumar, M. B., and R. Parameshwaran. 2018. “Fuzzy Integrated QFD, FMEA Framework for the Selection of Lean Tools in a Manufacturing Organisation.” Production Planning & Control 29 (5): 403–417. doi:10.1080/09537287.2018.1434253.
  • Lami, I. M., and E. L. Vitti. 2011. “A Combination of Quality Function Deployment and Analytic Network Process to Evaluate Urban Redevelopment Projects: An Application to the Belle de Mai – La Friche of Marseille, France.” Journal of Applied Operational Research 3 (1): 2–12.
  • McMurray, A. J., and M. A. Karim. 2008. “A Perspective on Multiculturalism and Policing.” Cross Cultural Management: An International Journal 15 (4): 321–334. doi:10.1108/13527600810914120.
  • McMurray, A. J., M. A. Karim, and G. Fisher. 2010. “Perspectives on the Recruitment and Retention of Culturally and Linguistically Diverse Police, Cross Cultural Management.” Cross Cultural Management: An International Journal 17 (2): 193–210. doi:10.1108/13527601011038741.
  • Moori, R. G., A. Pescarmona, and H. Kimura. 2013. “Lean Manufacturing and Business Performance in Brazilian Firms.” Journal of Operations and Supply Chain Management 6 (1): 91–105. doi:10.12660/joscmv6n1p91-105.
  • Nounou, A. 2018. “Developing a Lean-Based Holistic Framework for Studying Industrial Systems.” Production Planning & Control 29 (13): 1096–1111. doi:10.1080/09537287.2018.1517422.
  • Panwar, A., R. Jain, A. P. S. Rathore, B. Nepal, and A. C. Lyons. 2018. “The Impact of Lean Practices on Operational Performance–An Empirical Investigation of Indian Process Industries.” Production Planning & Control 29 (2): 158–169. doi:10.1080/09537287.2017.1397788.
  • Peng, W. W., I. Joshua, and S. K. Lin. 2012. “What Is the Leanness Level of Your Organisation in Lean Transformation Implementation? An Integrated Lean Index Using ANP Approach.” Production Planning & Control: The Management of Operations 25 (4): 273–287.
  • Puvanasvaran, P., H. Megat, T. S. Hong, and M. M. Razali. 2009. “The Roles of Communication Process for an Effective Lean Manufacturing Implementation.” Journal of Industrial Engineering and Management 2 (1): 128–152. doi:10.3926/jiem.2009.v2n1.p128-152.
  • Rahman, A., and A. Karim. 2013. “Application of Lean Production to Reducing Operational Waste in a Tile Manufacturing Process.” International Journal of Management Science and Engineering Management 8 (2): 131–134. doi:10.1080/17509653.2013.798948.
  • Ramesh, V., and R. Kodali. 2012. “A Decision Framework for Maximising Lean Manufacturing Performance.” International Journal of Production Research 50 (8): 2234–2251.
  • Rodrigues, J. C. 2013. “Theoretical foundations of fuzzy logic.” Available from http://www.cl.uni-heidelberg.de/index_en.mhtml; http://www.cl.uni-heidelberg.de/courses/ws08/logik/seminarslides/09_Rodrigues.pdf.
  • Saaty, T. L., and L. G. Vargas. 2006. Decision Making with the Analytic Network Process. New York: Springer Science + Business media.
  • Sarhan, J., B. Xia, S. Fawzia, and M. A. Karim. 2017. “Lean Construction Implementation in the Saudi Arabian Construction Industry.” Construction Economics and Building 17 (1): 46–69. doi:10.5130/AJCEB.v17i1.5098.
  • Sarhan, J., B. Xia, S. Fawzia, M. A. Karim, and A. Olanipekun. 2018. “Barriers to Implementing Lean Construction Practices in the Kingdom of Saudi Arabia (KSA) Construction Industry.” Construction Innovation 18 (2): 246–272. doi:10.1108/CI-04-2017-0033.
  • Sarhan, J. G., B. Xia, S. Fawzia, A. Karim, A. O. Olanipekun, and V. Coffey. 2019. “Framework for the Implementation of Lean Construction Strategies Using the Interpretive Structural Modelling (ISM) Technique: A Case of the Saudi Construction Industry.” Engineering, Construction and Architectural Management 27 (1): 1–23. doi:10.1108/ECAM-03-2018-0136.
  • Singh, R., A. Choudhury, M. Tiwari, and R. Maull. 2006. “An Integrated Fuzzy-Based Decision Support System for the Selection of Lean Tools: A Case Study from the Steel Industry.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220 (10): 1735–1749. doi:10.1243/09544054JEM494.
  • Soriano-Meier, H., and P. L. Forrester. 2002. “A Model for Evaluating the Degree of Leanness of Manufacturing Firms.” Integrated Manufacturing Systems 13 (2): 104–109. doi:10.1108/09576060210415437.
  • Srinivasaraghavan, J., and V. Allada. 2006. “Application of Mahalanobis Distance as a Lean Assessment Metric.” The International Journal of Advanced Manufacturing Technology 29 (11-12): 1159–1168. doi:10.1007/s00170-005-0004-2.
  • Susilawati, A., J. Tan, D. Bell, and M. Sarwar. 2015. “Fuzzy Logic Based Method to Measure Degree of Lean Activity in Manufacturing Industry.” Journal of Manufacturing Systems 34: 1–11. doi:10.1016/j.jmsy.2014.09.007.
  • Taj, S., and C. Morosan. 2011. “The Impact of Lean Operations on the Chinese Manufacturing Performance.” Journal of Manufacturing Technology Management 22 (2): 223–240. doi:10.1108/17410381111102234.
  • Vinodh, S., and S. R. Balaji. 2011. “Fuzzy Logic Based Leanness Assessment and Its Decision Support System.” International Journal of Production Research 49 (13): 4027–4041. doi:10.1080/00207543.2010.492408.
  • Vinodh, S., and S. K. Chintha. 2011. “Application of Fuzzy QFD for Enabling Leanness in a Manufacturing Organisation.” International Journal of Production Research 49 (6): 1627–1644. doi:10.1080/00207540903568729.
  • Wan, H., and F. F. Chen. 2008. “A Leanness Measure of Manufacturing Systems for Quantifying Impacts of Lean Initiatives.” International Journal of Production Research 46 (23): 6567–6584. doi:10.1080/00207540802230058.
  • Wang, S. Y., S. L. Chang, and R. C. Wang. 2009. “Assessment of Supplier Performance Based on Product-Development Strategy by Applying Multi-Granularity Linguistic Term Sets.” Omega 37 (1): 215–226. doi:10.1016/j.omega.2006.10.003.
  • Wang, L. X., and J. M. Mendel. 1992. “Generating Fuzzy Rules by Learning from Examples.” IEEE Transactions on Systems, Man, and Cybernetics 22 (6): 1414–1427. doi:10.1109/21.199466.
  • Wong, W. P., J. Ignatius, and K. L. Soh. 2014. “What Is the Leanness Level of Your Organisation in Lean Transformation Implementation? An Integrated Lean Index Using ANP Approach.” Production Planning & Control 25 (4): 273–287. doi:10.1080/09537287.2012.674308.
  • Wong, Y. C., K. Y. Wong, and A. Ali. 2009. “A Study on Lean Manufacturing Implementation in the Malaysian Electrical and Electronics Industry.” European Journal of Scientific Research 38 (4): 521–535.
  • Zadeh, L. A. 1965. “Fuzzy Sets.” Information and Control 8 (3): 338–353. doi:10.1016/S0019-9958(65)90241-X.
  • Zhao, J., and B. K. Bose. 2002. “Evaluation of Membership Functions for Fuzzy Logic Controlled Induction Motor Drive.” In IEEE 2002 28th Annual Conference of the Industrial Electronics Society. IECON 02,1: 229–234.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.