Publication Cover
Production Planning & Control
The Management of Operations
Volume 32, 2021 - Issue 12
1,615
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Lean in High-Mix/Low-Volume industry: a systematic literature review

, , , &
Pages 1004-1019 | Received 27 Dec 2019, Accepted 09 Jun 2020, Published online: 22 Jun 2020

References

  • Albzeirat, M. K., M. I. Hussain, R. Ahmad, F. M. Al-Saraireh, and I. Ahmad. 2018. “A Novel Mathematical Logic for Improvement Using Lean Manufacturing Practices.” Journal of Advanced Manufacturing Systems 17 (03): 391–413. doi:10.1142/S0219686718500233.
  • Alfieri, A., T. Tolio, and M. Urgo. 2012. “A Two-Stage Stochastic Programming Project Scheduling Approach to Production Planning.” The International Journal of Advanced Manufacturing Technology 62 (1–4): 279–290. doi:10.1007/s00170-011-3794-4.
  • Ali Naqvi, S. A., M. Fahad, M. Atir, M. Zubair, and M. M. Shehzad. 2016. “Productivity Improvement of a Manufacturing Facility Using Systematic Layout Planning.” Cogent Engineering 3 (1): 1207296. doi:10.1080/23311916.2016.1207296.
  • Azadegan, A., P. C. Patel, A. Zangoueinezhad, and K. Linderman. 2013. “The Effect of Environmental Complexity and Environmental Dynamism on Lean Practices.” Journal of Operations Management 31 (4): 193–212. doi:10.1016/j.jom.2013.03.002.
  • Bagni, G., M. Godinho Filho, M. Thürer, and M. Stevenson. 2020. “Systematic Review and Discussion of Production Control Systems That Emerged between 1999 and 2018.” Production Planning & Control: 1–15. doi:10.1080/09537287.2020.1742398.
  • Barbosa, C., and A. Azevedo. 2018. “Hybrid Modelling of MTO/ETO Manufacturing Environments for Performance Assessment.” International Journal of Production Research 56 (15): 5147–5171. doi:10.1080/00207543.2017.1421788.
  • Barbosa, C., and A. Azevedo. 2019. “Assessing the Impact of Performance Determinants in Complex MTO/ETO Supply Chains through an Extended Hybrid Modelling Approach.” International Journal of Production Research 57 (11): 3577–3597. doi:10.1080/00207543.2018.1543970.
  • Bertolini, M., G. Romagnoli, and F. Zammori. 2017. “2MTO, a New Mapping Tool to Achieve Lean Benefits in High-Variety Low-Volume Job Shops.” Production Planning & Control 28 (5): 444–458. doi:10.1080/09537287.2017.1302615.
  • Bhamu, J., and K. S. Sangwan. 2014. “Lean Manufacturing: Literature Review and Research Issues.” International Journal of Operations & Production Management 34 (7): 876–940. doi:10.1108/IJOPM-08-2012-0315.
  • Bicheno, J., and M. Hollweg. 2008. The Lean Toolbox: The Essential Guide to Lean Transformation. Buckingham: PICSIE Books.
  • Birkie, S. E., and P. Trucco. 2016. “Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy.” Production Planning & Control 27 (5): 345–359. doi:10.1080/09537287.2015.1127446.
  • Birkie, S. E., P. Trucco, and M. Kaulio. 2017. “Sustaining Performance under Operational Turbulence: The Role of Lean in Engineer-to-Order Operations.” International Journal of Lean Six Sigma 8 (4): 457–481. doi:10.1108/IJLSS-12-2016-0077.
  • Black, J. T. 2007. “Design Rules for Implementing the Toyota Production System.” International Journal of Production Research 45 (16): 3639–3664.
  • Böhme, T., E. Deakins, M. Pepper, and D. Towill. 2014. “Systems Engineering Effective Supply Chain Innovations.” International Journal of Production Research 52 (21): 6518–6537. doi:10.1080/00207543.2014.952790.
  • Bokhorst, J. A., and J. Slomp. 2010. “Lean Production Control at a High-Variety, Low-Volume Parts Manufacturer.” Interfaces 40 (4): 303–312. doi:10.1287/inte.1100.0503.
  • Bong, C. S., K. E. Chong, and W. C. How. 2018. “Job Shop Material Control Based on the Principles of Quick Response Manufacturing.” Journal of Advanced Manufacturing Technology (JAMT) 12 (1): 15–30.
  • Bortolini, R., C. T. Formoso, and D. D. Viana. 2019. “Site Logistics Planning and Control for Engineer-to-Order Prefabricated Building Systems Using BIM 4D Modeling.” Automation in Construction 98: 248–264. doi:10.1016/j.autcon.2018.11.031.
  • Bortolotti, T., P. Danese, and P. Romano. 2013. “Assessing the Impact of Just-in-Time on Operational Performance at Varying Degrees of Repetitiveness.” International Journal of Production Research 51 (4): 1117–1130. doi:10.1080/00207543.2012.678403.
  • Braglia, M., G. Carmignani, and F. Zammori. 2006. “A New Value Stream Mapping Approach for Complex Production Systems.” International Journal of Production Research 44 (18–19): 3929–3952. doi:10.1080/00207540600690545.
  • Braglia, M., M. Frosolini, M. Gallo, and L. Marrazzini. 2019. “Lean Manufacturing Tool in Engineer-to-Order Environment: Project Cost Deployment.” International Journal of Production Research 57 (6): 1825–1839. doi:10.1080/00207543.2018.1508905.
  • Braglia, M., R. Gabbrielli, and L. Marrazzini. 2019. “Overall Task Effectiveness: A New Lean Performance Indicator in Engineer-to-Order Environment.” International Journal of Productivity and Performance Management 68 (2): 407–422. doi:10.1108/IJPPM-05-2018-0192.
  • Cannas, V. G., M. Pero, R. Pozzi, and T. Rossi. 2018. “An Empirical Application of Lean Management Techniques to Support ETO Design and Production Planning.” IFAC-PapersOnLine 51 (11): 134–139. doi:10.1016/j.ifacol.2018.08.247.
  • Chang, J. H., and H. N. Chiu. 2005. “A Comprehensive Review of Lot Streaming.” International Journal of Production Research 43 (8): 1515–1536. doi:10.1080/00207540412331325396.
  • Chaple, A. P., and B. E. Narkhede. 2017. “Value Stream Mapping in a Discrete Manufacturing: A Case Study.” International Journal of Supply Chain Management 6 (1): 55–67.
  • Chongwatpol, J., and R. Sharda. 2013. “Achieving Lean Objectives through RFID: A Simulation‐Based Assessment.” Decision Sciences 44 (2): 239–266. doi:10.1111/deci.12007.
  • Cooney, R. 2002. “Is “Lean” a Universal Production System? Batch Production in the Automotive Industry.” International Journal of Operations & Production Management 22 (10): 1130–1147. doi:10.1108/01443570210446342.
  • Crute, V., Y. Ward, S. Brown, and A. Graves. 2003. “Implementing Lean in Aerospace—Challenging the Assumptions and Understanding the Challenges.” Technovation 23 (12): 917–928. doi:10.1016/S0166-4972(03)00081-6.
  • Danese, P., V. Manfe, and P. Romano. 2018. “A Systematic Literature Review on Recent Lean Research: State‐of‐the‐Art and Future Directions.” International Journal of Management Reviews 20 (2): 579–605. doi:10.1111/ijmr.12156.
  • De Smet, R., and L. Gelders. 1998. “Using Simulation to Evaluate the Introduction of a Kanban Subsystem within an MRP-Controlled Manufacturing Environment.” International Journal of Production Economics 56–57: 111–122. doi:10.1016/S0925-5273(97)00095-9.
  • Deflorin, P., and M. Scherrer-Rathje. 2012. “Challenges in the Transformation to Lean Production from Different Manufacturing-Process Choices: A Path-Dependent Perspective.” International Journal of Production Research 50 (14): 3956–3973. doi:10.1080/00207543.2011.613862.
  • Deuse, J., B. Konrad, and F. Bohnen. 2013. “Renaissance of Group Technology: Reducing Variability to Match Lean Production Prerequisites.” IFAC Proceedings Volumes 46 (9): 998–1003. doi:10.3182/20130619-3-RU-3018.00319.
  • Elfving, J. A., I. D. Tommelein, and G. Ballard. 2005. “Consequences of Competitive Bidding in Project-Based Production.” Journal of Purchasing and Supply Management 11 (4): 173–181. doi:10.1016/j.pursup.2005.12.001.
  • Eloranta, E. 1992. “The Future Factory: Challenge for One-of-a-Kind Production.” International Journal of Production Economics 28 (2): 131–142. doi:10.1016/0925-5273(92)90026-4.
  • Eng, C. K., H. W. Ching, and B. C. Siong. 2015. “Paired-Cell Overlapping Loops of Cards with Authorization Simulation in Job Shop Environment.” International Journal of Mechanical and Mechatronics Engineering 15 (3): 68–73.
  • Forsman, S., A. Bystedt, and M. Öhman. 2011. “Interaction in the Construction Process: System Effects for a Joinery-Products Supplier.” Lean Construction Journal 2011: 1–18.
  • Fredendall, L. D., D. Ojha, and J. W. Patterson. 2010. “Concerning the Theory of Workload Control.” European Journal of Operational Research 201 (1): 99–111. doi:10.1016/j.ejor.2009.02.003.
  • Gallardo, C. A. S., A. D. Granja, and F. A. Picchi. 2014. “Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort.” Journal of Construction Engineering and Management 140 (4): B4013004. doi:10.1061/(ASCE)CO.1943-7862.0000728.
  • Gargeya, V., and J. Thompson. 1994. “Just-in-Time Production in Small Job Shops.” Industrial Management-Chicago Then Atlanta 36: 23–26.
  • Godinho Filho, M., A. G. Marchesini, J. Riezebos, N. Vandaele, and G. M. D. Ganga. 2017a. “The Application of Quick Response Manufacturing Practices in Brazil, Europe, and the USA: An Exploratory Study.” International Journal of Production Economics 193: 437–448. doi:10.1016/j.ijpe.2017.08.006.
  • Godinho Filho, M., A. G. Marchesini, J. Riezebos, N. Vandaele, and G. M. D. Ganga. 2017b. “The Extent of Knowledge of Quick Response Manufacturing Principles: An Exploratory Transnational Study.” International Journal of Production Research 55 (17): 4891–4911. doi:10.1080/00207543.2016.1268729.
  • Gómez, P. F. J., and M. G. Filho. 2017. “Complementing Lean with Quick Response Manufacturing: case Studies.” The International Journal of Advanced Manufacturing Technology 90 (5–8): 1897–1910. doi:10.1007/s00170-016-9513-4.
  • Gosling, J., and M. M. Naim. 2009. “Engineer-to-Order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–754. doi:10.1016/j.ijpe.2009.07.002.
  • Guan, Z., Y. Peng, L. Ma, C. Zhang, and P. Li. 2008. “Operation and Control of Flow Manufacturing Based on Constraints Management for High-Mix/Low-Volume Production.” Frontiers of Mechanical Engineering in China 3 (4): 454–461. doi:10.1007/s11465-008-0083-5.
  • Gupta, S., and S. K. Jain. 2013. “A Literature Review of Lean Manufacturing.” International Journal of Management Science and Engineering Management 8 (4): 241–249. doi:10.1080/17509653.2013.825074.
  • Gupta, S., M. Sharma, and V. Sunder M. 2016. “Lean Services: A Systematic Review.” International Journal of Productivity and Performance Management 65 (8): 1025–1056. doi:10.1108/IJPPM-02-2015-0032.
  • Gurumurthy, A., and R. Kodali. 2011. “Design of Lean Manufacturing Systems Using Value Stream Mapping with Simulation: A Case Study.” Journal of Manufacturing Technology Management 22 (4): 444–473. doi:10.1108/17410381111126409.
  • Hall, R. 1981. Driving the Productivity Machine: Production, Planning and Control in Japan American Production and Inventory Control Society. Virginia: Falls Church.
  • Hendry, L. C. 1998. “Applying World Class Manufacturing to Make-to-Order Companies: problems and Solutions.” International Journal of Operations & Production Management 18 (11): 1086–1100. doi:10.1108/01443579810231679.
  • Hines, P., M. Holweg, and N. Rich. 2004. “Learning to Evolve: A Review of Contemporary Lean Thinking.” International Journal of Operations & Production Management 24 (10): 994–1011. doi:10.1108/01443570410558049.
  • Hines, P., and N. Rich. 1997. “The Seven Value Stream Mapping Tools.” International Journal of Operations & Production Management 17 (1): 46–64. doi:10.1108/01443579710157989.
  • Holweg, M. 2007. “The Genealogy of Lean Production.” Journal of Operations Management 25 (2): 420–437. doi:10.1016/j.jom.2006.04.001.
  • Hopp, W. J. 2008. Supply Chain Science. New York, NY: McGraw-Hill.
  • Hopp, W. J., and M. L. Spearman. 2000. Factory Physics. Milano: McGrawHill.
  • Hopp, W. J., and M. L. Spearman. 2004. “To Pull or Not to Pull: What Is the Question?” Manufacturing & Service Operations Management 6 (2): 133–148. doi:10.1287/msom.1030.0028.
  • Horbal, R., R. Kagan, and T. Koch. 2008. “Implementing Lean Manufacturing in High-Mix Production Environment.” In Lean Business Systems and Beyond, edited by T. Koch, 257–267. Boston, MA: Springer.
  • Hu, Q., R. Mason, S. J. Williams, and P. Found. 2015. “Lean Implementation within SMEs: A Literature Review.” Journal of Manufacturing Technology Management 26 (7): 980–1012. doi:10.1108/JMTM-02-2014-0013.
  • Huang, C. K., H. M. Chang, and C. H. Lin. 2006. “Simulation and Analysis for Layout of Aerospace Sheet Metal Process with Lean Concept.” Materials Science Forum 505–507: 907–912. (VolTrans Tech Publications. doi:10.4028/www.scientific.net/MSF.505-507.907.
  • Huang, C. C., and S. H. Liu. 2005. “A Novel Approach to Lean Control for Taiwan-Funded Enterprises in Mainland China.” International Journal of Production Research 43 (12): 2553–2575. doi:10.1080/00207540500047135.
  • Hunter, S. L. 2001. “Ergonomic Evaluation of Manufacturing System Designs.” Journal of Manufacturing Systems 20 (6): 429–444. doi:10.1016/S0278-6125(01)80062-5.
  • Hunter, S. L. 2008. “The Toyota Production System Applied to the Upholstery Furniture Manufacturing Industry.” Materials and Manufacturing Processes 23 (7): 629–634. doi:10.1080/10426910802316476.
  • Hunter, S. L., S. Bullard, and P. H. Steele. 2004. “Lean Production in the Furniture Industry: The Double D Assembly Cell.” Forest Products Journal 54 (4): 32.
  • Hüttmeir, A., S. De Treville, A. Van Ackere, L. Monnier, and J. Prenninger. 2009. “Trading off between Heijunka and Just-in-Sequence.” International Journal of Production Economics 118 (2): 501–507. doi:10.1016/j.ijpe.2008.12.014.
  • Irani, S. 2011. “Choosing What Works.” Industrial Engineer 43 (8): 42–47.
  • Jaegler, Y., A. Jaegler, P. Burlat, S. Lamouri, and D. Trentesaux. 2018. “The ConWip Production Control System: A Systematic Review and Classification.” International Journal of Production Research 56 (17): 5736–5757. doi:10.1080/00207543.2017.1380325.
  • James-Moore, S. M., and A. Gibbons. 1997. “Is Lean Manufacture Universally Relevant? An Investigative Methodology.” International Journal of Operations & Production Management 17 (9): 899–911. doi:10.1108/01443579710171244.
  • Jasti, N. V. K., and R. Kodali. 2015. “Lean Production: Literature Review and Trends.” International Journal of Production Research 53 (3): 867–885. doi:10.1080/00207543.2014.937508.
  • Jina, J., A. K. Bhattacharya, and A. D. Walton. 1997. “Applying Lean Principles for High Product Variety and Low Volumes: some Issues and Propositions.” Logistics Information Management 10 (1): 5–13. doi:10.1108/09576059710159655.
  • Jünge, G., E. Alfnes, K. Kjersem, and B. Andersen. 2019. “Lean Project Planning and Control: Empirical Investigation of ETO Projects.” International Journal of Managing Projects in Business 12 (4): 1120–1145. doi:10.1108/IJMPB-08-2018-0170.
  • Junior, M. L., and M. Godinho Filho. 2010. “Variations of the Kanban System: Literature Review and Classification.” International Journal of Production Economics 125 (1): 13–21. doi:10.1016/j.ijpe.2010.01.009.
  • Karim, A., and K. Arif-Uz-Zaman. 2013. “A Methodology for Effective Implementation of Lean Strategies and Its Performance Evaluation in Manufacturing Organizations.” Business Process Management Journal 19 (1): 169–196. doi:10.1108/14637151311294912.
  • Karlsson, C., and P. Åhlström. 1997. “A Lean and Global Smaller Firm?” International Journal of Operations & Production Management 17 (10): 940–952. doi:10.1108/01443579710176915.
  • Kulonda, D. J. 2002. “Managing Erratic Demand: The Multi-Channel Manufacturing Approach.” Journal of Textile and Apparel Technology and Management 2 (3): 1–8.
  • Kumar, M., and V. S. Rodrigues. 2020. “Synergetic Effect of Lean and Green on Innovation: A Resource-Based Perspective.” International Journal of Production Economics 219: 469–479. doi:10.1016/j.ijpe.2018.04.007.
  • Lander, E., and J. K. Liker. 2007. “The Toyota Production System and Art: Making Highly Customized and Creative Products the Toyota Way.” International Journal of Production Research 45 (16): 3681–3698. doi:10.1080/00207540701223519.
  • Leonardo, D. G., B. Sereno, D. S. A. D. Silva, M. Sampaio, A. A. Massote, and J. C. Simões. 2017. “Implementation of Hybrid Kanban-CONWIP System: A Case Study.” Journal of Manufacturing Technology Management 28 (6): 714–736. doi:10.1108/JMTM-03-2016-0043.
  • Liker, J. K., and D. Meier. 2006. The Toyota Way Fieldbook. New York: McGraw-Hill Education.
  • Mahmood, W. W., M. Z. Yusup, M. R. Salleh, M. R. Muhamad, and M. N. Ab Rahman. 2018. “Simulation Modelling for Lean Production: Case Study.” Journal of Advanced Manufacturing Technology 12 (1): 223–232.
  • Mahoney, R. M. 1997. High-Mix Low-Volume Manufacturing. Upper Saddle River, NJ: Prentice Hall.
  • Mason-Jones, R., B. Naylor, and D. R. Towill. 2000. “Lean, Agile or Leagile? Matching Your Supply Chain to the Marketplace.” International Journal of Production Research 38 (17): 4061–4070. doi:10.1080/00207540050204920.
  • Matawale, C. R., S. Datta, and S. S. Mahapatra. 2016. “A Fuzzy Embedded Leagility Assessment Module in Supply Chain.” Benchmarking: An International Journal 23 (7): 1937–1982. doi:10.1108/BIJ-12-2013-0113.
  • Matt, D. T., P. Dallasega, and E. Rauch. 2014. “Synchronization of the Manufacturing Process and On-Site Installation in ETO Companies.” Procedia CIRP 17: 457–462. doi:10.1016/j.procir.2014.01.058.
  • Mazzocato, P., C. Savage, M. Brommels, H. Aronsson, and J. Thor. 2010. “Lean Thinking in Healthcare: A Realist Review of the Literature.” BMJ Quality & Safety 19 (5): 376–382. doi:10.1136/qshc.2009.037986.
  • McGovern, T. O. M., C. Hicks, and C. F. Earl. 1999. “Modelling Supply Chain Management Processes in Engineer-to-Order Companies.” International Journal of Logistics Research and Applications 2 (2): 147–159. doi:10.1080/13675569908901578.
  • Mei, Y., J. Ye, and Z. Zeng. 2018. “Two-Way Scheduling Optimization of the Supply Chain in One-of-a-Kind Production Based on Dynamic Production Capacity Restrictions.” Journal of Manufacturing Systems 47: 168–178. doi:10.1016/j.jmsy.2018.05.007.
  • Mello, M. H., J. O. Strandhagen, and E. Alfnes. 2015. “Analyzing the Factors Affecting Coordination in Engineer-to-Order Supply Chain.” International Journal of Operations & Production Management 35 (7): 1005–1031. doi:10.1108/IJOPM-12-2013-0545.
  • Mongeon, P., and A. Paul-Hus. 2016. “The Journal Coverage of Web of Science and Scopus: A Comparative Analysis.” Scientometrics 106 (1): 213–228. doi:10.1007/s11192-015-1765-5.
  • Mortágua, J., N. O. Fernandes, and S. Carmo-Silva. 2014. “How Continuous Workload-Based Release Methods Perform in Flow Shops?” Romanian Review Precision Mechanics, Optics & Mechatronics 2014 (45): 1–6.
  • Moyano-Fuentes, J., and M. Sacristán-Díaz. 2012. “Learning on Lean: A Review of Thinking and Research.” International Journal of Operations & Production Management 32 (5): 551–582.
  • Muda, M. S., and L. Hendry. 2003. “The SHEN Model for MTO SMEs: A Performance Improvement Tool.” International Journal of Operations & Production Management 23 (5): 470–486. doi:10.1108/01443570310471820.
  • Muda, S., and L. Hendry. 2002a. “Developing a New World Class Model for Small and Medium Sized Make-to-Order Companies.” International Journal of Production Economics 78 (3): 295–310. doi:10.1016/S0925-5273(01)00085-8.
  • Muda, S., and L. Hendry. 2002b. “Proposing a World-Class Manufacturing Concept for the Make-to-Order Sector.” International Journal of Production Research 40 (2): 353–373. doi:10.1080/00207540110081470.
  • Myrelid, A., and J. Olhager. 2019. “Hybrid Manufacturing Accounting in Mixed Process Environments: A Methodology and a Case Study.” International Journal of Production Economics 210: 137–144. doi:10.1016/j.ijpe.2019.01.024.
  • Negrão, L. L. L., M. Godinho Filho, and G. Marodin. 2016. “Lean Practices and Their Effect on Performance: A Literature Review.” Production Planning & Control 28 (1): 1–56. doi:10.1080/09537287.2016.1231853.
  • Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. London: CRC Press.
  • Olaitan, O., E. Alfnes, J. Vatn, and J. O. Strandhagen. 2019. “CONWIP Implementation in a System with Cross-Trained Teams.” International Journal of Production Research 57 (20): 6473–6486. doi:10.1080/00207543.2019.1566671.
  • Olhager, J. 2003. “Strategic Positioning of the Order Penetration Point.” International Journal of Production Economics 85 (3): 319–329. doi:10.1016/S0925-5273(03)00119-1.
  • Olhager, J., and D. I. Prajogo. 2012. “The Impact of Manufacturing and Supply Chain Improvement Initiatives: A Survey Comparing Make-to-Order and Make-to-Stock Firms.” Omega 40 (2): 159–165. doi:10.1016/j.omega.2011.05.001.
  • Panizzolo, R. 1998. “Applying the Lessons Learned from 27 Lean Manufacturers: The Relevance of Relationships Management.” International Journal of Production Economics 55 (3): 223–240. doi:10.1016/S0925-5273(98)00066-8.
  • Papadopoulou, T. C., and M. Özbayrak. 2005. “Leanness: Experiences from the Journey to Date.” Journal of Manufacturing Technology Management 16 (7): 784–807. doi:10.1108/17410380510626196.
  • Pettersen, J. 2009. “Defining Lean Production: some Conceptual and Practical Issues.” The TQM Journal 21 (2): 127–142. doi:10.1108/17542730910938137.
  • Portioli-Staudacher, A., and M. Tantardini. 2012a. “Lean Implementation in Non-Repetitive Companies: A Survey and Analysis.” International Journal of Services and Operations Management 11 (4): 385–406. doi:10.1504/IJSOM.2012.046076.
  • Portioli-Staudacher, A., and M. Tantardini. 2012b. “A Lean-Based ORR System for Non-Repetitive Manufacturing.” International Journal of Production Research 50 (12): 3257–3273. doi:10.1080/00207543.2011.564664.
  • Powell, D., J. O. Strandhagen, I. Tommelein, G. Ballard, and M. Rossi. 2014. “A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers.” Procedia CIRP 17: 571–576. doi:10.1016/j.procir.2014.01.137.
  • Raghavan, V. A., S. Yoon, and K. Srihari. 2014. “Lean Transformation in a High Mix Low Volume Electronics Assembly Environment.” International Journal of Lean Six Sigma 5 (4): 342–360. doi:10.1108/IJLSS-07-2013-0042.
  • Rauch, E., P. Dallasega, and D. T. Matt. 2015. “Synchronization of Engineering, Manufacturing and on-Site Installation in Lean ETO-Enterprises.” Procedia CIRP 37: 128–133. doi:10.1016/j.procir.2015.08.047.
  • Rawabdeh, I. A. 2005. “A Model for the Assessment of Waste in Job Shop Environments.” International Journal of Operations & Production Management 25 (8): 800–822. doi:10.1108/01443570510608619.
  • Rossini, M., F. Audino, F. Costa, F. D. Cifone, K. Kundu, and A. Portioli-Staudacher. 2019. “Extending Lean Frontiers: A Kaizen Case Study in an Italian MTO Manufacturing Company.” The International Journal of Advanced Manufacturing Technology 104 (5-8): 1869–1888. doi:10.1007/s00170-019-03990-x.
  • Sanderson, J., and A. Cox. 2008. “The Challenges of Supply Strategy Selection in a Project Environment: Evidence from UK Naval Shipbuilding.” Supply Chain Management: An International Journal 13 (1): 16–25. doi:10.1108/13598540810850283.
  • Seth, D., N. Seth, and P. Dhariwal. 2017. “Application of Value Stream Mapping (VSM) for Lean and Cycle Time Reduction in Complex Production Environments: A Case Study.” Production Planning & Control 28 (5): 398–419. doi:10.1080/09537287.2017.1300352.
  • Shah, R., and P. T. Ward. 2003. “Lean Manufacturing: Context, Practice Bundles, and Performance.” Journal of Operations Management 21 (2): 129–149. doi:10.1016/S0272-6963(02)00108-0.
  • Shah, R., and P. T. Ward. 2007. “Defining and Developing Measures of Lean Production.” Journal of Operations Management 25 (4): 785–805. doi:10.1016/j.jom.2007.01.019.
  • Silva, C., M. Stevenson, and M. Thurer. 2015. “A Case Study of the Successful Implementation of Workload Control: A Practitioner-Led Approach.” Journal of Manufacturing Technology Management 26 (2): 280–296. doi:10.1108/JMTM-10-2013-0144.
  • Slomp, J., J. A. Bokhorst, and R. Germs. 2009. “A Lean Production Control System for High-Variety/Low-Volume Environments: A Case Study Implementation.” Production Planning & Control 20 (7): 586–595. doi:10.1080/09537280903086164.
  • Soliman, M., and T. A. Saurin. 2017. “Lean Production in Complex Socio-Technical Systems: A Systematic Literature Review.” Journal of Manufacturing Systems 45: 135–148. doi:10.1016/j.jmsy.2017.09.002.
  • Stockton, D. J., and R. J. Lindley. 1995. “Implementing Kanbans within High Variety/Low Volume Manufacturing Environments.” International Journal of Operations & Production Management 15 (7): 47–59. doi:10.1108/01443579510090417.
  • Strandhagen, J. W., L. R. Vallandingham, E. Alfnes, and J. O. Strandhagen. 2018. “Operationalizing Lean Principles for Lead Time Reduction in Engineer-to-Order (ETO) Operations: A Case Study.” IFAC-PapersOnLine 51 (11): 128–133. doi:10.1016/j.ifacol.2018.08.246.
  • Stump, B., and F. Badurdeen. 2012. “Integrating Lean and Other Strategies for Mass Customization Manufacturing: A Case Study.” Journal of Intelligent Manufacturing 23 (1): 109–124. doi:10.1007/s10845-009-0289-3.
  • Suárez-Barraza, M. F., T. Smith, and S. M. Dahlgaard-Park. 2012. “Lean Service: A Literature Analysis and Classification.” Total Quality Management & Business Excellence 23 (3–4): 359–380. doi:10.1080/14783363.2011.637777.
  • Thürer, M., T. Maschek, L. Fredendall, P. Gianiodis, M. Stevenson, and J. Deuse. 2019. “On the Integration of Manufacturing Strategy: Deconstructing Hoshin Kanri.” Management Research Review 42 (3): 412–426. doi:10.1108/MRR-04-2018-0178.
  • Thürer, M., M. Stevenson, and C. W. Protzman. 2015. “COBACABANA (Control of Balance by Card Based Navigation): an Alternative to Kanban in the Pure Flow Shop?” International Journal of Production Economics 166: 143–151. doi:10.1016/j.ijpe.2015.05.010.
  • Thürer, M., M. Stevenson, and C. W. Protzman. 2016. “Card-Based Production Control: A Review of the Control Mechanisms Underpinning Kanban, ConWIP, POLCA and COBACABANA Systems.” Production Planning & Control 27 (14): 1143–1157.
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, and L. D. Fredendall. 2012. “Workload Control and Order Release: A Lean Solution for Make‐to‐Order Companies.” Production and Operations Management 21 (5): 939–953. doi:10.1111/j.1937-5956.2011.01307.x.
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, L. D. Fredendall, and S. A. Melnyk. 2014. “Lean Control for Make‐to‐Order Companies: Integrating Customer Enquiry Management and Order Release.” Production and Operations Management 23 (3): 463–476. doi:10.1111/poms.12058.
  • Thürer, M., I. Tomašević, and M. Stevenson. 2017. “On the Meaning of ‘Waste’: Review and Definition.” Production Planning & Control 28 (3): 244–255. doi:10.1080/09537287.2016.1264640.
  • Thürer, M., I. Tomašević, M. Stevenson, C. Blome, S. Melnyk, H. K. Chan, and G. Q. Huang. 2019. “A Systematic Review of China’s Belt and Road Initiative: Implications for Global Supply Chain Management.” International Journal of Production Research 58 (8): 2436–2418. doi:10.1080/00207543.2019.1605225.
  • Tranfield, D., D. Denyer, and P. Smart. 2003. “Towards a Methodology for Developing Evidence‐Informed Management Knowledge by Means of Systematic Review.” British Journal of Management 14 (3): 207–222. doi:10.1111/1467-8551.00375.
  • Villar-Fidalgo, L., M. D. M. Espinosa Escudero, and M. Domínguez Somonte. 2019. “Applying Kaizen to the Schedule in a Concurrent Environment.” Production Planning & Control 30 (8): 624–638. doi:10.1080/09537287.2019.1566281.
  • White, R. E., and V. Prybutok. 2001. “The Relationship between JIT Practices and Type of Production System.” Omega 29 (2): 113–124. doi:10.1016/S0305-0483(00)00033-5.
  • Womack, J. P., and D. T. Jones. 1996. Lean Thinking: Banish Waste and Create Wealth in Your Organization. New York: Simon and Shuster.
  • Womack, J. P., D. T. Jones, and D. Roos. 1990. The Machine That Changed the World. New York: Rawson Associates.
  • Woollard, F. G. 1954. Principles of Mass and Flow Production. New York: Iliffe.
  • Yin, Y., K. E. Stecke, and D. Li. 2018. “The Evolution of Production Systems from Industry 2.0 through Industry 4.0.” International Journal of Production Research 56 (1–2): 848–861. doi:10.1080/00207543.2017.1403664.
  • Yusof, S. R. M., and E. Aspinwall. 2000. “Total Quality Management Implementation Frameworks: Comparison and Review.” Total Quality Management 11 (3): 281–294. doi:10.1080/0954412006801.
  • Yusuf, Y. Y., and E. O. Adeleye. 2002. “A Comparative Study of Lean and Agile Manufacturing with a Related Survey of Current Practices in the UK.” International Journal of Production Research 40 (17): 4545–4562. doi:10.1080/00207540210157141.
  • Zhou, J., Q. Zhang, X. Wang, and H. Xiao. 2016. “Lean System Design for Engineer-to-Order Manufacturing.” Journal of Shanghai Jiaotong University (Science) 21 (6): 702–712. doi:10.1007/s12204-016-1784-2.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.