References
- Adler, P. 1995. “Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface.” Organization Science 6 (2): 147–167. doi:https://doi.org/10.1287/orsc.6.2.147.
- Ajayi, S., and L. Oyedele. 2018. “Critical Design Factors for Minimising Waste in Construction Projects: A Structural Equation Modelling Approach.” Resources, Conservation and Recycling 137: 302–313. doi:https://doi.org/10.1016/j.resconrec.2018.06.005.
- Al-Mazrouie, J. R., U. Ojiako, T. Williams, M. Chipulu, and A. Marshall. 2020. “An Operations Readiness Typology for Mitigating against Transitional ‘Disastrous Openings’ of Airport Infrastructure Projects.” Production Planning & Control doi:https://doi.org/10.1080/09537287.2020.1730997.
- Amigo, C., D. Iritani, H. Rozenfeld, and A. Ometto. 2013. “Product Development Process Modelling: State of the Art and Classification.” In Smart Product Engineering. Lecture Notes in Production Engineering, edited by M. Abramovici and R. Stark. Berlin, Heidelberg: Springer.
- Arantes, A., and L. Ferreira. 2020. “A Methodology for the Development of Delay Mitigation Measures in Construction Projects.” Production Planning & Control doi:https://doi.org/10.1080/09537287.2020.1725169.
- Archer, N., and F. Ghasemzadeh. 1999. “An Integrated Framework for Project Portfolio Selection.” International Journal of Project Management 17 (4): 207–216. doi:https://doi.org/10.1016/S0263-7863(98)00032-5.
- Association for Project Management (APM). 2006. APM Body of Knowledge. 5th ed. Cambridge, UK: Association for Project Management.
- Bloomfield, K., T. Williams, C. Bovis, and Y. Merali. 2019. “Systemic Risk in Major Public Contracts.” International Journal of Forecasting 35 (2): 667–676. doi:https://doi.org/10.1016/j.ijforecast.2018.10.005.
- Browning, T. 2016. “Design Structure Matrix Extensions and Innovations: A Survey and New Opportunities.” IEEE Transactions on Engineering Management 63 (1): 27–52. doi:https://doi.org/10.1109/TEM.2015.2491283.
- Caldwell, B., R. Palmer, and H. Cuevas. 2008. “Information Alignment and Task Coordination in Organizations: An ‘Information Clutch’ Metaphor.” Information Systems Management 25 (1): 33–44. doi:https://doi.org/10.1080/10580530701777131.
- Chan, F., Z. Wang, Y. Singh, X. Wang, J. Ruan, and M. Tiwari. 2019. “Activity Scheduling and Resource Allocation with Uncertainties and Learning in Activities.” Industrial Management & Data Systems 119 (6): 1289–1320. doi:https://doi.org/10.1108/IMDS-01-2019-0002.
- Chipulu, M., U. Ojiako, P. Gardiner, T. Williams, C. Mota, S. Maguire, Y. Shou, T. Stamati, and A. Marshall. 2014. “Exploring the Impact of Cultural Values on Project Performance: The Effects of Cultural Values, Age and Gender on the Perceived Importance of Project Success/Failure Factors.” International Journal of Operations & Production Management 34 (3): 364–389. doi:https://doi.org/10.1108/IJOPM-04-2012-0156.
- Chipulu, M., U. Ojiako, A. Marshall, T. Williams, U. Bititci, C. Mota, Y. Shou, et al. 2019. “A Dimensional Analysis of Stakeholder Assessment of Project Outcomes.” Production Planning & Control 30 (13): 1072–1090. doi:https://doi.org/10.1080/09537287.2019.1567859.
- Chipulu, M., U. Ojiako, A. Marshall, T. Williams, J. Neoh, C. Mota, and Y. Shou. 2016. “Building Cultural Intelligence: insights from Project Management Job Advertisements.” Production Planning & Control 27 (3): 133–147. doi:https://doi.org/10.1080/09537287.2015.1083623.
- Chu, J., X. Liu, and Y. Wang. 2016. “Social Network Analysis-Based Approach to Group Decision Making Problem with Fuzzy Preference Relations.” Journal of Intelligent & Fuzzy Systems 31 (3): 1271–1285. doi:https://doi.org/10.3233/IFS-162193.
- Collins, S., A. Yassine, and S. Borgatti. 2009. “Evaluating Product Development Systems Using Network Analysis.” Systems Engineering 12 (1): 55–68. doi:https://doi.org/10.1002/sys.20108.
- Correa da Silva, F., and J. Agusti-Cullell. 2008. Information Flow and Knowledge Sharing. Oxford: Elsevier Series on Capturing Intelligence.
- Cox, A., and I. Thompson. 1997. “Fit for Purpose’ Contractual Relations: Determining a Theoretical Framework for Construction Projects.” European Journal of Purchasing & Supply Management 3 (3): 127–135. doi:https://doi.org/10.1016/S0969-7012(97)00005-1.
- Cummings, J., J. A. Espinosa, and C. K. Pickering. 2009. “Crossing Spatial and Temporal Boundaries in Globally Distributed Projects: A Relational Model of Coordination Delay.” Information Systems Research 20 (3): 420–439. doi:https://doi.org/10.1287/isre.1090.0239.
- Dehghan, R., K. Hazini, and J. Ruwanpura. 2015. “Optimization of Overlapping Activities in the Design Phase of Construction Projects.” Automation in Construction 59: 81–95. doi:https://doi.org/10.1016/j.autcon.2015.08.004.
- Dubey, R., and S. Ali. 2014. “Identification of Flexible Manufacturing System Dimensions and Their Interrelationship Using Total Interpretive Structural Modelling and Fuzzy MICMAC Analysis.” Global Journal of Flexible Systems Management 15 (2): 131–143. doi:https://doi.org/10.1007/s40171-014-0058-9.
- Dubois, A., and L. Gadde. 2002. “The Construction Industry as a Loosely Coupled System: implications for Productivity and Innovation.” Construction Management and Economics 20 (7): 621–631. doi:https://doi.org/10.1080/01446190210163543.
- Duperrin, J., and M. Godet. 1973. Methode de hierarchisation des elements d'un Systeme, Rapport Economique du CEA, R-45-51, Pans.
- Eriksson, P. 2013. “Exploration and Exploitation in Project-Based Organizations: Development and Diffusion of Knowledge at Different Organizational Levels in Construction Companies.” International Journal of Project Management 31 (3): 333–341. doi:https://doi.org/10.1016/j.ijproman.2012.07.005.
- Ethiraj, S. K., and D. Levinthal. 2004. “Bounded Rationality and the Search for Organizational Architecture: An Evolutionary Perspective on the Design of Organizations and Their Evolvability.” Administrative Science Quarterly 49 (3): 404–437.
- Flood, I., and R. Issa. 2010. “Empirical Modeling Methodologies for Construction.” Journal of Construction Engineering and Management 136 (1): 36–48. doi:https://doi.org/10.1061/(ASCE)CO.1943-7862.0000138.
- Francis, A., and E. Miresco. 2006. “A Chronographic Method for Construction Project Planning.” Canadian Journal of Civil Engineering 33 (12): 1547–1557. doi:https://doi.org/10.1139/l06-148.
- Gomes, P., and S. Dahab. 2010. “Bundling Resources across Supply Chain Dyads: The Role of Modularity and Coordination Capabilities.” International Journal of Operations & Production Management 30 (1): 57–74. doi:https://doi.org/10.1108/01443571011012370.
- Gorton, I., and S. Motwani. 1996. “Issues in Co-Operative Software Engineering Using Globally Distributed Teams.” Information and Software Technology 38 (10): 647–655. doi:https://doi.org/10.1016/0950-5849(96)01099-3.
- Gulati, R., and M. Sytch. 2007. “Dependence Asymmetry and Joint Dependence in Interorganizational Relationships: Effects of Embeddedness on a Manufacturer's Performance in Procurement Relationships.” Administrative Science Quarterly 52 (1): 32–69. doi:https://doi.org/10.2189/asqu.52.1.32.
- Helo, P. 2006. “Product Configuration Analysis with Design Structure Matrix.” Industrial Management & Data Systems 106 (7): 997–1011. doi:https://doi.org/10.1108/02635570610688896.
- Herroelen, W. 2009. “Project scheduling – Theory and Practice.” Production and Operations Management 14 (4): 413–432. doi:https://doi.org/10.1111/j.1937-5956.2005.tb00230.x.
- Huo, B., M. Gu, and D. Prajogo. 2016. “Flow Management and Its Impacts on Operational Performance.” Production Planning & Control 27 (15): 1233–1248. doi:https://doi.org/10.1080/09537287.2016.1203468.
- Hwang, W., B. Hsiao, H. Chen, and C. Chern. 2016. “Multiphase Assessment of Project Risk Interdependencies: evidence from a University ISD Project in Taiwan.” Project Management Journal 47 (1): 59–75. doi:https://doi.org/10.1002/pmj.21563.
- Isaac, S., M. Curreli, and Y. Stoliar. 2017. “Work Packaging with BIM.” Automation in Construction 83: 121–133. doi:https://doi.org/10.1016/j.autcon.2017.08.030.
- Joao, J., M. Suleman, O. Mutlu, and Y. Patt. 2012. “Bottleneck Identification and Scheduling in Multithreaded Applications.” ACM SIGPLAN Notices 47 (4): 223–234. doi:https://doi.org/10.1145/2248487.2151001.
- Jrade, A., and F. Jalaei. 2013. “Integrating Building Information Modelling with Sustainability to Design Building Projects at the Conceptual Stage.” Building Simulation 6 (4): 429–444. doi:https://doi.org/10.1007/s12273-013-0120-0.
- Kanjanabootra, S., and B. Corbitt. 2016. “Reproducing Knowledge in Construction Expertise: A Reflexive Theory, Critical Approach.” Construction Management and Economics 34 (7–8): 561–577. doi:https://doi.org/10.1080/01446193.2016.1151064.
- Kelley, J. 1961. “Critical-Path Planning and Scheduling: Mathematical Basis.” Operations Research 9 (3): 296–320. doi:https://doi.org/10.1287/opre.9.3.296.
- Khan, K., R. Flanagan, and S. Lu. 2016. “Managing Information Complexity Using System Dynamics on Construction Projects.” Construction Management and Economics 34 (3): 192–204. doi:https://doi.org/10.1080/01446193.2016.1190026.
- Kohler, W. 1975. “A Preliminary Evaluation of the Critical Path Method for Scheduling Tasks on Multiprocessor Systems.” IEEE Transactions on Computers C-24 (12): 1235–1238. doi:https://doi.org/10.1109/T-C.1975.224171.
- Kyriakopoulos, K., and K. De Ruyter. 2004. “Knowledge Stocks and Information Flows in New Product Development.” Journal of Management Studies 41 (8): 1469–1498. doi:https://doi.org/10.1111/j.1467-6486.2004.00482.x.
- Laslo, Z. 2010. “Project Portfolio Management: An Integrated Method for Resource Planning and Scheduling to Minimize Planning/Scheduling- Dependent Expenses.” International Journal of Project Management 28 (6): 609–618. doi:https://doi.org/10.1016/j.ijproman.2009.10.001.
- Lee, C., H. Chong, P. Liao, and X. Wang. 2018. “Critical Review of Social Network Analysis Applications in Complex Project Management.” Journal of Management in Engineering 34 (2): 04017061. doi:https://doi.org/10.1061/(ASCE)ME.1943-5479.0000579.
- Ligthart, R., L. Oerlemans, and N. Noorderhaven. 2016. “In the Shadows of Time: A Case Study of Flexibility Behaviours in an Interorganizational Project.” Organization Studies 37 (12): 1721–1743. doi:https://doi.org/10.1177/0170840616655487.
- Lin, J., Y. Qian, W. Cui, and T. Goh. 2015. “An Effective Approach for Scheduling Coupled Activities in Development Projects.” European Journal of Operational Research 243 (1): 97–108. doi:https://doi.org/10.1016/j.ejor.2014.11.019.
- Lin, J., Y. Qian, A. Yassine, and W. Cui. 2012. “A Fuzzy Approach for Sequencing Interrelated Activities in a DSM.” International Journal of Production Research 50 (23): 7012–7025. doi:https://doi.org/10.1080/00207543.2011.648779.
- Lindhard, S., F. Hamzeh, V. Gonzalez, S. Wandahl, and L. Ussing. 2019. “Impact of Activity Sequencing on Reducing Variability.” Journal of Construction Engineering and Management 145 (3): 04019001. doi:https://doi.org/10.1061/(ASCE)CO.1943-7862.0001618.
- Liu, S., W. Cui, Y. Wu, and M. Liu. 2014. “A Survey on Information Visualization: Recent Advances and Challenges.” The Visual Computer 30 (12): 1373–1393. doi:https://doi.org/10.1007/s00371-013-0892-3.
- Lopez de la Cruz, I., A. Marshall, U. Ojiako, S. Ceylan, and F. Lin. 2020. “Innovative Approaches to Building Enterprise Risk Management in Emerging Economies: The Case of Mexico’s Grupo Proeza.” In Innovation Management and Growth in Emerging Economies, edited by H. Webb. Hershey: IGI Global.
- Luh, D., Y. Ko, and C. Ma. 2009. “A Dynamic Planning Approach for New Product Development.” Concurrent Engineering 17 (1): 43–59. doi:https://doi.org/10.1177/1063293X09102249.
- Luo, L., Q. He, J. Xie, D. Yang, and G. Wu. 2017. “Investigating the Relationship between Project Complexity and Success in Complex Construction Projects.” Journal of Management in Engineering 33 (2): 04016036. doi:https://doi.org/10.1061/(ASCE)ME.1943-5479.0000471.
- Maheswari, J., K. Varghese, and T. Sridharan. 2006. “Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects.” Journal of Construction Engineering and Management 132 (5): 482–490. doi:https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(482).
- Malone, D. 1975. “An Introduction to the Application of Interpretive Structural Modelling.” Proceedings of the IEEE 63 (3): 397–404. doi:https://doi.org/10.1109/PROC.1975.9765.
- Malone, T. W., and K. Crowston. 1994. “The Interdisciplinary Study of Coordination.” ACM Computing Surveys 26 (1): 87–119. doi:https://doi.org/10.1145/174666.174668.
- Marchand, D., W. Kettinger, and J. Rollins. 2000. “Information Orientation: People, Technology and the Bottom Line.” Sloan Management Review 42 (3): 69–80.
- Marshall, A., and S. Ceylan. 2020. Risk Intelligence Production on Complex Projects: practical Discussion Points. UK: Centre for Risk Research, University of Southampton.
- Meier, C., T. Browning, A. Yassine, and U. Walter. 2015. “The Cost of Speed: Work Policies for Crashing and Overlapping in Product Development Projects.” IEEE Transactions on Engineering Management 62 (2): 237–255. doi:https://doi.org/10.1109/TEM.2015.2411514.
- Micaelli, J., and E. Bonjour. 2011. “Are Skill Design Structure Matrices New Tools for Automotive Design Managers?” In New Trends and Developments in Automotive Industry, edited by M. Chiaberge. Rijeka: InTech.
- Mishra, A., and K. Sinha. 2016. “Work Design and Integration Glitches in Globally Distributed Technology Projects.” Production and Operations Management 25 (2): 347–369. doi:https://doi.org/10.1111/poms.12425.
- Moe, S., and J. Kaivo-Oja. 2018. “Model Theory and Observing Systems. Notes on the Use of Models in Systems Research.” Kybernetes 47 (9): 1690–1703. doi:https://doi.org/10.1108/K-01-2018-0026.
- Moradi, H., and S. Shadrokh. 2019. “A Robust Scheduling for the Multi-Mode Project Scheduling Problem with a Given Deadline under Uncertainty of Activity Duration.” International Journal of Production Research 57 (10): 3138–3167. doi:https://doi.org/10.1080/00207543.2018.1552371.
- Nelson, R., A. Azaron, and S. Aref. 2016. “The Use of a GERT Based Method to Model Concurrent Product Development Processes.” European Journal of Operational Research 250 (2): 566–578. doi:https://doi.org/10.1016/j.ejor.2015.09.040.
- Ojiako, U., and C. Chipulu. 2014. “National Culture and Success/Failure Perceptions in Projects.” Proceedings of the Institution of Civil Engineers: Management, Procurement and Law 167 (4): 167–179. doi:https://doi.org/10.1680/mpal.13.00027.
- Ojiako, U., M. Chipulu, A. Marshall, M. Ashleigh, S. Maguire, T. Williams, and L. Obokoh. 2015. “Heterogeneity and Perception Congruence of Project Outcomes.” Production Planning & Control 26 (11): 858–873. doi:https://doi.org/10.1080/09537287.2014.994684.
- Ojiako, U., T. Papadopoulos, T. Stamati, D. Anagnostopoulos, and A. Marshall. 2015. “Collaborative Governance in Greek Infrastructure Projects.” Proceedings of the Institution of Civil Engineers: Management, Procurement and Law 168 (3): 135–145. doi:https://doi.org/10.1680/mpal.1400037.
- Olaisen, J., and O. Revang. 2017. “Working Smarter and Greener: Collaborative Knowledge Sharing in Virtual Global Project Teams.” International Journal of Information Management 37 (1): 1441–1448. doi:https://doi.org/10.1016/j.ijinfomgt.2016.10.002.
- Olaniran, O. 2017. “Barriers to Tacit Knowledge Sharing in Geographically Dispersed Project Teams in Oil and Gas Projects.” Project Management Journal 48 (3): 41–57. doi:https://doi.org/10.1177/875697281704800303.
- Oloufa, A., Y. Hosni, M. Fayez, and P. Axelsson. 2004. “Using DSM for Modelling Information Flow in Construction Design Projects.” Civil Engineering and Environmental Systems 21 (2): 105–125. doi:https://doi.org/10.1080/10286600310001638474.
- Padalkar, M., and S. Gopinath. 2016. “Six Decades of Project Management Research: Thematic Trends and Future Opportunities.” International Journal of Project Management 34 (7): 1305–1321. doi:https://doi.org/10.1016/j.ijproman.2016.06.006.
- Parraguez, P., S. Eppinger, and A. Maier. 2015. “Information Flow through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach.” IEEE Transactions on Engineering Management 62 (4): 604–617. doi:https://doi.org/10.1109/TEM.2015.2469680.
- Pedrycz, W. 1994. “Why Triangular Membership Functions?” Fuzzy Sets and Systems 64 (1): 21–30. doi:https://doi.org/10.1016/0165-0114(94)90003-5.
- Pellerin, R., and N. Perrier. 2019. “A Review of Methods, Techniques and Tools for Project Planning and Control.” International Journal of Production Research 57 (7): 2160–2178. doi:https://doi.org/10.1080/00207543.2018.1524168.
- Pfeffer, J. 1972. “Merger as a Response to Organizational Interdependence.” Administrative Science Quarterly 17 (3): 382–394. doi:https://doi.org/10.2307/2392151.
- Pfeffer, J., 1987. “A Resource Dependence Perspective on Interorganizational Relations.” In Intercorporate Relations: The Structural Analysis of Business, edited by M. S. Mizruchi and M. Schwartz, 25–55. Cambridge University Press, Cambridge UK.
- Pfeffer, J. 2003. “Introduction to the Classic Edition.” In The External Control of Organizations: A Resource Dependence Perspective, edited by J. Pfeffer and G. R. Salancik. Classic ed. Stanford, CA: Stanford University Press.
- Pfeffer, J. 2005. “Developing Resource Dependence Theory: How Theory Is Affected by Its Environment.” In Great Minds in Management: The Process of Theory Development, edited by K. G. Smith and M. A. Hitt. Oxford University Press, New York.
- Piccirillo, Isabela Neto, Luis Fernando M. de Almeida, Luciano Queiroz de Araújo, and Sergio Luis da Silva. 2017. “Design Structure Matrix and Project Management: Bibliometric Analysis.” Product Management & Development 15 (2): 86–91. doi:https://doi.org/10.4322/pmd.2017.008.
- Pinto, J., and J. Prescott. 1990. “Planning and Tactical Factors in the Project Implementation Process.” Journal of Management Studies 27 (3): 305–327. doi:https://doi.org/10.1111/j.1467-6486.1990.tb00249.x.
- Pryke, S., S. Badi, H. Almadhoob, B. Soundararaj, and S. Addyman. 2018. “Self-Organizing Networks in Complex Infrastructure Projects.” Project Management Journal 49 (2): 18–41. doi:https://doi.org/10.1177/875697281804900202.
- Ramsay, J. 2005. “The Real Meaning of Value in Trading Relationships.” International Journal of Operations & Production Management 25 (6): 549–565. doi:https://doi.org/10.1108/01443570510599719.
- Roman, D. 1962. “The PERT System: An Appraisal of Program Evaluation Review Technique.” Academy of Management Journal 5 (1): 57–65. doi:https://doi.org/10.5465/254602.
- Sabeghi, N., H. Tareghian, E. Demeulemeester, and H. Taheri. 2015. “Determining the Timing of Project Control Points Using a Facility Location Model and Simulation.” Computers & Operations Research 61: 69–80. doi:https://doi.org/10.1016/j.cor.2015.03.006.
- Sarker, S., M. Ahuja, S. Sarker, and S. Kirkeby. 2011. “The Role of Communication and Trust in Global Virtual Teams: A Social Network Perspective.” Journal of Management Information Systems 28 (1): 273–310. doi:https://doi.org/10.2753/MIS0742-1222280109.
- Schatteman, D., W. Herroelen, S. Van de Vonder, and A. Boone. 2008. “Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects.” Journal of Construction Engineering and Management 134 (11): 885–893. doi:https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(885).
- Schoenherr, T., E. Bendoly, D. Bachrach, and A. Hood. 2017. “Task Interdependence Impacts on Reciprocity in IT Implementation Teams: Bringing out the Worst in Us, or Driving Responsibility?” Production and Operations Management 26 (4): 667–685. doi:https://doi.org/10.1111/poms.12671.
- Schweber, L. 2016. “Putting Theory to Work: The Use of Theory in Construction Research.” Construction Management and Economics 33 (10): 1–860. doi:https://doi.org/10.1080/01446193.2015.1133918.
- Steward, D. 1981. “The Design Structure System: A Method for Managing the Design of Complex Systems.” IEEE Transactions on Engineering Management EM-28 (3): 71–74. doi:https://doi.org/10.1109/TEM.1981.6448589.
- Sydow, J., and T. Braun. 2018. “Projects as Temporary Organizations: An Agenda for Further Theorizing the Interorganizational Dimension.” International Journal of Project Management 36 (1): 4–11. doi:https://doi.org/10.1016/j.ijproman.2017.04.012.
- Tavakolan, M., and H. Etemadinia. 2017. “Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects.” Journal of Construction Engineering and Management 143 (11): 04017084. doi:https://doi.org/10.1061/(ASCE)CO.1943-7862.0001395.
- Tribelsky, E., and R. Sacks. 2011. “An Empirical Study of Information Flows in Multidisciplinary Civil Engineering Design Teams Using Lean Measures.” Architectural Engineering and Design Management 7 (2): 85–101. doi:https://doi.org/10.1080/17452007.2011.582332.
- Uzzi, B. 1997. “Social Structure and Competition in Interfirm Networks: The Paradox of Embeddedness.” Administrative Science Quarterly 42 (1): 35–67. doi:https://doi.org/10.2307/2393808.
- Uzzi, B. 1996. “The Sources and Consequences of Embeddedness for the Economic Performance of Organizations: The Network Effect.” American Sociological Review 61 (4): 674–698. doi:https://doi.org/10.2307/2096399.
- Wang, H., X. Zhang, and W. Lu. 2018. “Improving Social Sustainability in Construction: Conceptual Framework Based on Social Network Analysis.” Journal of Management in Engineering 34 (6) : 05018012. doi:https://doi.org/10.1061/(ASCE)ME.1943-5479.0000607.
- Wang, T., W. Tang, D. Qi, W. Shen, and M. Huang. 2016. “Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies.” Journal of Construction Engineering and Management 142 (4) : 04015099. doi:https://doi.org/10.1061/(ASCE)CO.1943-7862.0001082.
- Wasserman, S., and K. Faust. 1997. Social Network Analysis: Methods and Applications. Cambridge: Cambridge University Press.
- Xu, S., and H. Luo. 2014. “The Information-Related Time Loss on Construction Sites: A Case Study on Two Sites.” International Journal of Advanced Robotic Systems 11 (8): 128. doi:https://doi.org/10.5772/58444.
- Yassine, A., and D. Braha. 2003. “Complex Concurrent Engineering and the Design Structure Matrix Method.” Concurrent Engineering 11 (3): 165–176. doi:https://doi.org/10.1177/106329303034503.
- Yassine, A. A., O. Mostafa, and T. Browning. 2017. “Scheduling Multiple, Resource-Constrained, Iterative, Product Development Projects with Genetic Algorithms.” Computers & Industrial Engineering 107: 9–56.
- Yazici, H. 2002. “The Role of Communication in Organizational Change: An Empirical Investigation.” Information & Management 39 (7): 539–552. doi:https://doi.org/10.1016/S0378-7206(01)00110-0.
- Yin, F., Q. Gao, and X. Ji. 2019. “Simulation and Optimization of Overlapped Iteration Process with Multi-Coupled Activities Based on Value Analysis.” Concurrent Engineering 27 (1): 57–67. doi:https://doi.org/10.1177/1063293X18806336.
- Zadeh, L. 1965. “Fuzzy Sets.” Information and Control 8 (3): 338–353. doi:https://doi.org/10.1016/S0019-9958(65)90241-X.
- Zadeh, L. 1999. “Some Reflections on the Anniversary of Fuzzy Sets and Systems.” Fuzzy Sets and Systems 100: 1–3. doi:https://doi.org/10.1016/S0165-0114(99)80002-5.
- Zammori, F., M. Braglia, and M. Frosolini. 2009. “A Fuzzy Multi-Criteria Approach for Critical Path Definition.” International Journal of Project Management 27 (3): 278–291. doi:https://doi.org/10.1016/j.ijproman.2008.03.006.
- Zhao, W., N. Hall, and Z. Liu. 2020. “Project Evaluation and Selection with Task Failures.” Production and Operations Management 29 (2): 428–446. doi:https://doi.org/10.1111/poms.13107.