Publication Cover
Production Planning & Control
The Management of Operations
Volume 33, 2022 - Issue 11
832
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Organisational culture in lean construction: managing paradoxes and dilemmas

ORCID Icon & ORCID Icon
Pages 1078-1096 | Received 11 Jun 2019, Accepted 22 Oct 2020, Published online: 15 Nov 2020

References

  • Adler, P. S., B. Goldoftas, and D. I. Levine. 1999. “Flexibility versus Efficiency? A Case Study of Model Changeovers in the Toyota Production System.” Organization Science 10 (1): 43–68.
  • Alves, J. R. X., and J. M. Alves. 2015. “Production Management Model Integrating the Principles of Lean Manufacturing and Sustainability Supported by the Cultural Transformation of a Company.” International Journal of Production Research 53 (17): 5320–5333.
  • Aoki, K., and M. Wilhelm. 2017. “The Role of Ambidexterity in Managing Buyer–Supplier Relationships: The Toyota Case.” Organization Science 28 (6): 1080–1097.
  • Arellano, M. C., C. Sancha, T. Netland, and C. G. Thomsen. 2020. “Manufacturing Network Integration and Culture: An Institution-Based View.” Journal of Manufacturing Technology Management.doi:https://doi.org/10.1108/JMTM-09-2019-0357.
  • Babalola, O., I. Eziyi, and C. E. Isidore. 2019. “Implementation of Lean Practices in the Construction Industry: A Systematic Review.” Building and Environment 148: 34–43.
  • Belay, A. M., T. Welo, and P. Helo. 2014. “Approaching Lean Product Development Using System Dynamics: Investigating Front-Load Effects.” Advances in Manufacturing 2 (2): 130–140.
  • Biazzo, S. 2009. “Flexibility, Structuration, and Simultaneity in New Product Development.” Journal of Product Innovation Management 26 (3): 336–353.
  • Bortolotti, T., S. Boscari, and P. Danese. 2015. “Successful Lean Implementation: Organizational Culture and Soft Lean Practices.” International Journal of Production Economics 160: 182–201.
  • Boscari, S., P. Danese, and P. Romano. 2016. “Implementation of Lean Production in Multinational Corporations: A Case Study of the Transfer Process from Headquarters to Subsidiaries.” International Journal of Production Economics 176: 53–68.
  • Boyer, K. K., and M. W. Lewis. 2009. “Competitive Priorities: Investigating the Need for Trade-Offs in Operations Strategy.” Production and Operations Management 11 (1): 9–20.
  • Boyer, K. K., and M. Pagell. 2000. “Measurement Issues in Empirical Research: Improving Measures of Operations Strategy and Advanced Manufacturing Technology.” Journal of Operations Management 18 (3): 361–374.
  • Brunet-Thornton, R., M. Koža, and V. Bureš. 2016. “The Toyota Production System – Czech and Nippon Cultural Perspectives.” Ekonomie a Management 19 (2): 142–156. doi:https://doi.org/10.15240/tul/001/2016-2-010.
  • Cagliano, R., F. Caniato, R. Golini, A. Longoni, and E. Micelotta. 2011. “The Impact of Country Culture on the Adoption of New Forms of Work Organization.” International Journal of Operations & Production Management 31 (3): 297–323.
  • Caldas, M. P. 1997. “Santo de Casa Não Faz Milagre: Condicionantes Nacionais e Implicações Organizacionais da Fixação Brasileira Pela Figura Do Estrangeiro.” In Cultura Organizacional e Cultura Brasileira, edited by F. C. P. Motta and M. P. Caldas, 73–93. São Paulo: Atlas.
  • Cameron, K. S. 1986. “Effectiveness as Paradox: Consensus and Conflict in Conceptions of Organizational Effectiveness.” Management Science 32 (5): 539–553.
  • Chuang, M., J. J. Donegan, M. W. Ganon, and K. Wei. 2011. “Walmart and Carrefour Experiences in China: Resolving the Structural Paradox.” Cross Cultural Management: An International Journal 18 (4): 443–463.
  • Crofton, C. G., and B. G. Dale. 1996. “The Difficulties Encountered in the Introduction of Total Quality Management: A Case Study Examination.” Quality Engineering 8 (3): 433–439.
  • Da Silveira, G., and N. Slack. 2001. “Exploring the Trade-off Concept.” International Journal of Operations & Production Management 21 (7): 949–964.
  • De Hilal, A. V. G., U. Wetzel, and V. Ferreira. 2009. “Organizational Culture and Performance: A Brazilian Case.” Management Research News 32 (2): 99–119.
  • Demirkesen, S. 2020. “Measuring Impact of Lean Implementation on Construction Safety Performance: A Structural Equation Model.” Production Planning & Control 31 (5): 412–433. doi:https://doi.org/10.1080/09537287.2019.1675914.
  • Denison, D., L. Nieminen, and L. Kotrba. 2014. “Diagnosing Organizational Cultures: A Conceptual and Empirical Review of Culture Effectiveness Surveys.” European Journal of Work and Organizational Psychology 23 (1): 145–161.
  • Detert, James R., Roger G. Schroeder, and John J. Mauriel. 2000. “A Framework for Linking Culture and Improvement Initiatives in Organizations.” Academy of Management Review 25 (4): 850–863.
  • Dorval, M., M.-H. Jobin, and N. Benomar. 2019. “Lean Culture: A Comprehensive Systematic Literature Review.” International Journal of Productivity and Performance Management 68 (5) : 920–937.
  • Dorval, M., and M.-H. Jobin. 2019. “Exploring Lean Generic and Lean Healthcare Cultural Clusters.” International Journal of Productivity and Performance Management 69 (4): 723–740.
  • Dumit, A., D. G. Fernández, P. Neise, K. Nobels, N. Santos, and M. Sullivan. 2012. “Large-scale Infrastructure Projects Can Benefit Greatly from Tried-And-True Lean Manufacturing Techniques.” Accessed 20 October 2018. https://www.mckinsey.com/∼/media/McKinsey/Business%20Functions/Operations/Our%20Insights/Lean%20construction/20120605_Lean_construction.ashx.
  • Edmondson, A. C., and S. E. Mcmanus. 2007. “Methodological Fit in Management Field Research.” Academy of Management Review 32 (4): 1179–1246.
  • Eisenhardt, K. M., and M. E. Graebner. 2007. “Theory Building from Cases: Opportunities and Challenges.” Academy of Management Journal 50 (1): 25–32.
  • Eisenhardt, K. M., and B. J. Westcott. 1988. “Paradoxical Demands and the Creation of Excellence: The Case of Just-In-Time Manufacturing.” In Paradox and Transformation: Toward a Theory of Change in Organization and Management, edited by R. Quinn and K. Cameron, 169–193. Cambridge: Ballinger.
  • Erthal, A., and L. Marques. 2018. “National Culture and Organizational Culture in Lean Organizations: A Systematic Review.” Production Planning & Control 29 (8): 668–687.
  • Ford, D. N., and D. K. Sobek II. 2005. “Adapting Real Options to New Product Development by Modeling the Second Toyota Paradox.” IEEE Transactions on Engineering Management 52 (2): 175–185.
  • Hadid, W. 2019. “Lean Service, Business Strategy and ABC and Their Impact on Firm Performance.” Production Planning & Control 30 (14): 1203–1217.
  • Hess, D., and R. Da Matta. 1995. The Brazilian Puzzle: Culture on the Borderlands of the Western World. New York, NY: Columbia University Press.
  • Hofstede, G., G. A. Hofstede, and M. Minkov. 2010. Cultures and Organizations: Software of the Mind. London: McGraw–Hill.
  • Hofstede, G., B. Neuijen, D. D. Ohayv, and G. Sanders. 1990. “Measuring Organizational Cultures: A Qualitative and Quantitative Study across Twenty Cases.” Administrative Science Quarterly 35 (2): 286–316.
  • Holmemo, M. D. Q., M. Rolfsen, and J. A. Ingvaldsen. 2018. “Lean Thinking: Outside-in, Bottom-Up? The Paradox of Contemporary Soft Lean and Consultant-Driven Lean Implementation.” Total Quality Management & Business Excellence 29 (1-2): 148–160. doi:https://doi.org/10.1080/14783363.2016.1171705.
  • Hum, S., and L. Leow. 1996. “Strategic Manufacturing Effectiveness.” International Journal of Operations & Production Management 16 (4): 4–18.
  • Hurley, R. F., and T. M. Hult. 1998. “Innovation, Market Orientation, and Organizational Learning: An Integration and Empirical Examination.” Journal of Marketing 62 (3): 42–54.
  • Jarnagin, C., and J. W. Slocum. 2007. “Creating Corporate Cultures through Mythopoetic Leadership.” Organizational Dynamics 36 (3): 288–302.
  • Juliani, F., and O. J. de Oliveira. 2020. “Lean Six Sigma Principles and Practices under a Management Perspective.” Production Planning & Control 31 (15): 1223–1244. doi:https://doi.org/10.1080/09537287.2019.1702225.
  • Ke, W., and K. K. Wei. 2008. “Organizational Culture and Leadership in ERP Implementation.” Decision Support Systems 45 (2): 208–218.
  • Ketokivi, M., and T. Choi. 2014. “Renaissance of Case Research as a Scientific Method.” Journal of Operations Management 32 (5): 232–240.
  • Lantz, A., N. Hansen, and C. Antoni. 2015. “Participative Work Design in Lean Production.” Journal of Workplace Learning 27 (1): 19–33.
  • Lewis, M. 2000. “Exploring Paradox: Toward a More Comprehensive Guide.” Academy of Management Review 25 (4): 760–776.
  • Liker, J. K. 2004. The Toyota Way. New York, NY: McGraw-Hill.
  • Liker, J. K., and J. M. Morgan. 2006. “The Toyota Way in Services: The Case of Lean Product Development.” Academy of Management Perspectives 20 (2): 5–20.
  • Love, P. E. D., J. Smith, F. Ackermann, Z. Irani, W. Fang, H. Luo, and L. Ding. 2019. “Houston, We Have a Problem! Understanding the Tensions between Quality and Safety in Construction.” Production Planning & Control, Published Online 30 (16): 1354–1365. doi:https://doi.org/10.1080/09537287.2019.1617908.
  • Lüscher, L., and M. W. Lewis. 2008. “Organizational Change and Managerial Sensemaking: Working through Paradox.” Academy of Management Journal 51 (2): 221–240.
  • Maalouf, M., and B. Gammelgaard. 2016. “Managing Paradoxical Tensions during the Implementation of Lean Capabilities for Improvement.” International Journal of Operations & Production Management 36 (6): 687–709.
  • Malak, R. J., Jr, J. M. Aughenbaugh, and C. J. J. Paredis. 2009. “Multi-Attribute Utility Analysis in Set-Based Conceptual Design.” Computer-Aided Design 41 (3): 214–227.
  • Malmbrandt, M., and P. Åhlström. 2013. “An Instrument for Assessing Lean Service Adoption.” International Journal of Operations & Production Management 33 (9): 1131–1165.
  • Mano, A. P., S. E. G. da Costa, and E. P. de Lima. 2020. “Criticality Assessment of the Barriers to Lean Construction.” International Journal of Productivity and Performance Management. doi:https://doi.org/10.1108/IJPPM-11-2018-0413.
  • Martínez-Jurado, P. J., and J. Moyano-Fuentes. 2014. “Key Determinants of Lean Production Adoption: Evidence from the Aerospace Sector.” Production Planning & Control 25 (4): 332–345.
  • Mehri, D. 2006. “The Darker Side of Lean: An Insider’s Perspective on the Realities of the Toyota Production System.” Academy of Management Perspectives 20 (2): 21–42.
  • Meng, X. 2019. “Lean Management in the Context of Construction Supply Chains.” International Journal of Production Research 57 (11): 3784–3798.
  • Miron-Spektor, E., A. Ingram, J. Keller, W. K. Smith, and M. W. Lewis. 2018. “Microfoundations of Organizational Paradox: The Problem is How we Think about the Problem.” Academy of Management Journal 61 (1): 26–45. doi:https://doi.org/10.5465/amj.2016.0594.
  • Moher, D., A. Liberati, J. Tetzlaff, and D. G. Altman. 2009. “Preferred Reporting Items for Systematic Reviews and Meta-Analyses: The PRISMA Statement.” PLoS Medicine 6 (7): e1000097 doi:https://doi.org/10.1371/journal.pmed.1000097.
  • Mooney, A. C., P. J. Holahan, and A. C. Amason. 2007. “Don’t Take It Personally: Exploring Cognitive Conflict as a Mediator of Affective Conflict.” Journal of Management Studies 44 (5): 733–758. doi:https://doi.org/10.1111/j.1467-6486.2006.00674.x.
  • Pagell, M., R. Klassen, D. Johnston, A. Shevchenko, and S. Sharma. 2015. “Are Safety and Operational Effectiveness Contradictory Requirements: The Roles of Routines and Relational Coordination.” Journal of Operations Management 36 (1): 1–14.
  • Peltokorpi, V. 2008. “Synthesising the Paradox of Organizational Routine Flexibility and Stability: A Processual View.” International Journal of Technology Management 41 (1/2): 7–21.
  • Pereira, R., Y. K. Ro, and J. K. Liker. 2014. “Product Development and Failures in Learning from Best Practices in U.S. Auto: A Supplier Perspective.” IEEE Transactions on Engineering Management 61 (3): 545–556.
  • Poole, M. S., and A. H. van de Ven. 1989. “Using Paradox to Build Management and Organization Theories.” Academy of Management Review 14 (4): 562–578.
  • Primo, M. A. M., F. L. DuBois, M. L. M. C. de Oliveira, E. S. D. Amaro, and D. D. N. Moser. 2020. “Lean Manufacturing Implementation in Time of Crisis: The Case of Estaleiro Atlântico Sul.” Production Planning & Control. 1–18. doi:https://doi.org/10.1080/09537287.2020.1747655.
  • Qamar, A., M. A. Hall, D. Chicksand, and S. Collinson. 2020. “Quality and Flexibility Performance Trade-Offs between Lean and Agile Manufacturing Firms in the Automotive Industry.” Production Planning & Control 31 (9): 723–738. doi:https://doi.org/10.1080/09537287.2019.1681534.
  • Quinn, R. E., and J. Rohrbaugh. 1983. “A Spatial Model of Effectiveness Criteria: Towards a Competing Values Approach to Organizational Analysis.” Management Science 29 (3): 363–377.
  • Reynolds, P. D. 1986. “Organizational Culture as Related to Industry, Position and Performance: A Preliminary Report.” Journal of Management Studies 23 (3): 333–345.
  • Rothenberg, S. 2003. “Knowledge Content and Worker Participation in Environmental Management at NUMM.” Journal of Management Studies 40 (7): 1783–1802.
  • Sacks, R., M. Radosavljevic, and R. Barak. 2010. “Requirements for Building Information Modeling Based Lean Production Management Systems for Construction.” Automation in Construction 19 (5): 641–655.
  • Sage, D., A. Dainty, and N. Brookes. 2012. “A ‘Strategy-As-Practice’ Exploration of Lean Construction Strategizing.” Building Research & Information 40 (2): 221–230.
  • Saldaña, J. 2009. The Coding Manual for Qualitative Researchers. London: SAGE Publications.
  • Salem, O., J. Solomon, A. Genaidy, and I. Minkarah. 2006. “Lean Construction: From Theory to Implementation.” Journal of Management in Engineering 22 (4): 168–175.
  • Schein, E. H. 1984. “Coming to a New Awareness of Organizational Culture.” Sloan Management Review 25 (2): 3.
  • Schein, E. H. 1985. Organizational Culture and Leadership: A Dynamic View. San Francisco: Jossey-Bass.
  • Schnatterly, K., K. A. Gangloff, and A. Tuschke. 2018. “CEO Wrongdoing: A Review of Pressure, Opportunity, and Rationalization.” Journal of Management 44 (6): 2405–2432.
  • Schneider, B., M. G. Ehrhart, and W. H. Macey. 2013. “Organizational Climate and culture.” Annual Review of Psychology 64: 361–388. doi:https://doi.org/10.1146/annurev-psych-113011-143809.
  • Shah, R., and P. T. War. 2007. “Defining and Developing Measures of Lean Production.” Journal of Operations Management 25 (4): 785–805.
  • Sinkovics, R. R., and E. Alfoldi. 2012. “Progressive Focusing and Trustworthiness in Qualitative Research: The Enabling Role of Computer-Assisted Qualitative Data Analysis Software (CAQDAS).” Management International Review 52 (6): 817–845.
  • Slack, N., S. Chambers, and R. Johnston. 1995. Operations Management. Warwick: Pitman.
  • Smircich, L. 1983. “Concepts of Culture and Organizational Analysis.” Administrative Science Quarterly 28 (3): 339–358.
  • Smith, W. K., and M. W. Lewis. 2011. “Toward a Theory of Paradox: A Dynamic Equilibrium Model of Organizing.” Academy of Management Review 36 (2): 381–403.
  • Soliman, M., and, T. A. Saurin. 2017. “Lean Production in Complex Socio-Technical Systems: A Systematic Literature Review.” Journal of Manufacturing Systems 45: 135–148. doi:https://doi.org/10.1016/j.jmsy.2017.09.002.
  • Spear, S., and H. K. Bowen. 1999. “Decoding the DNA of the Toyota Production System.” Harvard Business Review 77 (5): 96–106.
  • Stake, R. E. 1995. The Art of Case Study Research. London: SAGE Publications.
  • Stentoft, J., and P. V. Freytag. 2020. “Improvement Culture in the Public Mental Healthcare Sector: Evaluation of Implementation Efforts.” Production Planning & Control 31 (7): 540–556.
  • Tezel, A., L. Koskela, and Z. Aziz. 2017. “Lean Thinking in the Highways Construction Sector: Motivation, Implementation and Barriers.” Production Planning & Control 29 (3): 247–269.
  • van Assen, M. F. 2018a. “The Moderating Effect of Management Behavior for Lean and Process Improvement.” Operations Management Research 11 (1–2): 1–13.
  • van Assen, M. F. 2018b. “Exploring the Impact of Higher Management’s Leadership Styles on Lean Management.” Total Quality Management & Business Excellence 29 (11–12): 1312–1341.
  • van Dun, D. H., and C. P. M. Wilderom. 2016. “Lean-Team Effectiveness through Leader Values and Members’ Informing.” International Journal of Operations & Production Management 36 (11): 1530–1550.
  • Ward, A., J. K. Liker, J. J. Cristiano, and D. K. Sobek. II, 1995. “The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster.” Sloan Management Review 36 (3): 43–61.
  • Wiengarten, F., C. Gimenez, B. Fynes, and K. Ferdows. 2015. “Exploring the Importance of Cultural Collectivism on the Efficacy of Lean Practices.” International Journal of Operations & Production Management 35 (3): 370–391.
  • Womack, J. P., and D. T. Jones. 1996. Lean Thinking. New York, NY: Simon and Schuster.
  • Womack, J. P., D. T. Jones, and D. Ross. 1990. The Machine That Changed the World. Rawson Associates, New York.
  • Yin, R. K. 2009. Case Study Research: Design and Methods. Thousand Oaks, CA: SAGE Publications.
  • Yoon, S. J., and Y. J. Chae. 2012. “Management of Paradox: A Comparative Study of Managerial Practices in Korean and Japanese Firms.” The International Journal of Human Resource Management 23 (17): 3501–3521.
  • Zammuto, Raymond F., and Edward J. O’Connor. 1992. “Gaining Advanced Manufacturing Technologies' Benefits: The Roles of Organization Design and Culture.” Academy of Management Review 17 (4): 701–728. doi:https://doi.org/10.5465/amr.1992.4279062.
  • Zegarra, O., and L. F. Alarcón. 2019. “Coordination of Teams, Meetings, and Managerial Processes in Construction Projects: using a Lean and Complex Adaptive Mechanism.” Production Planning & Control 30 (9): 736–763. doi:https://doi.org/10.1080/09537287.2019.1578905.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.