Publication Cover
Production Planning & Control
The Management of Operations
Volume 34, 2023 - Issue 15
2,191
Views
7
CrossRef citations to date
0
Altmetric
Research Articles

A lean construction and BIM interaction model for the construction industry

, ORCID Icon, & ORCID Icon
Pages 1447-1474 | Received 10 Nov 2020, Accepted 10 Dec 2021, Published online: 03 Jan 2022

References

  • Abdelhamid, T. S., and J. G. Everett. 2002. “Physical Demands of Construction Work: A Source of Workflow Unreliability.” Proceedings of the 10th Conference of International Group for Lean Construction.
  • Adam, M., M. Hofbauer, and M. Stehling. 2020. “Effectiveness of a Lean Simulation Training: challenges, Measures and Recommendations.” Production Planning & Control 32 (6): 443–453.
  • Ahuja, R., A. Sawhney, and M. Arif. 2017. “Driving Lean and Green Project Outcomes Using BIM: A Qualitative Comparative Analysis.” International Journal of Sustainable Built Environment 6 (1): 69–80. doi:10.1016/j.ijsbe.2016.10.006.
  • Akinade, O. O., L. O. Oyedele, M. Bilal, S. O. Ajayi, H. A. Owolabi, H. A. Alaka, and S. A. Bello. 2015. “Waste Minimization through Deconstruction: A BIM-Based Deconstructability Assessment Score (BIM-DAS).” Resources, Conservation and Recycling 105: 167–176. doi:10.1016/j.resconrec.2015.10.018.
  • Al Hattab, M., and F. Hamzeh. 2015. “Using Social Network Theory and Simulation to Compare Traditional versus BIM–Lean Practice for Design Error Management.” Automation in Construction 52: 59–69. doi:10.1016/j.autcon.2015.02.014.
  • Al Hattab, M., and F. Hamzeh. 2018. “Simulating the Dynamics of Social Agents and Information Flows in BIM-Based Design.” Automation in Construction 92: 1–22. doi:10.1016/j.autcon.2018.03.024.
  • Alarcón, L. F., H. Mesa, and G. Howell. 2013. “Characterization of Lean Project Delivery.” Proc. 21st Ann. Conf. of the Int’l Group for Lean Construction.
  • Alarcón, L., R. Mandujano, G. Maria, and C. Mourgues. 2013. “Analysis of the Implementation of VDC from a Lean Perspective: Literature Review.” In 21th Annual Conference of the International Group for Lean Construction, edited by C. T. Formoso and P. Tzortzopoulos, 781–790. Fortaleza.
  • Alshawi, M., and B. Ingirige. 2003. “Web-Enabled Project Management: An Emerging Paradigm in Construction.” Automation in Construction 12 (4): 349–364. doi:10.1016/S0926-5805(03)00003-7.
  • Andi, Minato. T. 2004. “Representing Causal Mechanism of Defective Designs: exploration through Case Studies.” Construction Management and Economics 22 (2): 183–192.
  • Andújar-Montoya, M. D., V. Gilart-Iglesias, A. Montoyo, and D. Marcos-Jorquera. 2015. “A Construction Management Framework for Mass Customisation in Traditional Construction.” Sustainability 7 (5): 5182–5210. doi:10.3390/su7055182.
  • Andújar-Montoya, M. D., A. Galiano-Garrigós, C. Rizo-Maestre, and V. Echarri-Iribarren. 2019. “BIM and Lean Construction Interactions: A State-of-the-Art Review.” WIT Transactions on the Built Environment 192: 1–13. doi:10.2495/BIM190011.
  • Andújar-Montoya, M. D., A. Galiano-Garrigós, V. Echarri-Iribarren, and C. Rizo-Maestre. 2020. “BIM-LEAN as a Methodology to save Execution Costs in Building Construction—An Experience under the Spanish Framework.” Applied Sciences 10 (6): 1913. doi:10.3390/app10061913.
  • Ansah, R. H., S. Sorooshian, S. B. Mustafa, and G. Duvvuru. 2016. “Lean Construction Tools.” Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, Detroit, MI, USA.
  • Aouad, G., and Y. Arayici. 2009. Requirements Engineering for Computer Integrated Environments in Construction. Oxford, UK: John Wiley & Sons.
  • Arayici, Y., and P. Coates. 2012. “A System Engineering Perspective to Knowledge Transfer: A Case Study Approach of BIM Adoption.” Virtual Reality–Human Computer Interaction 2006: 179–206.
  • Arayici, Y., P. Coates, L. Koskela, M. Kagioglou, C. Usher, and K. O’Reilly. 2011. “Technology Adoption in the BIM Implementation for Lean Architectural Practice.” Automation in Construction 20 (2): 189–195. doi:10.1016/j.autcon.2010.09.016.
  • Ashford, J. L. 2002. The Management of Quality in Construction. Routledge.
  • Aslam, M., Z. Gao, and G. Smith. 2020. “Framework for Selection of Lean Construction Tools Based on Lean Objectives and Functionalities.” International Journal of Construction Management : 1–12. doi:10.1080/15623599.2020.1729933.
  • Azhar, S., A. Nadeem, J. Y. Mok, and B. H. Leung. 2008. “Building Information Modeling (BIM): a New Paradigm for Visual Interactive Modeling and Simulation for Construction Projects.” Proc. First International Conference on Construction in Developing Countries, Vol. 1, 435–446.
  • Azhar, S. 2011. “Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry.” Leadership and Management in Engineering 11 (3): 241–252. doi:10.1061/(ASCE)LM.1943-5630.0000127.
  • Azhar, S., M. Khalfan, and T. Maqsood. 2015. “Building Information Modelling (BIM): Now and Beyond.” Construction Economics and Building 12 (4): 15–28. doi:10.5130/AJCEB.v12i4.3032.
  • Aziz, R. F., and S. M. Hafez. 2013. “Applying Lean Thinking in Construction and Performance Improvement.” Alexandria Engineering Journal 52 (4): 679–695. doi:10.1016/j.aej.2013.04.008.
  • Babalola, O., E. O. Ibem, I. C. Ezema, and A. O. Olanipekun. 2019. “Assessment of the role of lean construction practices in environmental sustainability.” In Journal of Physics: Conference Series 1299(1): 012002. IOP Publishing. doi:10.1088/1742-6596/1299/1/012002.
  • Bademosi, F., and R. R. Issa. 2021. “Factors Influencing Adoption and Integration of Construction Robotics and Automation Technology in the US.” Journal of Construction Engineering and Management 147 (8): 04021075. doi:10.1061/(ASCE)CO.1943-7862.0002103.
  • Ballard, G. 2000b. “Positive vs Negative Iteration in Design.” Proceedings Eighth Annual Conference of the International Group for Lean Construction, IGLC-6, Brighton, UK, 17–19.
  • Ballard, G., and G. Howell. 2003. “An Update on Last Planner.” Proc. 11th Annual Conf. International Group for Lean Construction, Blacksburg, VA.
  • Ballard, G., and P. Reiser. 2004. “The St. Olaf College Fieldhouse Project: A Case Study in Designing to Target Cost.” 12th Annual Conference of the International Group for Lean Construction, 234–249.
  • Ballard, G., and I. Tommelein. 2016. “Current Process Benchmark for the Last Planner System.” Lean Construction Journal 89: 57–89.
  • Ballard, G., and T. Zabelle. 2000. “Lean Design: Process, Tools, and Techniques.” White Paper 10: 1–15.
  • Ballard, H. G. 2000a. “The Last Planner System of Production Control.” (Doctoral diss., University of Birmingham).
  • Ballard, H. G., and P. H. Morris. 2010. “Maximizing Owner Value through Target Value Design.” AACE International Transactions 1 (1): 1–16. Retrieved from http://connection.ebscohost.com/c/articles/52475948/maximizing-owner-value-through-target-value-design
  • Bartolini, M., E. Bottani, and E. H. Grosse. 2019. “Green warehousing: Systematic literature review and bibliometric analysis.” Journal of Cleaner Production 226: 242–258. doi:10.1016/j.jclepro.2019.04.055.
  • Barista, D. 2007. “BIM for Healthcare: Early adopters of building information modeling technology are seeing great benefits when designing and building hospitals.” Accessed 15 May 2020 from Building Design + Construction http://www.bdcnetwork.com/article/CA6417654.htm
  • Bashir, A. M., S. Suresh, D. A. Oloke, D. G. Proverbs, and R. Gameson. 2015. “Overcoming the Challenges Facing Lean Construction Practice in the UK Contracting Organizations.” International Journal of Architecture, Engineering and Construction 4 (1): 10–18. doi:10.7492/IJAEC.2015.002.
  • Belton, V., and T. J. Stewart. 2002. “Outranking Methods.” In: Multiple Criteria Decision Analysis, 233–259. Boston, MA: Springer.
  • Berlak, J., S. Hafner, and V. G. Kuppelwieser. 2020. “Digitalization’s Impacts on Productivity: A Model-Based Approach and Evaluation in Germany’s Building Construction Industry.” Production Planning & Control 32 (4): 335–345.
  • Bertelsen, S. 2004. “Lean Construction: Where Are we and How to Proceed.” Lean Construction Journal 1 (1): 46–69.
  • Boakye-Adjei, K., R. Thamma, and E. D. Kirby. 2014. “Autonomation: The Future of Manufacturing.” Proceedings of the 2014 IAJC-ISAM International Conference, Orlando, FL, 978–1.
  • Boje, D. M., and J. K. Murnighan. 1982. “Group Confidence Pressures in Iterative Decisions.” Management Science 28 (10): 1187–1196. doi:10.1287/mnsc.28.10.1187.
  • Boothroyd, G. 1994. “Product Design for Manufacture and Assembly.” Computer-Aided Design 26 (7): 505–520. doi:10.1016/0010-4485(94)90082-5.
  • Bortolini, R., C. T. Formoso, and D. D. Viana. 2019. “Site Logistics Planning and Control for Engineer-to-Order Prefabricated Building Systems Using BIM 4D Modeling.” Automation in Construction 98: 248–264. doi:10.1016/j.autcon.2018.11.031.
  • Braglia, M., P. Dallasega, and L. Marrazzini. 2020. “Overall Construction Productivity: A New Lean Metric to Identify Construction Losses and Analyse Their Causes in Engineer-to-Order Construction Supply Chains.” Production Planning & Control 1–18.
  • Bråthen, K. 2015. “Collaboration with BIM-Learning from the Front Runners in the Norwegian Industry.” Procedia Economics and Finance 21: 439–445. doi:10.1016/S2212-5671(15)00197-5.
  • Bråthen, K., and A. Moum. 2016. “Bridging the Gap: bringing BIM to Construction Workers.” Engineering, Construction and Architectural Management 23 (6): 751–764. doi:10.1108/ECAM-01-2016-0008.
  • Bu-Qammaz, A. S., I. Dikmen, and M.T. Birgonul. 2009. “Risk assessment of international construction projects using the analytic network process.” Canadian Journal of Civil Engineering 36 (7): 1170–1181. doi: 10.1139/L09-061.
  • Bygballe, L. E., M. Endresen, and S. Fålun. 2018. “The Role of Formal and Informal Mechanisms in Implementing Lean Principles in Construction Projects.” Engineering, Construction and Architectural Management 25 (10): 1322–1338. doi:10.1108/ECAM-07-2017-0138.
  • Calderon-Hernandez, C., and X. Brioso. 2018. “Lean, BIM and Augmented Reality Applied in the Design and Construction Phase: A Literature Review.” International Journal of Innovation, Management and Technology 9 (1): 60–63.
  • Castillo, G., L. F. Alarcón, and V. A. González. 2015. “Implementing Lean Production in Copper Mining Development Projects: Case Study.” Journal of Construction Engineering and Management 141 (1): 05014013. doi:10.1061/(ASCE)CO.1943-7862.0000917.
  • Chan, A. P., E. H. Yung, P. T. Lam, C. M. Tam, and S. Cheung. 2001. “Application of Delphi Method in Selection of Procurement Systems for Construction Projects.” Construction Management and Economics 19 (7): 699–718. doi:10.1080/01446190110066128.
  • Chandrasekaran, B., and M. Goldman. 2007. “Exploring Robustness of Plans for Simulation- Based Course of Action Planning: A Framework and an Example.” Proceedings of the IEEE Symposium on Computational Intelligence in Multicriteria Decision Making, 185–192.
  • Chemweno, P., L. Pintelon, A. Van Horenbeek, and P. Muchiri. 2015. “Development of a Risk Assessment Selection Methodology for Asset Maintenance Decision Making: An Analytic Network Process (ANP) Approach.” International Journal of Production Economics 170: 663–676. doi:10.1016/j.ijpe.2015.03.017.
  • Cheng, J. C., J. Won, and M. Das. 2015. “Construction and Demolition Waste Management Using BIM Technology.” 23rd Annual Conference of the International Group for Lean Construction, Perth, Australia, 381–390.
  • Cheng, E. W., and H. Li. 2005. “Analytic network process applied to project selection.” Journal of Construction Engineering and Management 131 (4): 459–466. doi:10.1061/(ASCE)07339364(2005)131:4(459).
  • Cil, I., and Y. S. Turkan. 2013. “An ANP-Based Assessment Model for Lean Enterprise Transformation.” The International Journal of Advanced Manufacturing Technology 64 (5–8): 1113–1130. doi:10.1007/s00170-012-4047-x.
  • Cinelli, M., S. R. Coles, and K. Kirwan. 2014. “Analysis of the Potentials of Multi Criteria Decision Analysis Methods to Conduct Sustainability Assessment.” Ecological Indicators 46: 138–148. doi:10.1016/j.ecolind.2014.06.011.
  • Ciribini, A. L. C., S. M. Ventura, and M. Paneroni. 2016. “Implementation of an Interoperable Process to Optimise Design and Construction Phases of a Residential Building: A BIM Pilot Project.” Automation in Construction 71: 62–73. doi:10.1016/j.autcon.2016.03.005.
  • Cooper, R. 1997. Target Costing and Value Engineering. Routledge.
  • Cooper, R. G. 2003. “Profitable Product Innovation: The Critical Success Factors.” In International Handbook on Innovation, 139–157. Oxford: Elsevier.
  • Coates, P., Y. Arayici, L. Koskela, and C. Usher. 2010. “The Changing Perception in the Artefacts used in the Design Practice through BIM Adoption.” CIB 2010 World Congress Proceedings, University of Salford, UK, 1037.
  • Dallasega, P., A. Revolti, P. C. Sauer, F. Schulze, and E. Rauch. 2020. “BIM, Augmented and Virtual Reality Empowering Lean Construction Management: A Project Simulation Game.” Procedia Manufacturing 45: 49–54. doi:10.1016/j.promfg.2020.04.059.
  • Dalkey, N., B. Brown, and S. Cochran. 1970. “Use of Self-Ratings to Improve Group Estimates: Experimental Evaluation of Delphi Procedures.” Technological Forecasting 1 (3): 283–291. doi:10.1016/0099-3964(70)90029-3.
  • Danforth, E. M., J. E. Weidman, and C. B. Farnsworth. 2017. “Strategies Employed and Lessons Learned by Commercial Construction Companies during Economic Recession and Recovery.” Journal of Construction Engineering and Management 143 (7): 04017027. doi:10.1061/(ASCE)CO.1943-7862.0001310.
  • Dave, B., S. Boddy, and L. Koskela. 2011. “VisiLean: Designing a Production Management System with Lean and BIM.” 19th Annual Conference of the International Group for Lean Construction, 477–487. International Group for Lean Construction (IGLC).
  • Dave, B., L. Koskela, A. Kiviniemi, R. L. Owen, and P. Tzortzopoulis Fazenda. 2013. Implementing Lean in construction: Lean construction and BIM-CIRIA Guide C725.
  • Dave, B., S. Kubler, K. Främling, and L. Koskela. 2014. Addressing Information Flow in Lean Production Management and Control in Construction. International Group for Lean Construction.
  • Dave, B., S. Kubler, K. Främling, and L. Koskela. 2016. “Opportunities for Enhanced Lean Construction Management Using Internet of Things Standards.” Automation in Construction 61: 86–97. doi:10.1016/j.autcon.2015.10.009.
  • Demirkesen, S., and H. G. Bayhan. 2020. “A Lean Implementation Success Model for the Construction Industry.” Engineering Management Journal 32 (3): 219–239.
  • Demirkesen, S., and A. Tezel. 2021. “Investigating Major Challenges for Industry 4.0 Adoption among U.S.” Engineering, Construction and Architectural Management. doi:10.1108/ECAM-12-2020-1059.
  • Deniz, G. O. 2017. An analytic network process (ANP) model to examine LEED-certified buildings’ operational performance. Built Environment Project and Asset Management.
  • Dikmen, I., M. T. Birgonul, B. Ozorhon, and N. Egilmezer-Sapci. 2010. “Using analytic network process to assess business failure risks of construction firms.” Engineering Construction and Architectectural Managegement 17(4): 369–386. doi:10.1108/09699981011056574.
  • Dong, N. T., A. Khanzode, and H. Lindberg. 2013. “Applying Lean Principles, BIM, and Quality Control to a Construction Supply Chain Management System.” Proceedings of the 30th CIB W78 International Conference, 535–544.
  • Doumbouya, L., G. Gao, and C. Guan. 2016. “Adoption of the Building Information Modeling (BIM) for Construction Project Effectiveness: The Review of BIM Benefits.” American Journal of Civil Engineering and Architecture 4 (3): 74–79.
  • Eastman, C. M. 1975. “The Use of Computers instead of Drawings in Building Design.” AIA Journal 63 (3): 46–50.
  • Eastman, C. M., C. Eastman, P. Teicholz, R. Sacks, and K. Liston. 2011. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. John Wiley & Sons.
  • El-Adaway, I. H., G. G. Ali, I. S. Abotaleb, and H. M. Barber. Jr, 2020. “Studying the Relationship between Stock Prices of Publicly Traded US Construction Companies and Gross Domestic Product: Preliminary Step toward Construction–Economy Nexus.” Journal of Construction Engineering and Management 146 (1): 04019087. doi:10.1061/(ASCE)CO.1943-7862.0001742.
  • Emiliani, M. L., and D. J. Stec. 2005. “Leaders Lost in Transformation.” Leadership & Organization Development Journal 26 (5): 370–387.
  • Enache-Pommer, E.,. M. J. Horman, J. I. Messner, and D. Riley. 2010. “A Unified Process Approach to Healthcare Project Delivery: Synergies between Greening Strategies, Lean Principles, and BIM.” Construction Research Congress 2010: Innovation for Reshaping Construction Practice, 1376–1405. doi:10.1061/41109(373)138.
  • Enshassi, A., N. Saleh, and S. Mohamed. 2019. “Application Level of Lean Construction Techniques in Reducing Accidents in Construction Projects.” Journal of Financial Management of Property and Construction 24 (3): 274–293. doi:10.1108/JFMPC-08-2018-0047.
  • Erdem, D., and B. Ozorhon. 2015. “Assessing Real Estate Project Success Using an Analytic Network Process.” Journal of Management in Engineering 31 (4): 04014065. doi:10.1061/(ASCE)ME.1943-5479.0000281.
  • Evans, M., P. Farrell, A. Mashali, and W. Zewein. 2020. “Critical Success Factors for Adopting Building Information Modelling (BIM) and Lean Construction Practices on Construction Mega-Projects: A Delphi Survey.” Journal of Engineering, Design and Technology. 19: 537–556.
  • Fatt, C. T. 2005. An IT Roadmap for Singapore’s Construction Industry. Oslo: IAI Industry Day.
  • Fernandez-Solis, J. L., V. Porwal, S. Lavy, A. Shafaat, Z. K. Rybkowski, K. Son, and N. Lagoo. 2013. “Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users.” Journal of Construction Engineering and Management 139 (4): 354–360. doi:10.1061/(ASCE)CO.1943-7862.0000606.
  • Gao, S., and S. P. Low. 2014. Lean Construction Management, Vol. 10, 978–981. Singapore: Springer.
  • Gerber, D. J., B. Becerik-Gerber, and A. Kunz. 2010. “Building Information Modeling and Lean Construction: Technology, Methodology and Advances from Practice.” Proc. 18th Int’l Group for Lean Const.
  • Gerges, M., S. Austin, M. Mayouf, O. Ahiakwo, M. Jaeger, A. Saad, and T. El Gohary. 2017. “An Investigation into the Implementation of Building Information Modeling in the Middle East.” Journal of Information Technology in Construction 22: 1–15.
  • Garuti, C., and M. Sandoval, M. 2005. “Comparing AHP and ANP shiftwork models: Hierarchy simplicity v/s network connectivity.” In Proceedings of the 8th international Symposium of the AHP, Hawaii, USA.
  • Gbadamosi, A. Q., A. M. Mahamadu, P. Manu, O. Akinade, F. Sierra, T. T. Lam, and A. Alzaatreh. 2018. A BIM based approach for optimization of construction and assembly through material selection.
  • Ghosh, S., S. Bhattacharjee, P. Pishdad-Bozorgi, and R. Ganapathy. 2014. “A Case Study to Examine Environmental Benefits of Lean Construction.” Proceedings of the 22nd Conference of the International Group of Lean Construction (IGLC), 133–144.
  • Giel, B., and R. Issa. 2011. “BIM Return on Investment: A Case Study.” Journal of Building Information Modeling 1: 24–27.
  • Gilligan, B., and J. Kunz. 2007. VDC use in 2007: significant value, dramatic growth, and apparent business opportunity. TR171, 36.
  • Goyal, M., and Z. Gao. 2011. Integration of Building Information Modeling (BIM) and Prefabrication for Lean Construction. Leadership and Management in Engineering.
  • Grieves, M. 2019. “Virtually Intelligent Product Systems: Digital and Physical Twins.” Complex Systems Engineering: Theory and Practice 256: 175–200.
  • Gu, W., K. Foster, J. Shang, and L. Wei. 2019. “A Game-Predicting Expert System Using Big Data and Machine Learning.” Expert Systems with Applications 130: 293–305. doi:10.1016/j.eswa.2019.04.025.
  • Gurevich, U., and R. Sacks. 2014. “Examination of the Effects of a KanBIM Production Control System on Subcontractors’ Task Selections in Interior Works.” Automation in Construction 37: 81–87. doi:10.1016/j.autcon.2013.10.003.
  • Haarr, K. J., and F. Drevland. 2016. “A Mandated Lean Construction Delivery System in a Rehab Project–A Case Study.” 24th Annual Conference of the International Group for Lean Construction.
  • Hall, D. M., J. K. Whyte, and J. Lessing. 2020. “Mirror-Breaking Strategies to Enable Digital Manufacturing in Silicon Valley Construction Firms: A Comparative Case Study.” Construction Management and Economics 38 (4): 322–339. doi:10.1080/01446193.2019.1656814.
  • Hallowell, M. R., and M. E. Calhoun. 2011. “Interrelationships among Highly Effective Construction Injury Prevention Strategies.” Journal of Construction Engineering and Management 137 (11): 985–993. doi:10.1061/(ASCE)CO.1943-7862.0000354.
  • Hallowell, M. R., and J. A. Gambatese. 2010. “Qualitative Research: Application of the Delphi Method to CEM Research.” Journal of Construction Engineering and Management 136 (1): 99–107. doi:10.1061/(ASCE)CO.1943-7862.0000137.
  • Hallowell, M., B. Esmaeili, and P. Chinowsky. 2011. “Safety Risk Interactions among Highway Construction Work Tasks.” Construction Management and Economics 29 (4): 417–429. doi:10.1080/01446193.2011.552512.
  • Hamdan, S. B., B. Barkokebas, J. D. Manrique, and M. Al-Hussein. 2015. “A BIM-Based Simulation Model for Inventory Management in Panelized Construction.” ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, Vol. 32, 1. IAARC Publications.
  • Hamdi, O., and F. Leite. 2012. “BIM and Lean Interactions from the Bim Capability Maturity Model Perspective: A Case Study.” IGLC 2012-20th Conference of the International Group for Lean Construction. The International Group for Lean Construction.
  • Hao, J. 2012. “Application of Lean Construction to Chinese Construction Industry Based on BIM Technology.” 2012 Second International Conference on Business Computing and Global Informatization, 47–50. IEEE.
  • Heigermoser, D., B. G. de Soto, E. L. S. Abbott, and D. K. H. Chua. 2019. “BIM-Based Last Planner System Tool for Improving Construction Project Management.” Automation in Construction 104: 246–254. doi:10.1016/j.autcon.2019.03.019.
  • Hijazi, W., S. Alkass, and T. Zayed. 2009. “Constructability Assessment Using BIM/4D CAD Simulation Model.” AACE International Transactions 4: 1–14.
  • Hon, C. K., A. P. Chan, and M. C. Yam. 2012. “Empirical Study to Investigate the Difficulties of Implementing Safety Practices in the Repair and Maintenance Sector in Hong Kong.” Journal of Construction Engineering and Management 138 (7): 877–884. doi:10.1061/(ASCE)CO.1943-7862.0000497.
  • Howell, G. A. 1999. “What is Lean Construction-1999.” Proceedings IGLC, Vol. 7, 1.
  • Huang, C. C., and A. Kusiak. 1998. “Manufacturing Control with a Push-Pull Approach.” International Journal of Production Research 36 (1): 251–276. doi:10.1080/002075498194038.
  • Ikonen, J., A. Knutas, H. Hämäläinen, M. Ihonen, J. Porras, and T. Kallonen. 2013. “Use of Embedded RFID Tags in Concrete Element Supply Chains.” Journal of Information Technology in Construction 18 (7): 119–147.
  • Irizarry, J., E. P. Karan, and F. Jalaei. 2013. “Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management.” Automation in Construction 31: 241–254. doi:10.1016/j.autcon.2012.12.005.
  • Jaillon, L., and C. S. Poon. 2010. “Design Issues of Using Prefabrication in Hong Kong Building Construction.” Construction Management and Economics 28 (10): 1025–1042. doi:10.1080/01446193.2010.498481.
  • Jernigan, F. E. 2008. Big BIM, Little Bim: The Practical Approach to Building Information Modeling: Integrated Practice Done the Right Way! 4site Press.
  • Jung, W., G. Ballard, Y. W. Kim, and S. H. Han. 2012. “Understanding of Target Value Design for Integrated Project Delivery with the Context of Game Theory.” Construction Research Congress 2012: Construction Challenges in a Flat World, 556–563. doi:10.1061/9780784412329.056.
  • Kam, C., M. Fischer, R. Hänninen, A. Karjalainen, and J. Laitinen. 2003. “The Product Model and Fourth Dimension Project.” Journal of Information Technology in Construction 8 (12): 137–166.
  • Ke, Y., S. Wang, A. P. C. Chan, and E. Cheung. 2011. “Understanding the Risks in China’s PPP Projects: Ranking of Their Probability and Consequence.” Engineering, Construction and Architectural Management 18 (5): 481–496. doi:10.1108/09699981111165176.
  • Khanzode, A. 2010. An Integrated, Virtual Design and Construction and Lean (IVL) Method for Coordination of MEP. Unpublished Technical Report 187.
  • Khanzode, A., M. Fischer, D. Reed, and G. Ballard. 2006. A Guide to Applying the Principles of Virtual Design & Construction (VDC) to the Lean Project Delivery Process. Palo Alto, CA: CIFE, Stanford University.
  • Khezrimotlagh, D., J. Zhu, W. D. Cook, and M. Toloo. 2019. “Data Envelopment Analysis and Big Data.” European Journal of Operational Research 274 (3): 1047–1054. doi:10.1016/j.ejor.2018.10.044.
  • Kim, S. C., Y. W. Kim, K. S. Park, and C. Y. Yoo. 2015. “Impact of Measuring Operational-Level Planning Reliability on Management-Level Project Performance.” Journal of Management in Engineering 31 (5): 05014021. doi:10.1061/(ASCE)ME.1943-5479.0000326.
  • Ko, C. H. 2010. “An Integrated Framework for Reducing Precast Fabrication Inventory.” Journal of Civil Engineering and Management 16 (3): 418–427. doi:10.3846/jcem.2010.48.
  • Ko, C. H., and N. F. Chung. 2014. “Lean Design Process.” Journal of Construction Engineering and Management 140 (6): 04014011. doi:10.1061/(ASCE)CO.1943-7862.0000824.
  • Komonen, K. 2002. “A Cost Model of Industrial Maintenance for Profitability Analysis and Benchmarking.” International Journal of Production Economics 79 (1): 15–31. doi:10.1016/S0925-5273(00)00187-0.
  • Koseoglu, O., M. Sakin, and Y. Arayici. 2018. Exploring the BIM and Lean Synergies in the Istanbul Grand Airport Construction Project. Engineering, Construction and Architectural Management.
  • Koseoglu, O., and E. T. Nurtan-Gunes. 2018. “Mobile BIM Implementation and Lean Interaction on Construction Site: A Case Study of a Complex Airport Project.” Engineering, Construction and Architectural Management 25 (10): 1298–1321. doi:10.1108/ECAM-08-2017-0188.
  • Koskela, L. 1997. “Lean Production in Construction.” Lean Construction 1–9.
  • Koskela, L. 2000. An Exploration towards a Production Theory and Its Application to Construction. VTT Technical Research Centre of Finland.
  • Koskela, L., G. Howell, G. Ballard, and I. Tommelein. 2002. “The Foundations of Lean Construction.” Design and Construction: Building in Value, edited by R. Best and G. de Valence. Routledge.
  • Koskela, L., R. Vrijhoef, and R. Dana Broft. 2020. “Construction Supply Chain Management through a Lean Lens.” In Successful Construction Supply Chain Management: Concepts and Case Studies, 109–125. John Wiley & Sons.
  • Krafcik, J. F. 1988. “Triumph of the Lean Production System.” MIT Sloan Management Review 30 (1): 41.
  • Lagos, C., R. Herrera, and L. F. Alarcón. 2017. “Contributions of Information Technologies to Last Planner System Implementation.” Proc. Lean & Computing in Construction Congress (LC3), 1.
  • Lapinski, A. R., M. J. Horman, and D. R. Riley. 2006. “Lean Processes for Sustainable Project Delivery.” Journal of Construction Engineering and Management 132 (10): 1083–1091. doi:10.1061/(ASCE)0733-9364(2006)132:10(1083).
  • LCI (Lean Construction Institute) 2013. Introduction to Pull Planning. Accessed 29 May 2020. http://www.Leanconstruction.org/media/docs/deliveryGuide/Appendix7.pdf
  • Le, P. L., W. Elmughrabi, T. M. Dao, and A. Chaabane. 2020. “Present focuses and future directions of decision-making in construction supply chain management: a systematic review.” International Journal of Construction Management 20 (5): 490–509. doi:10.1080/15623599.2018.1488089.
  • Li, C. Z., F. Xue, X. Li, J. Hong, and G. Q. Shen. 2018a. “An Internet of Things-Enabled BIM Platform for on-Site Assembly Services in Prefabricated Construction.” Automation in Construction 89: 146–161. doi:10.1016/j.autcon.2018.01.001.
  • Li, S., X. Wu, Y. Zhou, and X. Liu. 2017b. “A Study on the Evaluation of Implementation Level of Lean Construction in Two Chinese Firms.” Renewable and Sustainable Energy Reviews 71: 846–851. doi:10.1016/j.rser.2016.12.112.
  • Li, X., G. Q. Shen, P. Wu, H. Fan, H. Wu, and Y. Teng. 2018b. “RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production.” Journal of Management in Engineering 34 (2): 04017053. doi:10.1061/(ASCE)ME.1943-5479.0000577.
  • Li, X., P. Wu, G. Q. Shen, X. Wang, and Y. Teng. 2017a. “Mapping the Knowledge Domains of Building Information Modeling (BIM): A Bibliometric Approach.” Automation in Construction 84: 195–206. doi:10.1016/j.autcon.2017.09.011.
  • Liker, J. 2004. The tanda way. Esensi.
  • Lööw, J. 2019. “An Investigation into Lean Production Practice in Mining.” International Journal of Lean Six Sigma 10 (1): 123–142. doi:10.1108/IJLSS-07-2017-0085.
  • Love, P. E., and D. J. Edwards. 2004. “Forensic Project Management: The Underlying Causes of Rework in Construction Projects.” Civil Engineering and Environmental Systems 21 (3): 207–228. doi:10.1080/10286600412331295955.
  • Love, P. E., and H. Li. 2000. “Quantifying the Causes and Costs of Rework in Construction.” Construction Management and Economics 18 (4): 479–490. doi:10.1080/01446190050024897.
  • Love, P. E., D. J. Edwards, S. Han, and Y. M. Goh. 2011. “Design Error Reduction: Toward the Effective Utilization of Building Information Modeling.” Research in Engineering Design 22 (3): 173–187. doi:10.1007/s00163-011-0105-x.
  • Love, P. E., R. Lopez, and J. T. Kim. 2014. “Design Error Management: interaction of People, Organisation and the Project Environment in Construction.” Structure and Infrastructure Engineering 10 (6): 811–820. doi:10.1080/15732479.2013.767843.
  • Love, P. E., P. Mandal, J. Smith, and H. Li. 2000. “Modelling the Dynamics of Design Error Induced Rework in Construction.” Construction Management and Economics 18 (5): 567–574. doi:10.1080/014461900407374.
  • Lu, Q., J. Won, and J. C. Cheng. 2016. “A Financial Decision Making Framework for Construction Projects Based on 5D Building Information Modeling (BIM).” International Journal of Project Management 34 (1): 3–21. doi:10.1016/j.ijproman.2015.09.004.
  • Lu, Y., Z. Wu, R. Chang, and Y. Li. 2017. “Building Information Modeling (BIM) for Green Buildings: A Critical Review and Future Directions.” Automation in Construction 83: 134–148. doi:10.1016/j.autcon.2017.08.024.
  • Mahalingam, A., A. K. Yadav, and J. Varaprasad. 2015. “Investigating the Role of Lean Practices in Enabling BIM Adoption: Evidence from Two Indian Cases.” Journal of Construction Engineering and Management 141 (7): 05015006. doi:10.1061/(ASCE)CO.1943-7862.0000982.
  • Mahamadu, A. M., D. Navendren, P. Manu, R. Joseph, and K. Dziekonski. 2017. “Addressing Challenges to Building Information Modelling Implementation in UK: Designers’ Perspectives.” Journal of Construction Project Management and Innovation 7 (Supplement 1): 1908–1932.
  • Mahmood, A., and S. Abrishami. 2020. BIM for Lean Building Surveying Services. Construction Innovation.
  • Mano, A. P., S. E. G. da Costa, and E. P. de Lima. 2019. “Analysis of the Production Function in Civil Construction: A Driver for Lean Construction.” Journal of Lean Systems 4 (4): 107–133.
  • Mardani, A., A. Jusoh, K. Nor, Z. Khalifah, N. Zakwan, and A. Valipour. 2015. “Multiple Criteria Decision-Making Techniques and Their Applications–A Review of the Literature from 2000 to 2014.” Economic Research-Ekonomska Istraživanja 28 (1): 516–571. doi:10.1080/1331677X.2015.1075139.
  • Matta, G., R. F. Herrera, C. Baladrón, Z. Giménez, and L. F. Alarcón. 2018. “Using BIM-Based Sheets as a Visual Management Tool for on-Site Instructions: A Case Study.” Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction towards Mature Production Management across Cultures and Frontiers, Chennai, India, 144–154.
  • Matthews, J., P. E. Love, J. Mewburn, C. Stobaus, and C. Ramanayaka. 2018. “Building Information Modelling in Construction: insights from Collaboration and Change Management Perspectives.” Production Planning & Control 29 (3): 202–216. doi:10.1080/09537287.2017.1407005.
  • Mehrbod, S., S. Staub-French, N. Mahyar, and M. Tory. 2019. “Characterizing Interactions with BIM Tools and Artifacts in Building Design Coordination Meetings.” Automation in Construction 98: 195–213. doi:10.1016/j.autcon.2018.10.025.
  • Mehrbod, S., S. Staub-French, M. Tory, and N. Mahyar. 2015. “A Framework for Classifying Bim Design Coordination Issues.” 5th International/11th Construction Specialty Conference, 329–321.
  • Mellado, F., and E. C. Lou. 2020. “Building Information Modelling, Lean and Sustainability: An Integration Framework to Promote Performance Improvements in the Construction Industry.” Sustainable Cities and Society 61: 102355. doi:10.1016/j.scs.2020.102355.
  • Meng, X. 2019. “Lean Management in the Context of Construction Supply Chains.” International Journal of Production Research 57 (11): 3784–3798. doi:10.1080/00207543.2019.1566659.
  • Mhando, Y. B., R. S. Mlinga, and H. M. Alinaitwe. 2018. “Variation Mitigation Model to Enhance Construction Performance of Public Building Projects in Tanzania.” American Journal of Civil Engineering and Architecture 6 (3): 105–118.
  • Mills, A., P. E. Love, and P. Williams. 2009. “Defect Costs in Residential Construction.” Journal of Construction Engineering and Management 135 (1): 12–16. doi:10.1061/(ASCE)0733-9364(2009)135:1(12).
  • Moghadam, M. 2014. “Lean-Mod: An Approach to Modular Construction Manufacturing Production Efficiency Improvement.” Doctoral Thesis, University of Alberta, Canada.
  • Moghadam, M.,. A. Alwisy, and M. Al-Hussein. 2012. “Integrated Lean/BIM Base Production Line Schedule Model for Modular Construction Manufacturing.” Construction Research Congress 2012: Construction Challenges in a Flat World, 1271–1280. doi:10.1061/9780784412329.128.
  • Mollasalehi, S., A. J. Fleming, A. Talebi, and J. Underwood. 2016. “Development of an Experimental Waste Framework Based on Lean/BIM Concept in Construction Design.” Proceedings, 24th Annual Conference of the International Group for Lean Construction (IGLC), 193–202. The International Group for Lean Construction (IGLC).
  • Morgan, J., and J. K. Liker. 2006. The Toyota Product Development System: Integrating People, Process, and Technology. Productivity Press.
  • Mostafa, S., N. Chileshe, and T. Abdelhamid. 2016. Lean and Agile Integration within Offsite Construction Using Discrete Event Simulation. Construction Innovation.
  • Murguia, D., X. Brioso, and A. Pimentel. 2016. “Applying Lean Techniques to Improve Performance in the Finishing Phase of a Residential Building.” Proc. 24th Annual Conference of the International Group for Lean Construction.
  • Murphy, M. K., N. A. Black, D. L. Lamping, C. M. McKee, C. F. Sanderson, J. Askham, and T. Marteau. 1998. “Consensus Development Methods, and Their Use in Clinical Guideline Development.” Health Technology Assessment 2 (3): 1–88.
  • Nascimento, D. L. D. M., E. D. Sotelino, T. P. S. Lara, R. G. G. Caiado, and P. Ivson. 2017. “Constructability in Industrial Plants Construction: A BIM-Lean Approach Using the Digital Obeya Room Framework.” Journal of Civil Engineering and Management 23 (8): 1100–1108. doi:10.3846/13923730.2017.1385521.
  • Nawari, N. O. 2012. “BIM Standard in off-Site Construction.” Journal of Architectural Engineering 18 (2): 107–113. doi:10.1061/(ASCE)AE.1943-5568.0000056.
  • Nekoufar, S. 2011. “Standardization of Large Scale Industrial Project in Multi Projects Environment.” International Journal of Management Science and Engineering Management 6 (4): 260–266. doi:10.1080/17509653.2011.10671171.
  • Nesensohn, C., D. Bryde, D. Fearon, and V. Hackett. 2014. Assessing Lean construction maturity. Proceedings of IGLC-22, June.
  • Niu, Y., W. Lu, K. Chen, G. G. Huang, and C. Anumba. 2016. “Smart Construction Objects.” Journal of Computing in Civil Engineering 30 (4): 04015070. doi:10.1061/(ASCE)CP.1943-5487.0000550.
  • Núñez-Merino, M.,. J. M. Maqueira-Marín, J. Moyano-Fuentes, and P. J. Martínez-Jurado. 2020. “Information and Digital Technologies of Industry 4.0 and Lean Supply Chain Management: A Systematic Literature Review.” International Journal of Production Research 58 (16): 5034–5061. doi:10.1080/00207543.2020.1743896.
  • Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. CRC Press.
  • Olanrewaju, S. D., and O. E. Ogunmakinde. 2020. “Waste Minimisation Strategies at the Design Phase: Architects’ Response.” Waste Management 118: 323–330. doi:10.1016/j.wasman.2020.08.045.
  • O’Loingsigh, M., A. Hore, B. McAuley, and J. Deeney. 2014. “Aligning BIM and Lean Methodologies within the Capital Works Management Framework in Ireland.” Computing in Civil and Building Engineering (2014), 1522–1529. doi:10.1061/9780784413616.189.
  • Opoku, D. G. J., S. Perera, R. Osei-Kyei, and M. Rashidi. 2021. “Digital Twin Application in the Construction Industry: A Literature Review.” Journal of Building Engineering 40: 102726.
  • Orji, I. J., S. Kusi-Sarpong, S. Huang, and D. Vazquez-Brust. 2020. “Evaluating the Factors That Influence Blockchain Adoption in the Freight Logistics Industry.” Transportation Research Part E: Logistics and Transportation Review 141: 102025. doi:10.1016/j.tre.2020.102025.
  • Osunsanmi, T. O., C. Aigbavboa, and A. Oke. 2018. “Construction 4.0: The Future of the Construction Industry in South Africa.” International Journal of Civil & Environmental Engineering 12 (3): 206–212.
  • Panteli, C., A. Kylili, and P. A. Fokaides. 2020. “Building Information Modelling Applications in Smart Buildings: From Design to Commissioning and beyond a Critical Review.” Journal of Cleaner Production 265: 121766. doi:10.1016/j.jclepro.2020.121766.
  • Papadonikolaki, E., C. van Oel, and M. Kagioglou. 2019. “Organising and Managing Boundaries: A Structurational View of Collaboration with Building Information Modelling (BIM).” International Journal of Project Management 37 (3): 378–394. doi:10.1016/j.ijproman.2019.01.010.
  • Park, C. S., D. Y. Lee, O. S. Kwon, and X. Wang. 2013. “A Framework for Proactive Construction Defect Management Using BIM, Augmented Reality and Ontology-Based Data Collection Template.” Automation in Construction 33: 61–71. doi:10.1016/j.autcon.2012.09.010.
  • Pekuri, A., M. Herrala, A. Aapaoja, and H. Haapasalo. 2012. “Applying Lean in Construction–Cornerstones for Implementation.” Proceedings of the 20th Annual Conference of the International Group for Lean Construction, 18–20.
  • Pohekar, S. D., and M. Ramachandran. 2004. “Application of Multi-Criteria Decision Making to Sustainable Energy Planning—A Review.” Renewable and Sustainable Energy Reviews 8 (4): 365–381. doi:10.1016/j.rser.2003.12.007.
  • Pishdad-Bozorgi, P.,. E. H. Moghaddam, and Y. Karasulu. 2013. “Advancing Target Price and Target Value Design Process in IPD Using BIM and Risk-Sharing Approaches.” Proceedings of the 49th ASC Annual International Conference Proceedings, San Luis Obispo, CA, USA, 9–13.
  • Poirier, E. A., D. Forgues, and S. Staub-French. 2014. “Dimensions of Interoperability in the AEC Industry.” Construction Research Congress 2014: Construction in a Global Network, 1987–1996.
  • Poirier, E., D. Forgues, and S. Staub-French. 2016. “Collaboration through Innovation: implications for Expertise in the AEC Sector.” Construction Management and Economics 34 (11): 769–789. doi:10.1080/01446193.2016.1206660.
  • Priven, V., and R. Sacks. 2016. “Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects.” Journal of Construction Engineering and Management 142 (7): 04016013. doi:10.1061/(ASCE)CO.1943-7862.0001102.
  • Radnor, Z., and P. Walley. 2008. “Learning to Walk before we Try to Run: Adapting Lean for the Public Sector.” Public Money and Management 28 (1): 13–20.
  • Rischmoller, L., L. F. Alarcón, and L. Koskela. 2006. “Improving Value Generation in the Design Process of Industrial Projects Using CAVT.” Journal of Management in Engineering 22 (2): 52–60. doi:10.1061/(ASCE)0742-597X(2006)22:2(52).
  • Roundtable, C. U. 2010. BIM implementation: An owner’s guide to getting started. Accessed 25 April 2013. http://www.Aia.Org/aiaucmp/groups/aia/documents/pdf/aiab085571.Pdfae
  • Saaty, R. W. 2003. Decision Making in Complex Environments. SuperDecisions.
  • Saaty, T. L. 1994. “How to Make a Decision: The Analytic Hierarchy Process.” Interfaces 24 (6): 19–43. doi:10.1287/inte.24.6.19.
  • Saaty, T. L. 1996. Decision Making with Dependence and Feedback: The Analytic Network Process, Vol. 4922. RWS Publ.
  • Saaty, T. L. 2008. “Decision Making with the Analytic Hierarchy Process.” International Journal of Services Sciences 1 (1): 83–98. doi:10.1504/IJSSCI.2008.017590.
  • Sacks, R., and M. Goldin. 2007. “Lean Management Model for Construction of High-Rise Apartment Buildings.” Journal of Construction Engineering and Management 133 (5): 374–384. doi:10.1061/(ASCE)0733-9364(2007)133:5(374).
  • Sacks, R., R. Barak, B. Belaciano, U. Gurevich, and E. Pikas. 2013. “KanBIM Workflow Management System: Prototype Implementation and Field Testing.” Lean Construction Journal: 19–35.
  • Sacks, R., B. Dave, L. Koskela, and R. Owen. 2009. Analysis framework for the interaction between Lean construction and building information modelling.
  • Sacks, R., L. Koskela, B. A. Dave, and R. Owen. 2010. “Interaction of Lean and Building Information Modeling in Construction.” Journal of Construction Engineering and Management 136 (9): 968–980. doi:10.1061/(ASCE)CO.1943-7862.0000203.
  • Sacks, R., M. Radosavljevic, and R. Barak. 2010. “Requirements for Building Information Modeling Based Lean Production Management Systems for Construction.” Automation in Construction 19 (5): 641–655. doi:10.1016/j.autcon.2010.02.010.
  • Sacks, R., M. Treckmann, and O. Rozenfeld. 2009. “Visualization of Work Flow to Support Lean Construction.” Journal of Construction Engineering and Management 135 (12): 1307–1315. doi:10.1061/(ASCE)CO.1943-7862.0000102.
  • Salem, O., J. Solomon, A. Genaidy, and I. Minkarah. 2006. “Lean Construction: From Theory to Implementation.” Journal of Management in Engineering 22 (4): 168–175. doi:10.1061/(ASCE)0742-597X(2006)22:4(168).
  • Sanchez, A., K. Hampson, and S. Vaux. 2016. Delivering Value with BIM. London: Taylor and Francis.
  • Sarkis, J., and R. P. Sundarraj. 2000. “Factors for Strategic Evaluation of Enterprise Information Technologies.” International Journal of Physical Distribution & Logistics Management 30 (3/4): 196–220. doi:10.1108/09600030010325966.
  • Sarkis, J. 2003. “A Strategic Decision Framework for Green Supply Chain Management.” Journal of Cleaner Production 11 (4): 397–409. doi:10.1016/S0959-6526(02)00062-8.
  • Sarkis, J., and R. P. Sundarraj. 2002. “Managerial Issues in Locating a Spare-Parts Hub for Digital Equipment Corporation.” Production and Inventory Management Journal 43 (3/4), 47.
  • Scherer, R. J., and S. E. Schapke. 2011. “A Distributed Multi-Model-Based Management Information System for Simulation and Decision-Making on Construction Projects.” Advanced Engineering Informatics 25 (4): 582–599. doi:10.1016/j.aei.2011.08.007.
  • Schimanski, C. P., G. Pasetti Monizza, C. Marcher, and D. T. Matt. 2021. “Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques.” Frontiers of engineering management 8 (3): 429–441. doi:10.1007/s42524-020-0105-5.
  • Seth, D., N. Seth, and P. Dhariwal. 2017. “Application of Value Stream Mapping (VSM) for Lean and Cycle Time Reduction in Complex Production Environments: A Case Study.” Production Planning & Control 28 (5): 398–419. doi:10.1080/09537287.2017.1300352.
  • Seth, D., V. K. Nemani, S. Pokharel, and A. Y. Al Sayed. 2018. “Impact of Competitive Conditions on Supplier Evaluation: A Construction Supply Chain Case Study.” Production Planning & Control 29 (3): 217–235. doi:10.1080/09537287.2017.1407971.
  • Shewhart, W. A. 1931. Economic Control of Quality of Manufactured Product. London: Macmillan And Co Ltd.
  • Shou, W., X. Wang, J. Wang, L. Hou, and M. Truijens. 2014. “Integration of BIM and Lean Concepts to Improve Maintenance Efficiency: A Case Study.” Computing in Civil and Building Engineering (2014), 373–380. doi:10.1061/9780784413616.047.
  • Shou, W., J. Wang, P. Wu, and X. Wang. 2020. “Lean Management Framework for Improving Maintenance Operation: Development and Application in the Oil and Gas Industry.” Production Planning & Control 32 (7): 585–602.
  • Sipahi, S., and M. Timor. 2010. “The Analytic Hierarchy Process and Analytic Network Process: An Overview of Applications.” Management Decision 48 (5): 775–808. doi:10.1108/00251741011043920.
  • Small, E. P., K. Al Hamouri, and H. Al Hamouri. 2017. “Examination of Opportunities for Integration of Lean Principles in Construction in Dubai.” Procedia Engineering 196: 616–621. doi:10.1016/j.proeng.2017.08.049.
  • Spearman, M. L., and W. J. Hopp. 1996. Factory Physics: Foundations of Manufacturing Management. Chicago, IL: Irwin.
  • Spitler, L. E. 2014. “The Effect of Inter-Team Dynamics on the Constructability of the BIM Model.” Proc. 22nd Ann. Conf. of the Int’l Group for Lean Construction, 957–968.
  • Sriprasert, E., and N. Dawood. 2003. “Multi-Constraint Information Management and Visualisation for Collaborative Planning and Control in Construction.” Journal of Information Technology in Construction 8: 341–366.
  • Sullivan, C. C. 2007. “Integrated BIM and Design Review for Safer, Better Buildings.” Architectural Record 6: 191–199.
  • Sun, C., S. Jiang, M. J. Skibniewski, Q. Man, and L. Shen. 2015. “A Literature Review of the Factors Limiting the Application of BIM in the Construction Industry.” Technological and Economic Development of Economy 23 (5): 764–779. doi:10.3846/20294913.2015.1087071.
  • Taguchi, G. 1993. “Robust Technology Development.” Mechanical Engineering-CIME 115 (3): 60–63.
  • Tan, T.,. K. Chen, F. Xue, and W. Lu. 2019. “Barriers to Building Information Modeling (BIM) Implementation in China’s Prefabricated Construction: An Interpretive Structural Modeling (ISM) Approach.” Journal of Cleaner Production 219: 949–959. doi:10.1016/j.jclepro.2019.02.141.
  • Tang, S., D. R. Shelden, C. M. Eastman, P. Pishdad-Bozorgi, and X. Gao. 2019. “A Review of Building Information Modeling (BIM) and the Internet of Things (IoT) Devices Integration: Present Status and Future Trends.” Automation in Construction 101: 127–139. doi:10.1016/j.autcon.2019.01.020.
  • Tauriainen, M., P. Marttinen, B. Dave, and L. Koskela. 2016. “The Effects of BIM and Lean Construction on Design Management Practices.” Procedia Engineering 164: 567–574. doi:10.1016/j.proeng.2016.11.659.
  • Terreno, S., S. Asadi, and C. Anumba. 2019. “An Exploration of Synergies between Lean Concepts and BIM in FM: A Review and Directions for Future Research.” Buildings 9 (6): 147. doi:10.3390/buildings9060147.
  • Tezel, A., L. Koskela, and Z. Aziz. 2018. “Current Condition and Future Directions for Lean Construction in Highways Projects: A Small and Medium-Sized Enterprises (SMEs) Perspective.” International Journal of Project Management 36 (2): 267–286. doi:10.1016/j.ijproman.2017.10.004.
  • Tezel, A., M. Taggart, L. Koskela, P. Tzortzopoulos, J. Hanahoe, and M. Kelly. 2020. “Lean Construction and BIM in Small and Medium-Sized Enterprises (SMEs) in Construction: A Systematic Literature Review.” Canadian Journal of Civil Engineering 47 (2): 186–201. doi:10.1139/cjce-2018-0408.
  • Tezel, B. A., and Z. U. H. Aziz. 2017. “From Conventional to IT Based Visual Management: A Conceptual Discussion for Lean Construction.” Journal of Information Technology in Construction 22: 220–246.
  • Tezel, A., L. Koskela, and P. Tzortzopoulos. 2016. “Visual Management in Production Management: A Literature Synthesis.” Journal of Manufacturing Technology Management 27 (6): 766–799. doi:10.1108/JMTM-08-2015-0071.
  • Tommelein, I. D., and G. Ballard. 1997. Look-Ahead Planning: Screening and Pulling, 20–21. eScholarship, University of California.
  • Triantaphyllou, E. 2000. “Multi-Criteria Decision Making Methods.” In Multi-Criteria Decision Making Methods: A Comparative Study, 5–21. New York, NY: Springer US.
  • Tribelsky, E., and R. Sacks. 2011. “An Empirical Study of Information Flows in Multidisciplinary Civil Engineering Design Teams Using Lean Measures.” Architectural Engineering and Design Management 7 (2): 85–101. doi:10.1080/17452007.2011.582332.
  • US Census Bureau Construction Expenditures Branch 2018. “US Census Bureau construction spending survey.” Accessed 8 December 2018. https://www.census.gov/construction/c30/c30index.html
  • Vaidyanathan, K., S. Mohanbabu, P. Sriram, S. Rahman, and S. Arunkumar. 2016. “Application of Lean Principles to Managing Construction of an IT Commercial Facility-an Indian Experience.” 24th Annual Conference of the International Group for Lean Construction, 183–192. Boston, MA: International Group for Lean Construction.
  • Viana, D. D., B. Mota, C. T. Formoso, M. Echeveste, M. Peixoto, and C. Rodrigues. 2010. “A Survey on the Last Planner System: Impacts and Difficulties for Implementation in Brazilian Companies.” Annual Conference of the International Group for Lean Construction, Vol. 18).
  • Wandahl, S. 2014. “Lean Construction with or without Lean–Challenges of Implementing Lean Construction.” Proceedings of the 22nd Annual Conference of the International Group for Lean Construction, 97–108. Oslo: IGLC.
  • Wang, J. J., Y. Y. Jing, C. F. Zhang, and J. H. Zhao. 2009. “Review on Multi-Criteria Decision Analysis Aid in Sustainable Energy Decision-Making.” Renewable and Sustainable Energy Reviews 13 (9): 2263–2278. doi:10.1016/j.rser.2009.06.021.
  • Wang, J., X. Wang, W. Shou, H. Y. Chong, and J. Guo. 2016. “Building Information Modeling-Based Integration of MEP Layout Designs and Constructability.” Automation in Construction 61: 134–146. doi:10.1016/j.autcon.2015.10.003.
  • Ward, A., J. K. Liker, J. J. Cristiano, and D. K. Sobek. 1995. “The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster.” Sloan Management Review 36: 43–43.
  • Womack, J. P., and D. T. Jones. 2003. Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Revised and Updated (published 1996).
  • Womack, J. P., D. T. Jones, and D. Roos. 2007. The Machine That Changed the World: The Story of Lean Production–Toyota’s Secret Weapon in the Global Car Wars That is Now Revolutionizing World Industry. Simon and Schuster.
  • Wu, P., and S. P. Low. 2012. “Lean Management and Low Carbon Emissions in Precast Concrete Factories in Singapore.” Journal of Architectural Engineering 18 (2): 176–186. doi:10.1061/(ASCE)AE.1943-5568.0000053.
  • Zaim, S., M. Sevkli, H. Camgöz-Akdağ, O. F. Demirel, A. Y. Yayla, and D. Delen. 2014. “Use of ANP Weighted Crisp and Fuzzy QFD for Product Development.” Expert Systems with Applications 41 (9): 4464–4474. doi:10.1016/j.eswa.2014.01.008.
  • Zegarra, O., and L. F. Alarcón. 2019. “Coordination of Teams, Meetings, and Managerial Processes in Construction Projects: Using a Lean and Complex Adaptive Mechanism.” Production Planning & Control 30 (9): 736–763. doi:10.1080/09537287.2019.1578905.
  • Zhu, Q., P. Shah, and J. Sarkis. 2018. “Addition by Subtraction: Integrating Product Deletion with Lean and Sustainable Supply Chain Management.” International Journal of Production Economics 205: 201–214.
  • Zimina, D., G. Ballard, and C. Pasquire. 2012. “Target Value Design: Using Collaboration and a Lean Approach to Reduce Construction Cost.” Construction Management and Economics 30 (5): 383–398. doi:10.1080/01446193.2012.676658.
  • Zomer, T., A. Neely, R. Sacks, and A. Parlikad. 2021. “Exploring the Influence of Socio-Historical Constructs on BIM Implementation: An Activity Theory Perspective.” Construction Management and Economics 39 (1): 1–20. doi:10.1080/01446193.2020.1792522.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.