Publication Cover
Production Planning & Control
The Management of Operations
Volume 34, 2023 - Issue 15
987
Views
8
CrossRef citations to date
0
Altmetric
Research Articles

Understanding motives for and barriers to implementing asset management system: an empirical study for engineered physical assets

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 1497-1512 | Received 29 Jun 2020, Accepted 24 Nov 2021, Published online: 03 Feb 2022

References

  • Allur, Erlantz, Iñaki Heras-Saizarbitoria, and Martí Casadesús. 2014. “Internalization of ISO 9001: A Longitudinal Survey.” Industrial Management & Data Systems 114 (6): 872–885. doi:10.1108/IMDS-01-2014-0013.
  • Almeida, N., J. Vieira, J. Silva, and C. Castro. 2019. “The Impact of Asset Management Development Programs in Infrastructure Organizations: A Pilot-Case Study.” Conference on Automation Innovation in Construction (CIAC-2019), 7–8 November, Leiria, Portugal.
  • Almeida, Nuno Marques, Vitor Sousa, Luís Alves Dias, and Fernando Branco. 2015. “Engineering Risk Management in Performance-Based Building Environments.” Journal of Civil Engineering and Management 21 (2): 218–230. doi:10.3846/13923730.2013.802740.
  • Almeida, Nuno, Vitor Sousa, L. Alves Dias, and Fernando Branco. 2010. “A Framework for Combining Risk-Management and Performance-Based Building Approaches.” Building Research & Information 38 (2): 157–174. doi:10.1080/09613210903516719.
  • Al-Najjar, Basim. 2007. “The Lack of Maintenance and Not Maintenance Which Costs: A Model to Describe and Quantify the Impact of Vibration-Based Maintenance on Company’s Business.” International Journal of Production Economics 107 (1): 260–273. doi:10.1016/j.ijpe.2006.09.005.
  • Alsyouf, Imad, Maitha Alsuwaidi, Sadeque Hamdan, and Mohammad Shamsuzzaman. 2021. “Impact of ISO 55000 on Organisational Performance: Evidence from Certified UAE Firms.” Total Quality Management & Business Excellence 32 (1–2): 134–152. doi:10.1080/14783363.2018.1537750.
  • Amadi-Echendu, Joe E., Roger Willett, Kerry Brown, Tony Hope, Jay Lee, Joseph Mathew, Nalinaksh Vyas, and Bo-Suk Yang. 2010. What Is Engineering Asset Management? London: Springer. doi:10.1007/978-1-84996-178-3_1.
  • AMC. 2014. Framewok for Asset Management. 2nd ed. Asset Management Council.
  • Barney, Jay B. 1986. “Strategic Factor Markets: Expectations, Luck, and Business Strategy.” Management Science 32 (10): 1231–1241. doi:10.1287/mnsc.32.10.1231.
  • Brunetto, Yvonne, Matthew Xerri, and Silvia Nelson. 2014. “Building a Proactive, Engagement Culture in Asset Management Organizations.” Journal of Management in Engineering 30 (4): 04014014. doi:10.1061/(ASCE)ME.1943-5479.0000251.
  • Campos, M. A. L., and A. Crespo Márquez. 2011. “Modelling a Maintenance Management Framework Based on PAS 55 Standard.” Quality and Reliability Engineering International 27 (6): 805–820. doi:10.1002/qre.1168.
  • Cândido, Carlos J. F., and Luís M. F. R. Ferreira. 2021. “ISO 9001 Internal Decertification Motivations: Exploring Barriers and Benefits of Certification as Withdrawal Antecedents.” Production Planning & Control 1–15. doi:10.1080/09537287.2021.1916638.
  • Candón, E., P. Martínez-Galán, A. de la Fuente, V. González-Prida, A. Crespo Márquez, J. Gómez, A. Sola, and M. Macchi. 2019. “Implementing Intelligent Asset Management Systems (IAMS) within an Industry 4.0 Manufacturing Environment.” IFAC-PapersOnLine 52 (13): 2488–2493. doi:10.1016/j.ifacol.2019.11.580.
  • Casadesús, Martí, and Stanislav Karapetrovic. 2005. “An Empirical Study of the Benefits and Costs of ISO 9001: 2000 Compared to ISO 9001/2/3: 1994.” Total Quality Management & Business Excellence 16 (1): 105–120. doi:10.1080/1478336042000309893.
  • Chiarini, Andrea. 2019. “Why Are Manufacturing SMEs Cancelling Their ISO 9001 Certification? Research from Italy.” Production Planning & Control 30 (8): 639–649. doi:10.1080/09537287.2019.1566840.
  • Chin, W. W., and P. R. Newsted. 1999. “Structural Equation Modeling Analysis with Small Samples Using Partial Least Squares.” In Statistical Strategies for Small Samples Research, edited by R. H. Hoyle. Newbury Park, CA: Sage Publications.
  • Crespo Márquez, Adolfo, Antonio Jesús Guillén López, Antonio Sola Rosique, and Carlos Parra Márquez. 2018. “On the Family of Standards UNE-ISO 55000 and How to Effectively Manage Assets.” In Advanced Maintenance Modelling for Asset Management: Techniques and Methods for Complex Industrial Systems, 1–16. Springer International Publishing. doi:10.1007/978-3-319-58045-6_1.
  • EFNMS. 2009. A Definition of Asset Management. Minutes of the Meeting. European Federation of National Maintenance Societies. Trondheim, Norway: EFNMS.
  • EFNMS-EAMC. 2012. How Organizations Manage Their Physical Assets in Practice, EFNMS Asset Management Survey (EFNMS). Trondheim, Norway: EFNMS.
  • El-Akruti, Khaled, and Richard Dwight. 2013. “A Framework for the Engineering Asset Management System.” Journal of Quality in Maintenance Engineering 19 (4): 398–412. doi:10.1108/JQME-01-2012-0002.
  • El-Akruti, Khaled, Senevi Kiridena, and Richard Dwight. 2018. “Contextualist-Retroductive Case Study Design for Strategic Asset Management Research.” Production Planning & Control 29 (16): 1332–1342. doi:10.1080/09537287.2018.1535145.
  • Emmanouilidis, Christos, and Kari Komonen. 2013. Physical Asset Management Practices in Industry: Comparisons between Greece and Other EU Countries. Berlin, Heidelberg: Springer. doi:10.1007/978-3-642-41263-9_63.
  • Flintsch, G. W., and J. W. Bryant. 2006. “Asset Management Data Collection for Supporting Decision Processes.” http://www.bv.transports.gouv.qc.ca/mono/1017430.pdf.
  • Fornell, Claes, and David F. Larcker. 1981. “Evaluating Structural Equation Models with Unobservable Variables and Measurement Error.” Journal of Marketing Research 18 (1): 39–50. doi:10.2307/3151312.
  • Frolov, Vladimir, David Mengel, Wasana Bandara, Yong Sun, and Lin Ma. 2010. “Building an Ontology and Process Architecture for Engineering Asset Management.” In Engineering Asset Lifecycle Management, edited by D. Kiritsis, C. Emmanouilidis, A. Koronios, and J. Mathew, 86–97. London: Springer. doi:10.1007/978-0-85729-320-6_11.
  • Gavrikova, Elizaveta, Irina Volkova, and Yegor Burda. 2020. “Strategic Aspects of Asset Management: An Overview of Current Research.” Sustainability 12 (15): 5955. doi:10.3390/su12155955.
  • GFMAM. 2014. The Asset Management Landscape. 2nd ed. GFMAM.
  • Gotzamani, Katerina D., George D. Tsiotras, Maria Nicolaou, Akis Nicolaides, and Vassiliki Hadjiadamou. 2007. “The Contribution to Excellence of ISO 9001: The Case of Certified Organisations in Cyprus.” The TQM Magazine 19 (5): 388–402. doi:10.1108/09544780710817838.
  • Hair, Joseph F., William C. Black, Barry J. Babin, and Rolph E. Anderson. 2010. Multivariate Data Analysis. 7th ed. Englewood Cliffs: Prentice Hall.
  • Hair, Joseph F., G. T. M. Hult, Christian M. Ringle, and Marko Sarstedt. 2014. A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). Thousand Oaks, CA: SAGE Publications.
  • Hair, Joseph F., Jeffrey J. Risher, Marko Sarstedt, and Christian M. Ringle. 2019. “When to Use and How to Report the Results of PLS-SEM.” European Business Review 31 (1): 2–24. doi:10.1108/EBR-11-2018-0203.
  • Hodkiewicz, Melinda. 2015. “Asset Management - Quo Vadis (Where Are You Going)?” International Journal of Strategic Engineering Asset Management 2 (4): 313. doi:10.1504/IJSEAM.2015.075411.
  • ISO. 2019. Understanding the Benefits of an ISO 55001 Asset Management System Asset Management First Edition. ISO.
  • Johnson, Charles, and Chris Lloyd. 2012. “Organisational Culture and Leadership – Lessons for Asset Management.” IET Conference Publications. Vol. 2012. Institution of Engineering and Technology. doi:10.1049/cp.2012.1908.
  • Komljenovic, Dragan, Georges Abdul-Nour, and Jean-François Boudreau. 2019. Decision-Making in Asset Management under Regulatory Constraints. Cham: Springer. doi:10.1007/978-3-319-95711-1_32.
  • Komonen, Kari, Helena Kortelainen, and Minna Räikkönen. 2012. “Corporate Asset Management for Industrial Companies: An Integrated Business-Driven Approach.” In Asset Management, edited by T. Van der Lei, P. Herder, and Y. Wijnia, 47–63. Dordrecht: Springer Netherlands. doi:10.1007/978-94-007-2724-3_4.
  • Leite, Higor, Zoe Radnor, and Nicola Bateman. 2020. “Meaningful Inhibitors of the Lean Journey: A Systematic Review and Categorisation of Over 20 Years of Literature.” Production Planning & Control 1–24. doi:10.1080/09537287.2020.1823511.
  • Lima, Eliana Sangreman, Paul McMahon, and Ana Paula Cabral Seixas Costa. 2021. “Establishing the Relationship between Asset Management and Business Performance.” International Journal of Production Economics 232 (September): 107937. doi:10.1016/j.ijpe.2020.107937.
  • Liyanage, Jayantha P. 2007. “Operations and Maintenance Performance in Production and Manufacturing Assets.” Journal of Manufacturing Technology Management 18 (3): 304–314. doi:10.1108/17410380710730639.
  • Magd, Hesham A. E. 2008. “ISO 9001:2000 in the Egyptian Manufacturing Sector: Perceptions and Perspectives.” International Journal of Quality & Reliability Management 25 (2): 173–200. doi:10.1108/02656710810846934.
  • Maletič, Damjan, Matjaž. Maletič, Basim Al-Najjar, and Boštjan Gomišček. 2020. “An Analysis of Physical Asset Management Core Practices and Their Influence on Operational Performance.” Sustainability 12 (21): 9097. doi:10.3390/su12219097.
  • Maletič, Damjan, Matjaž. Maletič, Basim Al-Najjar, Boštjan Gomišček, Damjan Maletič, Matjaž. Maletič, Basim Al-Najjar, and Boštjan Gomišček. 2018. “Development of a Model Linking Physical Asset Management to Sustainability Performance: An Empirical Research.” Sustainability 10 (12): 4759. doi:10.3390/su10124759.
  • Maletič, Damjan, Matjaž. Maletič, Basim Al-Najjar, Katerina Gotzamani, Maria Gianni, T. Bartosz Kalinowski, and Boštjan Gomišček. 2017. “Contingency Factors Influencing Implementation of Physical Asset Management Practices.” Organizacija 50 (1): 3–16. doi:10.1515/orga-2017-0003.
  • Maletič, Damjan. 2015. “Interaction between Quality Management, Production and Maintenance Performance.” PhD thesis, Faculty of Organizational Sciences, University of Maribor.
  • Marzooqi, Fawzeia Abdulla Al., Matloub Hussain, and Syed Zamberi Ahmad. 2019. “Performance of Physical Asset Management Using the Analytic Hierarchy Process.” Property Management 37 (3): 327–345. doi:10.1108/PM-07-2018-0039.
  • Masood, Tariq, Duncan McFarlane, Ajith Parlikad, John Dora, Andrew Ellis, and Jennifer Schooling. 2016. Infrastructure Asset Management. ICE Publishing.
  • Massoud, May A., Rabih Fayad, Mutasem El-Fadel, and Rabih Kamleh. 2010. “Drivers, Barriers and Incentives to Implementing Environmental Management Systems in the Food Industry: A Case of Lebanon.” Journal of Cleaner Production 18 (3): 200–209. doi:10.1016/j.jclepro.2009.09.022.
  • Meyer, John W., and Brian Rowan. 1977. “Institutionalized Organizations: Formal Structure as Myth and Ceremony.” American Journal of Sociology 83 (2): 340–363. doi:10.1086/226550.
  • NAMS. 2000. International Infrastructure Management Manual. NZ National Asset Management Steering Group. Institute of Public Works Engineering Australia.
  • NAMS. 2015. International Infrastructure Management Manual (IIMM). 5th ed. Institute of Public Works Engineering Australia; Association of Local Government Engineers of New Zealand. National Asset Management Steering Group.
  • Newbert, Scott L. 2008. “Value, Rareness, Competitive Advantage, and Performance: A Conceptual-Level Empirical Investigation of the Resource-Based View of the Firm.” Strategic Management Journal 29 (7): 745–768. doi:10.1002/smj.686.
  • Pačaiová, H., J. Sinay, and A. Nagyová. 2017. “Development of GRAM – A Risk Measurement Tool Using Risk Based Thinking Principles.” Measurement 100 (March): 288–296. doi:10.1016/j.measurement.2017.01.004.
  • Patel, Bharat Singh, Murali Sambasivan, R. Panimalar, and R. Hari Krishna. 2021. “A Relational Analysis of Drivers and Barriers of Lean Manufacturing.” The TQM Journal. doi:10.1108/TQM-12-2020-0296.
  • Podsakoff, Philip M., Scott B. MacKenzie, Jeong-Yeon Lee, and Nathan P. Podsakoff. 2003. “Common Method Biases in Behavioral Research: A Critical Review of the Literature and Recommended Remedies.” The Journal of Applied Psychology 88 (5): 879–903. doi:10.1037/0021-9010.88.5.879.
  • Poksinska, Bozena, Jens Jörn Dahlgaard, and Jörgen A. E. Eklund. 2003. “Implementing ISO 14000 in Sweden: Motives, Benefits and Comparisons with ISO 9000.” International Journal of Quality & Reliability Management 20 (5): 585–606. doi:10.1108/02656710310476543.
  • Poksinska, Bozena, Jens Jörn Dahlgaard, and Marc Antoni. 2002. “The State of ISO 9000 Certification: A Study of Swedish Organizations.” The TQM Magazine 14 (5): 297–306. doi:10.1108/09544780210439734.
  • Prajogo, Daniel I. 2011. “The Roles of Firms’ Motives in Affecting the Outcomes of ISO 9000 Adoption.” International Journal of Operations & Production Management 31 (1): 78–100. doi:10.1108/01443571111098753.
  • Prajogo, Daniel, Ailie K. Y. Tang, and Kee-hung Lai. 2012. “Do Firms Get What They Want from ISO 14001 Adoption?: an Australian Perspective.” Journal of Cleaner Production 33: 117–126. doi:10.1016/j.jclepro.2012.04.019.
  • Psomas, Evangelos L., Christos V. Fotopoulos, and Dimitrios P. Kafetzopoulos. 2010. “Critical Factors for Effective Implementation of ISO 9001 in SME Service Companies.” Managing Service Quality: An International Journal 20 (5): 440–457. doi:10.1108/09604521011073731.
  • Psomas, Evangelos L., Christos V. Fotopoulos, and Dimitrios P. Kafetzopoulos. 2011. “Motives, Difficulties and Benefits in Implementing the ISO 14001 Environmental Management System.” Management of Environmental Quality: An International Journal 22 (4): 502–521. doi:10.1108/14777831111136090.
  • Roda, I., and M. Macchi. 2016. “Studying the Funding Principles for Integrating Asset Management in Operations: An Empirical Research in Production Companies.” IFAC-PapersOnLine 49 (28): 1–6. doi:10.1016/j.ifacol.2016.11.001.
  • Roldán, José L., and Manuel J. Sánchez-Franco. 2012. “Variance-Based Structural Equation Modeling: Guidelines for Using Partial Least Squares in Information Systems Research.” In Research Methodologies, Innovations and Philosophies in Software Systems Engineering and Information Systems, edited by M. Mora, O. Gelman, A. L. Steenkamp, and M. Raisinghani, 193–221. IGI Global. doi:10.4018/978-1-4666-0179-6.ch010.
  • Rusjan, Borut, and Milena Alič. 2010. “Capitalising on ISO 9001 Benefits for Strategic Results.” International Journal of Quality & Reliability Management 27 (7): 756–778. doi:10.1108/02656711011062372.
  • Salvado, Filipa, Nuno Marques de Almeida, and Alvaro Vale e Azevedo. 2018. “Toward Improved LCC-Informed Decisions in Building Management.” Built Environment Project and Asset Management 8 (2): 114–133. doi:10.1108/BEPAM-07-2017-0042.
  • Salvado, Filipa, Nuno Marques de Almeida, and Álvaro Vale e Azevedo. 2019. “Historical Analysis of the Economic Life-Cycle Performance of Public School Buildings.” Building Research & Information 47 (7): 813–832. doi:10.1080/09613218.2019.1612730.
  • Sampaio, Paulo, Pedro Saraiva, and António Guimarães Rodrigues. 2009. “ISO 9001 Certification Research: Questions, Answers and Approaches.” International Journal of Quality & Reliability Management 26 (1): 38–58. doi:10.1108/02656710910924161.
  • Sampaio, Paulo, Pedro Saraiva, and António Guimarães Rodrigues. 2011. “ISO 9001 Certification Forecasting Models.” International Journal of Quality & Reliability Management 28 (1): 5–26. doi:10.1108/02656711111097526.
  • Sanchez, Gaston. 2013. PLS Path Modeling with R. Berkeley: Trowchez Editions. http://www.gastonsanchez.com/PLSPathModelingwithR.pdf.
  • Sarstedt, Marko, Joseph F. Hair, Christian M. Ringle, Kai O. Thiele, and Siegfried P. Gudergan. 2016. “Estimation Issues with PLS and CBSEM: Where the Bias Lies!” Journal of Business Research 69 (10): 3998–4010. doi:10.1016/j.jbusres.2016.06.007.
  • Schuman, Charles A., and Alan C. Brent. 2005. “Asset Life Cycle Management: Towards Improving Physical Asset Performance in the Process Industry.” International Journal of Operations & Production Management 25 (6): 566–579. doi:10.1108/01443570510599728.
  • Singels, Jeroen, Gwenny Ruël, and Henny van de Water. 2001. “ISO 9000 Series ‐ Certification and Performance.” International Journal of Quality & Reliability Management 18 (1): 62–75. doi:10.1108/02656710110364477.
  • Susanty, Aries, Diana Puspita Sari, Dyah Ika Rinawati, and Lutfi Setiawan. 2019. “The Role of Internal and External Drivers for Successful Implementation of GSCM Practices.” Journal of Manufacturing Technology Management 30 (2): 391–420. doi:10.1108/JMTM-07-2018-0217.
  • Tam, Allen S. B., and John W. H. Price. 2008. “A Generic Asset Management Framework for Optimising Maintenance Investment Decision.” Production Planning & Control 19 (4): 287–300. doi:10.1080/09537280802034042.
  • The IAM 2015. “Asset Management – An Anatomy.” The Institute of Asset Management. https://theiam.org/media/1781/iam_anatomy_ver3_web.pdf.
  • Too, Eric G. 2010. A Framework for Strategic Infrastructure Asset Management. London: Springer. doi:10.1007/978-1-84996-178-3_3.
  • Trindade, M., N. Almeida, M. Finger, and D. Ferreira. 2019. “Design and Development of a Value-Based Decision Making Process for Asset Intensive Organizations.” Lecture Notes in Mechanical Engineering, 605–623. doi:10.1007/978-3-319-95711-1_60.
  • van Heerden, M. A., and J. L. Jooste. 2018. “A Guide for Integrating Total Quality Management and Physical Asset Management in the Food Industry.” South African Journal of Industrial Engineering 29 (4): 155–170. doi:10.7166/29-4-1944.
  • Vieira, João, Marta Cabral, Nuno Almeida, Jaime Gabriel Silva, and Dídia Covas. 2020. “Novel Methodology for Efficiency-Based Long-Term Investment Planning in Water Infrastructures.” Structure and Infrastructure Engineering 16 (12): 1615–1654. February,. doi:10.1080/15732479.2020.1722715.
  • Vinzi, Vincenzo Esposito, Laura Trinchera, and Silvano Amato. 2010. “PLS Path Modeling: From Foundations to Recent Developments and Open Issues for Model Assessment and Improvement.” In Handbook of Partial Least Squares, edited by Vincenzo Esposito Vinzi, Wynne W. Chin, Jörg Henseler, and Huiwen Wang, 47–82. Berlin, Heidelberg: Springer Berlin Heidelberg. doi:10.1007/978-3-540-32827-8_3.
  • Wernerfelt, Birger. 1984. “A Resource-Based View of the Firm.” Strategic Management Journal 5 (2): 171–180. doi:10.1002/smj.4250050207.
  • Wijnia, Y. 2016. “Processing Risk In Asset Management: Exploring The Boundaries Of Risk Based Optimization Under Uncertainty For An Energy Infrastructure Asset Manager.” TU Delft Repositories. https://repository.tudelft.nl/islandora/object/uuid%3Ae7fcf310-749f-4e4e-bbab-78eef99d0342
  • Wijnia, Ype, and John de Croon. 2015. The Asset Management Process Reference Model for Infrastructures.” Cham: Springer. doi:10.1007/978-3-319-15536-4_35.
  • Williams, Zachary, Jason E. Lueg, Ronald D. Taylor, and Robert L. Cook. 2009. “Why All the Changes?: An Institutional Theory Approach to Exploring the Drivers of Supply Chain Security (SCS).” International Journal of Physical Distribution & Logistics Management 39 (7): 595–618. doi:10.1108/09600030910996279.
  • Yadav, Vinod, Rakesh Jain, Murari Lal Mittal, Avinash Panwar, and Milind Kumar Sharma. 2019. “An Appraisal on Barriers to Implement Lean in SMEs.” Journal of Manufacturing Technology Management 30 (1): 195–212. doi:10.1108/JMTM-12-2017-0262.
  • Zaramdini, Walid. 2007. “An Empirical Study of the Motives and Benefits of ISO 9000 Certification: The UAE Experience.” International Journal of Quality & Reliability Management 24 (5): 472–491. doi:10.1108/02656710710748358.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.