Publication Cover
Production Planning & Control
The Management of Operations
Volume 35, 2024 - Issue 10
632
Views
9
CrossRef citations to date
0
Altmetric
Research Articles

Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach

ORCID Icon & ORCID Icon
Pages 1164-1179 | Received 03 Dec 2021, Accepted 25 Dec 2022, Published online: 03 Jan 2023

References

  • Abbasi, Omid, Esmatullah Noorzai, Kobra Gharouni Jafari, and Mahmood Golabchi. 2020. “Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran.” Journal of Architectural Engineering 26 (3), 431. doi:10.1061/(ASCE)AE.1943-5568.0000431.
  • Abdul-Rahman, H., M. A. Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. 2006. “Delay Mitigation in the Malaysian Construction Industry.” Journal of Construction Engineering and Management 132 (2): 125–133. doi:10.1061/(ASCE)0733-9364(2006)132:2(125).
  • Abowitz, Deborah A., and T. Michael Toole. 2010. “Mixed Method Research: Fundamental Issues of Design, Validity, and Reliability in Construction Research.” Journal of Construction Engineering and Management 136 (1): 108–116. doi:10.1061/(ASCE)CO.1943-7862.0000026.
  • Almuntaser, Taqiadden, Muizz O. Sanni-Anibire, and Mohammad A. Hassanain. 2018. “Adoption and Implementation of BIM – Case Study of a Saudi Arabian AEC Firm.” International Journal of Managing Projects in Business 11 (3): 608–624. doi:10.1108/IJMPB-05-2017-0046.
  • Alnuaimi, Ali S., Ramzi A. Taha, Mohammed Al Mohsin, and Ali S. Al-Harthi. 2010. “Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman.” Journal of Construction Engineering and Management 136 (5): 615–622. doi:10.1061/(ASCE)CO.1943-7862.0000154.
  • Alzebdeh, K., H. A. Bashir, and S. K. Al Siyabi. 2015. “Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman.” The Journal of Engineering Research 12 (1): 53–68. doi:10.24200/tjer.vol12iss1pp53-68.
  • Arantes, Amílcar, and Luis Miguel D. F. Ferreira. 2020. “Underlying Causes and Mitigation Measures of Delays in Construction Projects an Empirical Study.” Journal of Financial Management of Property and Construction 25 (2): 165–181. doi:10.1108/JFMPC-03-2019-0029.
  • Arantes, Amílcar, and Luis Miguel D. F. Ferreira. 2021. “A Methodology for the Development of Delay Mitigation Measures in Construction Projects.” Production Planning & Control 32 (3): 228–241. doi:10.1080/09537287.2020.1725169.
  • Arantes, Amílcar, Luís Miguel D. F. Ferreira, and António Aguiar Costa. 2015. “Is the Construction Industry Aware of Supply Chain Management? The Portuguese Experience.” Supply Chain Management 20 (4): 404–414. doi:10.1108/SCM-06-2014-0207.
  • Asiedu, Richard Ohene, Ebenezer Adaku, and De-Graft Owusu-Manu. 2017. “Beyond the Causes: Rethinking Mitigating Measures to Avert Cost and Time Overruns in Construction Projects.” Construction Innovation 17 (3): 363–380. doi:10.1108/CI-01-2016-0003.
  • Assaf, Sadi A., and Sadiq Al-Hejji. 2006. “Causes of Delay in Large Construction Projects.” International Journal of Project Management 24 (4): 349–357. doi:10.1016/j.ijproman.2005.11.010.
  • Banco de Portugal. 2021. “Análise Do Setor Da Construção.” Estudo Da Central de Balanços. Accessed December 6 2021. https://bpstat.bportugal.pt/conteudos/publicacoes/1304
  • Bashir, Hamdi, Udechukwu Ojiako, and Caroline Mota. 2020. “Modeling and Analyzing Factors Affecting Project Delays Using an Integrated Social Network-Fuzzy MICMAC Approach.” Engineering Management Journal 32 (1): 26–36. doi:10.1080/10429247.2019.1656595.
  • Braglia, M., and M. Frosolini. 2014. “An Integrated Approach to Implement Project Management Information Systems within the Extended Enterprise.” International Journal of Project Management 32 (1): 18–29. doi:10.1016/j.ijproman.2012.12.003.
  • Chai, Chang Saar, Aminah Md Yusof, Hadina Habil. 2015. “Delay Mitigation in the Malaysian Housing Industry: A Structural Equation Modelling Approach.” Journal of Construction in Developing Countries 20 (1): 65–83.
  • Chen, Gui-Xiang, Ming Shan, Albert P. C. Chan, Xu Liu, and Yi-Qing Zhao. 2019. “Investigating the Causes of Delay in Grain Bin Construction Projects: The Case of China.” International Journal of Construction Management 19 (1): 1–14. doi:10.1080/15623599.2017.1354514.
  • Doloi, Hemanta. 2013. “Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects.” Journal of Construction Engineering and Management 139 (3): 267–279. doi:10.1061/(ASCE)CO.1943-78620000621.
  • Doloi, Hemanta, Anil Sawhney, K. C. Iyer, and Sameer Rentala. 2012. “Analysing Factors Affecting Delays in Indian Construction Projects.” International Journal of Project Management 30 (4): 479–489. doi:10.1016/j.ijproman.2011.10.004.
  • Doloi, Hemanta, Anil Sawhney, and K. C. Iyer. 2012. “Structural Equation Model for Investigating Factors Affecting Delay in Indian Construction Projects.” Construction Management and Economics 30 (10): 869–884. doi:10.1080/01446193.2012.717705.
  • Duperrin, Jean-Claude, and Michel Godet. 1973. “Méthode de Hiérarchisation Des Éléments d’un Système: Essai de Prospective Du Système de l’énergie Nucléaire Dans Son Contexte Sociétal.” Gif-sur-Yvette, France. https://hal-lara.archives-ouvertes.fr/hal-02185432.
  • El-Sayegh, Sameh, Irtishad Ahmad, Malak Aljanabi, Rawan Herzallah, Samuel Metry, and Omar El-Ashwal. 2020. “Construction Disputes in the UAE: Causes and Resolution Methods.” Buildings 10 (10): 171. doi:10.3390/buildings10100171.
  • Ellegaard, Chris, Lena E. Bygballe, Anna Dubois, and Lars Bankvall. 2010. “Purchasing and Supply Management in the Construction Industry.” Journal of Purchasing and Supply Management 16 (4): 219–220. doi:10.1016/j.pursup.2010.09.004.
  • Enshassi, Adnan, Jomah Al-Najjar, and Mohan Kumaraswamy. 2009. “Delays and Cost Overruns in the Construction Projects in the Gaza Strip.” Journal of Financial Management of Property and Construction 14 (2): 126–151. doi:10.1108/13664380910977592.
  • Faridi, Arshi Shakeel, and Sameh Monir El-Sayegh. 2006. “Significant Factors Causing Delay in the UAE Construction Industry.” Construction Management and Economics 24 (11): 1167–1176. doi:10.1080/01446190600827033.
  • Frimpong, Yaw, Jacob Oluwoye, and Lynn Crawford. 2003. “Causes of Delay and Cost Overruns in Construction of Groundwater Projects in a Developing Countries; Ghana as a Case Study.” International Journal of Project Management 21 (5): 321–326. doi:10.1016/S0263-7863(02)00055-8.
  • Gan, Xiaolong, Ruidong Chang, Jian Zuo, Tao Wen, and George Zillante. 2018. “Barriers to the Transition towards off-Site Construction in China: An Interpretive Structural Modeling Approach.” Journal of Cleaner Production 197: 8–18. doi:10.1016/j.jclepro.2018.06.184.
  • Gündüz, Murat, Yasemin Nielsen, and Mustafa Özdemir. 2013. “Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey.” Journal of Management in Engineering 29 (2): 133–139. doi:10.1061/(ASCE)ME.1943-5479.0000129.
  • Hasan, Abid, and Kumar Neeraj Jha. 2016. “Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India.” Journal of Construction Engineering and Management 142 (2): 04015064. doi:10.1061/(ASCE)CO.1943-7862.0001048.
  • Jalal, Majid, and Shahab Shoar. 2017. “A Hybrid SD-DEMATEL Approach to Develop a Delay Model for Construction Projects.” Engineering, Construction and Architectural Management 24 (4): 629–651. doi:10.1108/ECAM-02-2016-0056.
  • Kim, Soo-Yong, Kiet Nguyen Tuan, and Van Truong Luu. 2016. “Delay Factor Analysis for Hospital Projects in Vietnam.” KSCE Journal of Civil Engineering 20 (2): 519–529. doi:10.1007/s12205-015-0316-1.
  • Kitzinger, Jenny. 1995. “Qualitative Research: Introducing Focus Groups.” BMJ 311 (7000): 299–302. doi:10.1136/bmj.311.7000.299.
  • Kog, Yue Choong. 2019. “Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam.” Practice Periodical on Structural Design and Construction 24 (3), 434. doi:10.1061/(ASCE)SC.1943-5576.0000434.
  • Li, Dezhi, Xin Li, Haibo Feng, Yan Wang, and Shushu Fan. 2022. “ISM-Based Relationship among Critical Factors That Affect the Choice of Prefabricated Concrete Buildings in China.” International Journal of Construction Management 22 (6): 977–992. doi:10.1080/15623599.2019.1675306.
  • Liu, Hui, Miroslaw J. Skibniewski, and Mengjun Wang. 2015. “Identification and Hierarchical Structure of Critical Success Factors for Innovation in Construction Projects: Chinese Perspective.” Journal of Civil Engineering and Management 22 (3): 401–416. doi:10.3846/13923730.2014.975739.
  • Lohana, Yash Kanhaiya. 2021. “ISM and MICMAC Model for Construction Delay.” International Research Journal of Engineering and Technology 8 (1): 1382–1391.
  • Love, Peter E. D., Jim Smith, Fran Ackermann, Zahir Irani, and Pauline Teo. 2018. “The Costs of Rework: Insights from Construction and Opportunities for Learning.” Production Planning & Control 29 (13): 1082–1095. doi:10.1080/09537287.2018.1513177.
  • Ma, Guofeng, Jianyao Jia, Jiyong Ding, Shanshan Shang, and Shan Jiang. 2019. “Interpretive Structural Model Based Factor Analysis of BIM Adoption in Chinese Construction Organizations.” Sustainability 11 (7): 1982. doi:10.3390/su11071982.
  • Magalhães, Vanessa S. M., Luis Miguel, D. F. Ferreira, and Cristóvão Silva. 2021. “Using a Methodological Approach to Model Causes of Food Loss and Waste in Fruit and Vegetable Supply Chains.” Journal of Cleaner Production 283: 124574. doi:10.1016/j.jclepro.2020.124574.
  • Marshall, Catherine, and Gretchen B. Rossman. 2015. Designing Qualitative Research. Sixth Edit. London: SAGE Publications.
  • Mishra, Nishikant, Akshit Singh, Nripendra P. Rana, and Yogesh K. Dwivedi. 2017. “Interpretive Structural Modelling and Fuzzy MICMAC Approaches for Customer Centric Beef Supply Chain: Application of a Big Data Technique.” Production Planning & Control 28 (11–12): 945–963. doi:10.1080/09537287.2017.1336789.
  • Mohamed, Khaled A., Shafik S. Khoury, and Sherif M. Hafez. 2011. “Contractor’s Decision for Bid Profit Reduction within Opportunistic Bidding Behavior of Claims Recovery.” International Journal of Project Management 29 (1): 93–107. doi:10.1016/j.ijproman.2009.12.003.
  • Morgan, David L. 1996. “Focus Groups.” Annual Review of Sociology 22 (1): 129–152. doi:10.1146/annurev.soc.22.1.129.
  • Mousli, Mohamad Hazem A. L., and Sameh Monir El-Sayegh. 2016. “Assessment of the Design-Construction Interface Problems in the UAE.” Architectural Engineering and Design Management 12 (5): 353–366. doi:10.1080/17452007.2016.1187111.
  • Mpofu, Bekithemba, Edward Godfrey Ochieng, Cletus Moobela, and Adriaan Pretorius. 2017. “Profiling Causative Factors Leading to Construction Project Delays in the United Arab Emirates.” Engineering, Construction and Architectural Management 24 (2): 346–376. doi:10.1108/ECAM-05-2015-0072.
  • Nassar-McMillan, Sylvia, and L. Borders. 2002. “Use of Focus Groups in Survey Item Development.” The Qualitative Report 7 (1): 1–12. http://nsuworks.nova.edu/tqr/vol7/iss1/3.
  • Odeh, M., and H. T. Battaineh. 2002. “Causes of Construction Delay: Traditional Contracts.” International Journal of Project Management 20 (1): 67–73. doi:10.1016/S0263-7863(00)00037-5.
  • Oyegoke, Adekunle Sabitu, and Naseer Al Kiyumi. 2017. “The Causes, Impacts and Mitigations of Delay in Megaprojects in the Sultanate of Oman.” Journal of Financial Management of Property and Construction 22 (3): 286–302. doi:10.1108/JFMPC-11-2016-0052.
  • PMI. 2019. A Guide to the Project Management Body of Knowledge (PMBOK Guide). 6th ed. Pennsylvania, USA, USA: Project Management Institute, Inc.
  • Prasad, K. V V., V. Vasugi, R. Venkatesan, and Nikhil S. Bhat. 2019. “Critical Causes of Time Overrun in Indian Construction Projects and Mitigation Measures.” International Journal of Construction Education and Research 15 (3): 216–238. doi:10.1080/15578771.2018.1499569.
  • Prince, Mel, and Mark Davies. 2001. “Moderator Teams: An Extension to Focus Group Methodology.” Qualitative Market Research: An International Journal 4 (4): 207–216. doi:10.1108/EUM0000000005902.
  • Ruqaishi, Mohammed, and Hamdi A. Bashir. 2015. “Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study.” Journal of Management in Engineering 31 (3): 05014017. doi:10.1061/(ASCE)ME.1943-5479.0000248.
  • Sarhan, Jamil Ghazi, Bo Xia, Sabrina Fawzia, Azharul Karim, Ayokunle Olubunmi Olanipekun, and Vaughan Coffey. 2019. “Framework for the Implementation of Lean Construction Strategies Using the Interpretive Structural Modelling (ISM) Technique: A Case of the Saudi Construction Industry.” Engineering, Construction and Architectural Management 27 (1): 1–23. doi:10.1108/ECAM-03-2018-0136.
  • Segerstedt, Anders, and Thomas Olofsson. 2010. “Supply Chains in the Construction Industry.” Supply Chain Management 15 (5): 347–353. doi:10.1108/13598541011068260.
  • Senna, Pedro P., Luís Miguel, D. F. Ferreira, Ana C. Barros, Jaime Bonnín, and Vanessa Magalhães. 2022. “Prioritizing Barriers for the Adoption of Industry 4. 0 Technologies.” Computers & Industrial Engineering 171: 108428. doi:10.1016/j.cie.2022.108428.
  • Shen, Liyin, Xiangnan Song, Ya Wu, Shiju Liao, and Xiaoling Zhang. 2016. “Interpretive Structural Modeling Based Factor Analysis on the Implementation of Emission Trading System in the Chinese Building Sector.” Journal of Cleaner Production 127: 214–227. doi:10.1016/j.jclepro.2016.03.151.
  • Shrivas, Abhishek, and Harish Kumar Singla. 2022. “Analysis of Interaction among the Factors Affecting Delay in Construction Projects Using Interpretive Structural Modelling Approach.” International Journal of Construction Management 22 (8): 1455–1463. doi:10.1080/15623599.2020.1728486.
  • Sushil. 2012. “Interpreting the Interpretive Structural Model.” Global Journal of Flexible Systems Management 13 (2): 87–106. doi:10.1007/S40171-012-0008-3.
  • Tan, Tan., Ke Chen, Fan Xue, and Weisheng Lu. 2019. “Barriers to Building Information Modeling (BIM) Implementation in China’s Prefabricated Construction: An Interpretive Structural Modeling (ISM) Approach.” Journal of Cleaner Production 219: 949–959. doi:10.1016/j.jclepro.2019.02.141.
  • Wang, Chen, Jeffrey Boon Hui Yap, Lincoln C. Wood, and Hamzah Abdul-Rahman. 2019. “Knowledge Modelling for Contract Disputes and Change Control.” Production Planning & Control 30 (8): 650–664. doi:10.1080/09537287.2019.1572247.
  • Warfield, John N. 1974. “Developing Subsystem Matrices in Structural Modeling.” IEEE Transactions on Systems, Man, and Cybernetics SMC-4 (1): 74–80. doi:10.1109/TSMC.1974.5408523.
  • Wu, Wei-Shing, Chen-Feng Yang, Jung-Chuan Chang, Pierre-Alexandre Château, and Yang-Chi Chang. 2015. “Risk Assessment by Integrating Interpretive Structural Modeling and Bayesian Network, Case of Offshore Pipeline Project.” Reliability Engineering & System Safety 142: 515–524. doi:10.1016/j.ress.2015.06.013.
  • Xu, Xiaoxiao, and Patrick X. W. Zou. 2020. “Analysis of Factors and Their Hierarchical Relationships Influencing Building Energy Performance Using Interpretive Structural Modelling (ISM) Approach.” Journal of Cleaner Production 272: 122650. doi:10.1016/j.jclepro.2020.122650.
  • Yap, Jeffrey Boon Hui., Hamzah Abdul-Rahman, and Wang Chen. 2017. “Collaborative Model: Managing Design Changes with Reusable Project Experiences through Project Learning and Effective Communication.” International Journal of Project Management 35 (7): 1253–1271. doi:10.1016/j.ijproman.2017.04.010.
  • Yap, Jeffrey Boon Hui., Hamzah Abdul-Rahman, and Chen Wang. 2018. “Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach.” Journal of Construction Engineering and Management 144 (5): 04018025. doi:10.1061/(ASCE)CO.1943-7862.0001456.
  • Yap, Jeffrey Boon Hui., Pei Ling Goay, Yoke Bee Woon, and Martin Skitmore. 2021. “Revisiting Critical Delay Factors for Construction: Analysing Projects in Malaysia.” Alexandria Engineering Journal 60 (1): 1717–1729. doi:10.1016/j.aej.2020.11.021.
  • Zewdu, Zinabu Tebeje. 2016. “Construction Projects Delay and Their Antidotes: The Case of Ethiopian Construction Sector.” International Journal of Business and Economics Research 5 (4): 113. doi:10.11648/j.ijber.20160504.16.
  • Zidane, Youcef J. T., and Bjorn Andersen. 2018. “The Top 10 Universal Delay Factors in Construction Projects.” International Journal of Managing Projects in Business 11 (3): 650–672. doi:10.1108/IJMPB-05-2017-0052.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.