Publication Cover
Production Planning & Control
The Management of Operations
Volume 1, 1990 - Issue 4
11
Views
2
CrossRef citations to date
0
Altmetric
Research papers

The effects of transportation lead-time and safety stock in international co-operative knockdown production systems

, , &
Pages 209-221 | Published online: 03 Apr 2007

References

  • G. R. BITRAN and L. CHANG , 1987 , A maethematical programming approach to a deterministic kanban system Management Science , 33 , 427 – 441
  • R. G. BROWN , 1959 , Statistical Forecasting for Inventory Control New York McGraw-Hill
  • A. C. HARVEY , 1981 , Time Series Models Oxford Philip Alan
  • S. HIRAKI , T. ICHIMURA , K. ISHII , T. NAGAMURA , Y. ANDO , K. TAKAHASHI and R. MURAMATSU , 1989 , Low inventroy ordering systems for the international co-operative knockdown production systems International Journal of Production Research , 831 – 846
  • P. Y. HUANG , L. P. REES and B. W. TAYLOR, III , 1983 , A simulation nalysis of the Japanese just-in-time technique (with kanbans) for a multiline, multistage production system Decision Sciences , 14 , 326 – 344
  • O. KUMURA and H. TERADA , 1981 , Design and analysis of pull systesm, a mehtod of multi-stage production control International Journal of Porduction Research , 19 , 241 – 253
  • L. KRAJEWSKI , B. E. KING , L. P. RITMAN and D. S. WONG , 1987 , Kanban, MRP, and shaping the manufaacturing environment Management Science , 33 , 39 – 57
  • G. A. MIHRAN , 1972 , Simulation: Statistical Foundation and Methodology New York Academic Press
  • R. MURAMATSU , 1979 , Pirnciples of Production Planning and Control Tokyo Kunimoto Shobo
  • R. MURAMASTU , K. ISHI and K. TAKAHASHI , 1985 , Some ways to inverase flexibility in manufacturing systems International Journal of Production Research , 23 , 691 – 703
  • B. R. SARKER and R. D. HARRIS , 1988 , The effect of imbalance in a just-in-time production system: a simulation study International Journal of Production Research , 26 , 1 – 18
  • M. SOSHIRODA , 1971 , A study on the variances of the ordering and inventory levels in theperiodic ordering system department of Industial Engineering, Waseda University Ph.D. thesis
  • T. SUGIMORI , K. KUSUNOKI , F. CHO and S. UCHIKAWA , 1977 , Toyota production system and kanban system: materialization of just-in-time and respect-for-human system International Journal of Production Research , 16 , 553 – 564
  • T. TABE , R. MURAMATSU and Y. TANAKA , 1980 , An analysis of production ordering queantities and invertory variations in muti-stage production ordering system International Journal of Production Research , 18 , 245 – 257

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.