References
- CHILD , P. , DIEDERICHS , R. , SANDERS , F.-H. , and WISNIOWSKI , S. , 1991 , The management of complexity. Sloan Management Review , 32 , 73 – 79 .
- COHEN , M. A. , and LEE , H. L. , 1988 , Strategic analysis of integrated production-distribution systems: models and methods. Operations Research , 36 , 216 – 228 .
- DAVIS , T. , 1993 , Effeetivc supply chain management. Sloan Management Review , 34 , 35 – 46 .
- EPPEN , G. , and SCHRAGE , L. , 1981 , Centralized ordering policies in a multi-warehouse system with lead times and random demand. In L. B. Schwarz (ed.) Multi-Level Production/Inventry Systems: Theory and Practice , ( North Holland , Amsterdam ), pp. 51 – 67 .
- FULLER , J. B. , O'CONOR , J. , and RAWLINSON , R. , 1993 , Tailored logistics: the next advantage. Harvard Business Review , 71 , 87 – 98 .
- HOEKSTRA , S. , and ROMME , J. , 1992 , Integral Logistic Structures Developing Customer-Oriented Goods Flow , ( Industrial Press, New York ), Section 1.5.
- JOHNSON , E. L. , LEE , H. L. , DAVIS , T. , and HALL , R. , 1994 , Expressions for item fill rates in periodic inventory systems. Naval Research Logistics , in press.
- JONES , T. C. , and RILEY , D. W. , 1985 , Using inventory for competitive advantage through supply chain management. International Journal cf Ptiysical Distribution and Materials Management , 15 , 16 – 26 .
- LEE , H. L. , 1987 , A multi-echelon inventory model for repairable items with emergency lateral transshipment. Management Science , 33 , 1302 – 1316 .
- LEE , H. L. , 1993 , Design for supply chain management: concepts and examples. In R Sarin (ed.) Perspectives in Operations Management , ( Kluwer, Boston ), pp. 43 – 65 .
- LEE , H. L. , and BILLINGTON , C. , 1992 , Managing supply chain inventory: pitfallsand opportunities. Sloan Management Review , 33 , 65 – 73 .
- LEE , H. L. , and BILLINGTON , C. , 1993 , Material management in decentralized supply chains. Operations Research , 41 , 835 – 847 .
- LEE , H. L. , BILLINGTON , C. , and CARTER , B. , 1993 , Hewlett-Packard gains control of inventory and service through design for localization. Interfaces , 23 , 1 – 11 .
- LEE , H. L. , 1994 , Effective management of inventory and service through product and process redesign. Operations Research , in press.
- LEE , H. L. , and BILLINGTON , C. , 1994 , Designing products and processes for postponement. In S. Dasu and C. Eastman (eds) Management of Design: Engineering and Management Perspectives , ( Kluwer, Boston ), pp. 105 – 122 .
- LEE , H. L. , and TANG , C. S. , 1994 , Modelling the costs and benefits of delayed product differentiation. Management Science , submitted for publication.
- NAHMIAS , S. , 1989 , Production and Operations Analysis , ( Irwin, Homewood , IL ).
- SCHWARZ , L. B. , 1989 , Model for assessing the value of warehouse risk-pooling: risk-pooling over outside-supplier leadtimes. Management Science , 35 , 828 – 842 .