References
- BEJA , A. , 1977 , Optimal reject allowance with constant marginal production efficiency. Naval Research Logistics Quarterly , 24 , 21 – 33 .
- BOWMAN , E. H. , and FETTER , R. B. , 1961 , Analysis for Production Management , ( Richard D. Irwin, Boston ).
- GOODE , H. P. , and SALTZMAN , S. , 1961 , Computing optimal shrinkage allowance for small order sizes. Journal of Industrial Engineering , 12 , 57 – 61 .
- GRECORY , W. R. , and BEGED–Dov , A. , 1967, On the determination of optimal shrinkage allowance in a job shop. Journal of Industrial Engineering , 18, 284–288.
- GROSFELD–NIR , A. , and RONEN , B. , 1993 , A single bottleneck system with binomial yields and rigid demand. Management Science , 39 , 650 – 653 .
- GUPTA , S. M. , and BRENNAN , L. , 1994 , Lead time uncertainty with back-ordering in multi-level product structures. Computers and Industrial Engineering , 26 , 267 – 278 .
- HICSETH , M. A , 1984 , The challenge of operation yield. Production and Inventory Management , 25 , 4 – 10 .
- HILLIER , F. S. , 1963 , Reject allowance for job lot orders. Journal of Industrial Engineering, 14 , 311 – 316 .
- KURTULUS , I. S. , 1994 , A statistical analysis ofyield loss in materials requirement planning systems. Working Paper, VCU, School of Business, Decision Sciences Area.
- KURTULUS , I. S. , and PENTICO , D. W. , 1985 , Planning for MRP lot sizes when there is scrap loss. In B. Hartman and J. Ringuest (eds) National AIDS Proceedings , Las Vegas , 863 – 865 .
- KURTULUS , I. S. , and PENTICO , D. W. , 1988 , Materials requirement planning when there is scrap loss. Production and Inventory Management Journal , 29 ( 2 ), 18 – 21 .
- LEE , H. L. , and YANO , C. A. , 1988 , Production control in multi-stage systems with variable yield losses. Operations Research , 36 , 269 – 278 .
- LEVITAN , R. E. , 1960 , The optimal reject allowance problem. Management Science , 6 , 172 – 186 .
- MANCIAMELI , P. M. , and KRAJEWSKI , L. T. , 1983 , The effects of workforce strategies on manufacturing operations. Journal of Operations Management , 3 , 183 – 196 .
- MARLIN , P. G. , 1986 , Manufacturing lead time accuracy , Journal of Operations Management , 6 , 179 – 202 .
- New , C. , 1975 , Safety stock for requirements planning. Production and Inventory Management , 16 , 1 – 18 .
- NEW , C. , and MAPES , T. , 1984 , MRP with high uncertain yield losses. Journal qf Operations Management , 4 , 315 – 330 .
- NILAND , P. , 1970 , Production Planning Scheduling and Inventory Control , ( MacMillan, London ).
- ORLlCKY , j. , 1975 , Materials Requirement Planning , ( McGraw Hill, New York ).
- PENTICO , W. D. , 1988 , An evaluation and proposed modification of the Sepehri-Silver-New Heuristic for multiple lot sizing under variable yield. IEE Transactions , 20 , 360 – 363 .
- SASINSTITUTE INC., 1992 , SAS USER'S Guide ( SAS Institute , Raleigh ).
- SEPEHRI , M. , SILVER , E. , and Nsw , C. , 1986 , A heuristic for multiple lot sizing for an order under variable yield. , IEE Transactions , 18 , 63 – 69 .
- STEELE , D. C. , 1977 , The nervous MRP systems: how to battle. In W. E. Goddard (ed.) Master Production Reprints, APICS , Washington , D.C. , 176 – 181 .
- TANG , C. S. , 1990 , The impact of uncertainty on a production line. Management Science , 36 , 1518 – 1531 .
- WADSWORTH , H. M. , and CHANG , S. H. , 1964 , The reject allowance problem: an analysis and application to job lot production. Journal qf Industrial Engineering , 15 , 711 – 715 .
- WEIN , A. S. , 1992 , Random yield, rework and scrap in a multi-stage batch manufacturing environment. Operations Research , 40 , 551 – 563 .
- WEMMERLOW , U. , 1984 , Assemble-to-order manufacturing: implications for materials management. Journal of Operations Management , 4 , 347 – 368 .
- WHYBARK , D. C. , and WILUAMS , J. G. , 1976 , Materials requirement planning under uncertainty. Decision Sciences , 7 , 595 – 606 .