References
- ARBEL , A. , and SEIDMANN , A. , 1984 , Performance evaluation of flexible manufacturing systems. IEEE Transaction on System, Man and Cybernetics , 14 , 606 – 617 .
- BITRAN , G. R. , and CHANG , L. , 1987 , A mathematical programming approach to a deterministic Kanban system. Management Science , 33 , 427 – 441 .
- BUZACOTT , J. A. , 1982 , Optimal operating rules for automated manufacturing systems. IEEE Transaction on Automatic Control , 27 , 80 – 86 .
- FRIEDMAN L. , GOLENKO–GINZBURG , D. , and SINUANY–STERN , Z. , 1989 , Determining control points of a production system under a chance constraint. Engineering Cost and Production Economics , 18 , 139 – 144 .
- FRIEDMAN , L. , GOLENKO–GINZBURG , D. , and SINUANYSTERN , Z. , 1993, Semiautomated production systems under disturbances. Journal of Operational Research Society , 442, 161–168.
- GOLENKO–GINZBURG , D. , FRIEDMAN , L. , and SINUANY–STERN , Z. , 1989 , Feeding parts with random production speed to an assembly line. Engineering Costs and Production Economics , 16 , 91 – 96 .
- GOLENKO–GINZBURG , D. , and SINUANY–STERN , Z. , 1989 , Production control with various speeds and inspection points. Intemational Joumal of Production Research , 27 , 629 – 636 .
- HEYMAN , D. P. , and SOBeL , M. J. , 1984 , Stochastic Models in Operations Research , ( McGraw-Hill, : New York ).
- LINN , R. J , and WYSK , R. A. , 1987 , An analysis of control strategies for an automated storage/retrieval system. , INFOR, 25 , 66 – 83 .
- MAXWELL , W. , MUCKSTADT , J. , THOMAS , J. , and VANDEER EECKENN , J. , 1983 , A modeling framework for planning and control of production in discrete parts. Manufacturing andAssembly Systems Interfaces , 13 , 92 – 104 .
- SEIDMANN , A. , 1988 , Intelligent control schemes for automated storage and retrieval systems , lnternational Journal of Production Research , 26 , 931 – 952 .
- SEIDMANN , A. , and SCHWETZER , P. , 1984 , Part selection policy for a flexible manufacturing cell feeding several production lines. lIE Transactions , 16 , 355 – 361 .
- SELLERS , C. J. , and NOF , S. Y. , 1986 , Part kitting in robotic facilities. In S. Y. Nof (ed.) Robotics andMaterial Flow , ( Elsevier, Amsterdam ), pp. 163 – 174 .
- SINUANY–STERN , Z. , COLENKO–GINZBURG , D. , and KEREN , B. , 1989 , A static adaptive approach for solving a dynamic problem of production control. In P. Cavil (ed.) ESC89 Proceedings of the 3rd European Simulation Congress , ( Edinburgh ), pp. 508 – 511 .