Grid extension in German backyards: a game-theory rationale

Pages 437-461 | Received 18 Aug 2015, Accepted 25 Feb 2016, Published online: 07 Jun 2016

References

  • Alidaee, B. 1999. “Three-Person Spanning Tree Games.” Mathematical and Computer Modelling 29 (1): 107–123.
  • André, F.J., and L. Riesgo. 2007. “A Non-Interactive Elicitation Method for Non-Linear Multiattribute Utility Functions: Theory and Application to Agricultural Economics.” European Journal of Operational Research 181 (2): 793–807.
  • Barth, R., C. Weber, and D. Swider. 2008. “Distribution of Costs Induced by the Integration of RES-E Power.” Energy Policy 36 (8): 3107–3115.
  • Battaglini, A., N. Komendantova, P. Brtnik, and A. Patt. 2012. “Perception of Barriers for Expansion of Electricity Grids in the European Union.” Energy Policy 47 (8): 254–259.
  • Bhakar, R., V.S. Sriram, N.P. Padhy, and H.O. Gupta. 2010. “Probabilistic Game Approaches for Network Cost Allocation.” IEEE Transaction on Power Systems 25 (1): 51–58.
  • Bird, C.G. 1976. “On Cost Allocation for a Spanning Tree: A Game Theoretic Approach.” Network 6 (4): 335–350.
  • Ciupuliga, A.R., and E. Cuppen. 2013. “The Role of Dialogue in Fostering Acceptance of Transmission Lines: The Case of a France-Spain Interconnection Project.” Energy Policy 60 (9): 224–233.
  • Claus, A., and D.J. Kleitman. 1973. “Cost Allocation for Spanning Tree.” Network 3 (4): 289–304.
  • Contreras, J., G. Gross, J.M. Arroyo, and J.I. Muñoz. 2009. “An Incentive-Based Mechanism for Transmission Asset Investment.” Decision Support Systems 47 (1): 22–31.
  • Curiel, I. 1997. Cooperative Game Theory and Applications: Cooperative Games Arising from Combinatorial Optimization Problems. Boston, MA: Kluwer Academic Publishers.
  • Dehmer, D. 2013. “The German Energiewende: The First Year.” The Electricity Journal 26 (1): 71–78.
  • EGCO (Electricity Grid Charges Ordinance). 2015. Stromnetzentgeltverordnung in the Version of 21.12.2015.
  • Energy Industry Act (EIA). 2015. Energiewirtschaftsgesetz in the version of 21.12.2015.
  • Erli, G., K. Takahasi, L. Chen, and I. Kurihara. 2005. “Transmission Expansion Cost Allocation Based on Cooperative Game Theory for Congestion Relief.” Electrical Power and Energy Systems 27 (1): 61–67.
  • Estévez-Fernández, A., and H. Reijnierse. 2014. “On the Core of Cost-Revenue Games: Minimum Cost Spanning Tree Games With Revenues.” European Journal of Operational Research 237 (2): 606–616.
  • Evans, F., J.M. Zolezzi, and H. Rudnick. 2003. “Power System Analysis, Computing, and Economics – Cost Assignment Model for Electrical Transmission System Expansion: An Approach Through the Kernel Theory.” IEEE Transactions on Power Systems 18 (2): 625–632.
  • FDPA (Federal Demand Planning Act). 2015. Bundesbedarfsplangesetz in the Version of 21.12.2015.
  • FNA (Federal Network Agency). 2015. EnLAG-Monitoring. Stand des Ausbaus nach dem Energieleitungsausbaugesetz (EnLAG) zum dritten Quartal 2015 [EnLAG-Monitoring. Current Status of the Extension According to the Law on Energy Line Extension at the Third Quarter 2015].
  • FNA (Federal Network Agency). 2013. Plan for the Extension of the Electricity Grid Confirmed by the Federal Network Agency 2013 (Bestätigung Netzentwicklungsplan Strom 2013).
  • Feldman, S., and D. Turner. 2014. “Why not NIMBY?” Ethics, Policy and Environment 17 (1): 105–115.
  • Fiestras-Janeiro, M., I. García-Jurado, and M. Mosquera. 2011. “Cooperative Games and Cost Allocation Problems.” TOP 19 (1): 1–22.
  • Fürsch, M., S. Hagspiel, C. Jägermann, S. Nagl, D. Lindenberger, and E. Tröster. 2013. “The Role of Grid Extensions in a Cost-Efficient Transformation of the European Electricity System Until 2050.” Applied Energy 104 (4): 642–652.
  • Furuseth, O.J., and J. O'Callaghan. 1991. “Community Response to a Municipal Waste Incinerator: NIMBY or Neighbour?” Landscape and Urban Planning 21 (3): 163–171.
  • GRESA (German Renewable Energy Sources Act) 2015. Erneuerbare-Energien-Gesetz in the Version of 21.12.2015.
  • Granot, D., and G. Huberman. 1984. “On the Core and the Nucleolus of Minimum Cost Spanning Tree Games.” Mathematical Programming 29 (3): 323–347.
  • Haggett, C. 2011. “Understanding Public Responses to Offshore Wind Power.” Energy Policy 39 (2): 503–510.
  • Hasan, K.N., T.K. Saha, D. Chattopadhyay, and M. Eghbal. 2014. “Benefit-Based Expansion Cost Allocation for Large Scale Remote Renewable Power Integration Into Australian Grid.” Applied Energy 113 (1): 836–847.
  • IRO (Incentive Regulation Ordinance) 2015. Anreizregulierungsverordnung in the Version of 21.12.2015.
  • Jami, A., and P.R. Walsh. 2014. “The Role of Public Participation in Identifying Stakeholder Synergies in Wind Power Project Development: The Case Study of Ontario, Canada.” Renewable Energy 68 (8): 194–202.
  • Jegen, M., and G. Audet. 2011. “Advocacy Coalitions and Wind Power Development: Insights from Quebec.” Energy Policy 39 (11): 7439–7447.
  • Jene, S., and S. Zelewski. 2011. “Fair Distribution of Added Values in Networks of Autonomous Actors.” In Modelling Value – Vol. II, edited by H. Jodlbauer, J. Olhager, and R.J. Schonberger, 317–337. Aachen: Shaker.
  • Jia, N.X., and R. Yokoyama. 2003. “Profit Allocation of Independent Power Producers Based on Cooperative Game Theory.” Electrical Power and Energy Systems 25 (8): 633–642.
  • Jobert, A., P. Laborgne, and S. Mimler. 2007. “Local Acceptance of Wind Energy: Factors of Success Identified in French and German Case Studies.” Energy Policy 35 (5): 2751–2760.
  • Jordan, B.H., and G. Kirkpatrick. 1985. “Florida Amnesty Days: A Hazardous Waste Success Story.” Waste Management and Research 3 (4): 319–323.
  • Jorge, R.S., and E.G. Hertwich. 2014. “Grid Infrastructure for Renewable Power in Europe: The Environmental Cost.” Energy 69 (5): 760–768.
  • Joseph, A.E., and R.A. Kearns. 1996. “Deinstitutionalization Meets Restructuring: The Closure of a Psychiatric Hospital in New Zealand.” Health and Place 2 (3): 179–189.
  • Junqueira, M., L. da Costa, L. Barroso, G. Oliviera, L. Thomé, and M. Pereira. 2007. “An Aumann–Shapley Approach to Allocate Transmission Service Cost Among Network Users in Electricity Markets.” IEEE Transactions on Power Systems 22 (4): 1532–1546.
  • Kalelkar, A.S., and R.E. Brooks. 1978. “Use of Multidimensional Utility Functions in Hazardous Shipment Decisions.” Accident Analysis and Prevention 10 (3): 251–265.
  • Kattuman, P., R. Green, and J. Bialek. 2004. “Allocating Electricity Transmission Costs Through Tracing: A Game Theoretic Rationale.” Operations Research Letters 32 (2): 114–120.
  • Ketterer, J. 2014. “The Impact of Wind Power Generation on the Electricity Price in Germany.” Energy Economics 44 (7): 270–280.
  • Kunreuther, H., P. Kleindorfer, P.J. Knez, and R. Yaksick. 1987. “A Compensation Mechanism for Siting Noxious Facilities: Theory and Experimental Design.” Journal of Environmental Economics and Management 14 (4): 371–383.
  • Laurent-Lucchetti, J., and J. Leroux. 2010. “Lindahl Prices Solve the NIMBY Problem.” Economics Bulletin 30 (3): 2457–2463.
  • Laurent-Lucchetti, J., and J. Leroux. 2011. “Choosing and Sharing.” Games and Economic Behavior 73 (1): 296–300.
  • LELE (Law on Energy Line Extension) 2015. Energieleitungsausbaugesetz in the Version of 21.12.2015.
  • Lima, D.A., J. Contreras, and A. Padilha-Feltrin. 2008. “A Cooperative Game Theory Analysis for Transmission Loss Allocation.” Electric Power Systems Research 78 (2): 264–275.
  • McAfee, R.P., and J. McMillan. 1987. “Auctions and Bidding.” Journal of Economic Literature 25 (2): 699–738.
  • Minehart, D., and Z. Neeman. 2002. “Effective Siting of Waste Treatment Facilities.” Journal of Environmental Economics and Management 43 (2): 303–324.
  • Nagl, S., M. Fürsch, M. Paulus, J. Richter, J. Trüby, and D. Lindenberger. 2011. “Energy Policy Scenarios to Reach Challenging Climate Protection Targets in the German Electricity Sector Until 2050.” Utilities Policy 19 (3): 185–192.
  • Neumann, von J.M., and O. Morgenstern. 1947. Theory of Games and Economic Behavior. Princeton, NJ: Princeton University Press.
  • Nikoukar, J., and M.R. Haghifam. 2012. “Transmission Cost Allocation Based on the Use of System and Considering the Congestion Cost.” Electrical Power and Energy Systems 43 (1): 961–968.
  • O'Hare, M. 1977. ““Not on My Block You Don't”: Facility Citing and the Strategic Importance of Compensation.” Public Policy 25 (4): 407–458.
  • Okamoto, Y. 2008. “Fair Cost Allocations Under Conflicts – A Game Theoretic Point of View.” Discrete Optimization 5 (1): 1–18.
  • Oswald, B.R., and L. Hofmann. 2010. Wirtschaftlichkeitsvergleich unterschiedlicher Übertragungstechniken im Höchstspannungsnetz anhand der 380-kV-Leitung Wahle-Mecklar [Cost Assessment of Different Transmission Techniques for the 380-kV-Connection Wahle-Mecklar]. Hannover. http://www.tennet.eu/de/fileadmin/downloads/Netz-Projekte/Onshore/wirtschaftlichkeitsvergleich-wahle-mecklar.pdf
  • Peleg, B., and P. Sudhölter. 2007. Introduction to the Theory of Cooperative Games. 2nd ed. Berlin: Springer.
  • Pol, E., A. Di Masso, A. Castrechini, M.R. Bonet, and T. Vidal. 2006. “Psychological Parameters to Understand and Manage the NIMBY Effect.” Revue Européenne de Psychologie Appliquée 56 (1): 43–51.
  • Rosenthal, E.C. 2013. “Shortest Path Games.” European Journal of Operational Research 224 (1): 132–140.
  • Ruiz, P.A., and J. Contreras. 2007. “An Effective Transmission Network Expansion Cost Allocation Based on Game Theory.” IEEE Transactions on Power Systems 22 (1): 136–144.
  • Schaber, K., F. Steinke, P. Mühlich, and T. Hamacher. 2012. “Parametric Study of Variable Renewable Energy Integration in Europe: Advantages and Costs of Transmission Grid Extensions.” Energy Policy 42 (3): 498–508.
  • Schroeder, A., P.-Y. Oei, A. Sander, L. Hankel, and L.C. Laurisch. 2013. “The Integration of Renewable Energies to German Transmission Grid: A Scenario Comparison.” Energy Policy 61 (10): 140–150.
  • Shapley, L.S. 1971. Cores of Convex Games. Santa Monica, CA: Rand.
  • Songhuai, D., Z. Xinghua, M. Lu, and X. Hui. 2006. “A Novel Nucleolus-Based Loss Allocation Method in Bilateral Electricity Markets.” IEEE Transactions on Power Systems 21 (1): 28–33.
  • Stamtsis, G.C., and I. Erlich. 2004. “Use of Cooperative Game Theory in Power System Fixed-Cost Allocation.” Institution of Electrical Engineers 151 (3): 401–406.
  • Steinbach, A. 2013. “Barriers and Solutions for Expansion of Electricity Grids: The German Experience.” Energy Policy 63 (12): 224–229.
  • Sudhölter, P., and B. Peleg. 1998. “Nucleoli as Maximizers of Collective Satisfaction Functions.” Social Choice and Welfare 15 (3): 383–412.
  • Sundqvist, T., P. Söderholm, and A. Stirling. 2004. “Electric Power Generation: Valuation of Environmental Costs.” In Encyclopedia of Energy, edited by C.J. Cleveland, 229–243. Amsterdam: Elsevier.
  • Tabi, A., and S. del Saz-Salazar. 2015. “Environmental Damage Evaluation in a Willingness-to-Accept Scenario: A Latent-Class Approach Based on Familiarity.” Ecological Economics 116 (8): 280–288.
  • Takahashi, L.M. 1997. “The Socio-Spatial Stigmatization of Homelessness and HIV/AIDS: Towards an Explanation of the NYMBY Syndrome.” Social Science and Medicine 45 (6): 903–914.
  • Tan, X., and T.T. Lie. 2002. “Application of the Shapley Value on Transmission Cost Allocation in the Competitive Power Market Environment.” IEE Proceedings 149 (1): 15–20.
  • TenneT TSO 2012. “Netzausbau für die Zukunft: 380-kV-Leitung von Wahle nach Mecklar.” http://www.tennet.eu/de.
  • TenneT TSO 2013. Pilotprojekt Bürgeranleihe Westküstenleitung: Ergebnisse der Evaluation. [Pilot Project Citizen Bond West Coast Line: Results of the Evaluation]. http://www.tennet.eu/de/news-presse/article/buergerleitung-erfahrungen-bieten-basis-fuer-weiterentwicklung-der-buergerbeteiligung-beim-strom.html
  • Trudeau, C. 2014. “Minimum Cost Spanning Tree Problems with Indifferent Agents.” Games and Economic Behavior 84 (3): 137–151.
  • Van der Horst, D. 2007. “NIMBY or Not? Exploring the Relevance of Location and the Politics of Voiced Opinions in Renewable Energy Siting Controversies.” Energy Policy 35 (5): 2705–2714.
  • Vedel, S.E., J.B. Jacobson, and B.J. Thorson. 2015. “Forest Owners’ Willingness to Accept for Ecosystem Service Provision is Sensitive to Additionality.” Ecological Economics 113 (5): 15–24.
  • Vickrey, W.S. 1961. “Counterspeculation, Auctions, and Competitive Sealed Tenders.” The Journal of Finance 16: 16–37.
  • Vittes, M.E., P.H. Pollok III, and S.A. Lilie. 1993. “Factors Contributing to NIMBY Attitudes.” Waste Management 13 (2): 125–129.
  • Voorneveld, M., and S. Grahn. 2002. “Cost Allocation in Shortest Path Games.” Mathematical Methods of Operations Research 56 (2): 323–340.
  • Wolsink, M. 2000. “Wind Power and the NIMBY-Myth: Institutional Capacity and the Limited Significance of Public Support.” Renewable Energy 21 (1): 49–64.
  • Wolsink, M. 2007. “Wind Power Implementation: The Nature of Public Attitudes: Equity and Fairness Instead of ‘Backyard Motives’.” Renewable and Sustainable Energy Reviews 11 (6): 1188–1207.
  • Young, H.P. 1994. “Cost Allocation.” In Handbook of Game Theory with Economic Application – Vol. II, edited by R.J. Aumann, and S. Hart, 1193–1235. Amsterdam: Elsevier.
  • Yu, C.W., A.K. David, C.T. Tse, and C.Y. Chung. 2003. “Capacity-Use and Reliability Based Transmission Embedded Cost Allocation with Temporal Considerations.” Electrical Power and Energy Systems 25 (3): 201–208.
  • Zelewski, S., and M.L. Peters. 2010. “Fair Distribution of Efficiency Gains in Supply Networks from a Cooperative Game Theory Point of View.” International Journal of Information Systems and Supply Chain Management 3 (2): 1–24.
  • Zolezzi, J.M., and H. Rudnick. 2002. “Transmission Cost Allocation by Cooperative Games and Coalition Formation.” IEEE Transactions on Power Systems 17 (4): 1008–1015.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.