References
- J.M. Kontoleon (1980): Reliability Improvement of Multi-terminal Network, IEEE Transactions on Reliability, Vol. 29(1), pp. 75–76. doi: 10.1109/TR.1980.5220719
- J. She and M.G. Pecht (1992): Reliability of k-out-of-n: Warm Standby System, IEEE Transactions on Reliability, Vol. 41(1), pp. 72–75. doi: 10.1109/24.126674
- S. Akhtar (1994): Reliability of k-out-of-n: G Systems with Imperfect Fault-Coverage, IEEE Transactions on Reliability, Vol. 43(1), pp. 101–106. doi: 10.1109/24.285121
- W.G. Schneeweiss (1995): Mean Time to First Failure of Repairable systems with One Cold Spare, IEEE Transactions on Reliability, Vol. 44(4), pp. 567–574. doi: 10.1109/24.475975
- T. Zhang (2000): Availability of 3-out-of-4: G Warm Standby System, IEICE Transactions on Fundamentals of Electronics, Communications and Computer Sciences, Vol. E83-A(5), pp. 857–862.
- Arjan J.C. Van Gemund and Gerard Reijns (2012): Reliability Analysis of k-out-of-n System with Single Cold Standby Using Pearson Distributions, IEEE Transactions on Reliability, Vol. 61(3), pp. 526–532. doi: 10.1109/TR.2012.2192587
- J. Kumar, M.S. Kadyan and S.C. Malik (2013): Profit Analysis of a 2-out-of-2 Redundant System with Single Standby and Degradation of the Unit after Repair. International Journal of System Assurance Engineering and Management, Vol. 4 (4), pp. 424–434. doi: 10.1007/s13198-012-0127-4
- R. Gupta, P. Kumar and A. Gupta (2013): Cost Benefit Analysis of a Two Dissimilar Unit Cold Standby System with Weibull Failure and Repair Laws, International Journal of System Assurance Engineering and Management, Vol. 4 (4), pp. 327–334. doi: 10.1007/s13198-012-0091-z
- Sonali Baweja and Ashish Kumar (2014): Reliability Measures of a Two-Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance. International Journal of Computer Applications, Vol. 104(1) pp. 5–9. doi: 10.5120/18164-9024
- Permila and S.C. Malik(2015): A 2-out-of-2: G System with Single Cold Standby and Arrival Time of the Server Using Weibull Distribution. International Journal of Statistics and Reliability Engineering, Vol. 2 (2), pp. 103–116.
- Permila, V.J. Munday and S.C. Malik (2016): Analysis of A 2 out of 2: G System with Single Cold Standby Unit under Preventive Maintenance Subject to Maximum Repair Time, International Journal of Applied Engineering and Technology, Vol. 6 (2) pp.32–42.
- Permila, V.J. Munday and S.C. Malik (2016): A 2-out-of-2: G System with Single Cold Standby and Priority to Repair over Replacement, International Journal of Statistics and Systems, Vol. 11(1), pp. 27–36.
- Permila and S.C. Malik (2016): Analysis of a 2-out-of-2: G System with Single Cold Standby Unit with Priority to Repair and Arrival Time of the Server, International Journal of Agricultral and Statistical Sciences, Vol. 12(2), pp. 351–358.