References
- Abernathy , R and Fulton , W . 2000 . The New Weibull Handbook , FL : Robert B. Abernethy, North Palm Beach .
- Alvarado , SM , Silverman , RP and Wilson , DS . 2004 . Assessing the performance of construction projects: implementing earned value management at the general services administration . Journal of Facilities Management , 3 : 92 – 105 .
- Anbari, E.T., “Applications and extensions of the earned value analysis method [CD-ROM],” Proceedings of the Project Management Institute 2001 Seminars and Symposium, Nov.1–10, Nashville, USA (2001).
- Barr , Z . 1996 . Earned value analysis: a case study . PM Network , 10 : 33 – 37 .
- Cable, J.H., J.F. Ordonez, G. Chintalapani and C. Plaisant, “Portfolio earned value management using treemaps,” Proceedings of the Project Management Institute Research Conference, July11–14, London, UK (2004).
- Chang , AS . 2001 . Defining cost/schedule performance indices and their ranges for design projects . Journal of Management in Engineering , 17 : 122 – 130 .
- Christensen , DS . 1994 . Using performance indices to evaluate the estimate at completion . Journal of Cost Analysis and Management , 19 : 17 – 24 .
- Daniel , MB Jr . 1998 . Implementing earned value easily and effectively . Project Management Journal , 29 : 11 – 18 .
- Dorner , WW . 1999 . Using microsoft excel for Weibull analysis . Quality Digest , 6 : 15 – 19 .
- Farris , JA , Groesbeck , RL , Aken , EMV and Letens , G . 2006 . Evaluating the relative performance of engineering design projects: a case study using data envelopment analysis . IEEE Transactions on Engineering Management , 53 : 471 – 481 .
- Fleming , QW and Koppelman , JM . 2000 . Earned Value Project Management , Newtown Square, PA : Project Management Institute .
- Gray , CF and Larson , EW . 2008 . Project Management: The Managerial Process , New York : McGraw Hill .
- Henderson, F., “Earned schedule: a breakthrough extension to earned value management,” Proceedings of the 2007 PMI Asia Pacific Global Congress Proceedings, Jan.29–31, Hong Kong (2007).
- Johnson , LG . 1951 . The median ranks of sample values in their population with an application to certain fatigue studies . Industrial Mathematics , 2 : 1 – 9 .
- Johnson , LG . 1964 . The Statistical Treatment of Fatigue Experiments , Amsterdam : Elsevier .
- Kumamoto , H and Henley , EJ . 1996 . Probabilistic Risk Assessment and Management for Engineers and Scientists , New York : IEEE press .
- Lewis , JP . 2001 . Project Planning, Scheduling, and Control: A Hands-on Guide to Bringing in on Time and on Budget , New York : McGraw Hill .
- Lipke , W . 2003 . Schedule is different . The Measurable News , 3 : 31 – 34 .
- Mann , NR , Schafer , RE and Singpurwalla , ND . 1974 . Methods for Statistical Analysis of Reliability and Life Data , New York : John Wiley and Sons .
- Meredith , JR and Mantel , SJ Jr . 2000 . Project Management: A Managerial Approach , New York : John Wiley and Sons .
- Nassar , KM , Gunnarsson , HG and Hegab , MY . 2005 . Using Weibull analysis for evaluation of cost and schedule performance . Journal of Construction Engineering and Management , 131 : 1257 – 1262 .
- National Defense Industrial Association (NDIA) . 2005 . ANSI/EIA-748-A Standard for Earned Value Management Systems Intent Guide , VA : Program Management Systems Committee (PMSC) .
- Project Management Institute (PMI) . 2004 . A Guide to the Project Management Body of Knowledge , PA : Newton Square .
- Project Management Institute (PMI) . 2004 . Effective Benchmarking for Project Management , PA : Newton Square .
- Rozenes , S , Vitner , G and Spraggett , S . 2004 . MPCS: multidimensional project control system . International Journal of Project Management , 22 : 109 – 118 .
- Stratton , R . 2006 . The Earned Value Management Maturity Model , Vienna, VA : Management Concepts .
- Vandevoorde , S and Vanhoucke , M . 2006 . A comparison of different project duration forecasting methods using earned value metrics . International Journal of Project Management , 24 : 289 – 302 .
- Vandevoorde , S and Vanhoucke , M . 2006 . Measuring the accuracy of earned value/earned schedule forecasting predictors . The Measurable News , 58 : 26 – 30 .
- Venkataraman , RR and Pinto , JK . 2008 . Cost and Value Management in Projects , New Jersey : John Wiley and Sons .
- Vitner , G , Rozenes , S and Spragget , S . 2006 . Using data envelope analysis to compare project efficiency in a multi-project environment . International Journal of Project Management , 24 : 323 – 329 .