References
- Anson M. Aston D. E. Cooke T. H. (1989) Concrete pumping in the UK and West Germany Proceedings of the Institution of Civil Engineers, Part I 41 57
- Anson , M. and Wang , S. Q. (1998) . Performance of concrete placing in Hong Kong buildings . Journal of Construction Engineering and Management, ASCE , 124 ( 2 ) : 116 – 124 .
- Christian , J. and Hackney , D. (1995) . Effects of delay times on production rates in construction . Journal of Construction Engineering and Management, ASCE , 121 ( 1 ) : 20 – 26 .
- Dunlop P. G. Smith S. D. (2002) Simulation analysis of the UK concrete delivery and placement process – a tool for planners 18th Annual ARCOM Conference 2–4 September 2002 University of Northumbria Association of Researchers in Construction Management
- Herbsman , Z. and Ellis , R. (1990) . Research of factors influencing construction productivity . Construction Management and Economics , 8 ( 1 ) : 49 – 61 .
- Hogg R. V. Ledolter J. (1992) Applied Statistics for Engineers and Physical Scientists 2nd ed. Macmillan New York
- Smith , S. D. (1998) . Concrete placing analysis using discrete-event simulation . Proceedings of the Institute of Civil Engineers, Structures and Buildings , 128 ( 4 ) : 351 – 358 .
- Smith , S. D. (1999a) . Modelling and experimentation of the concrete supply and delivery process . Civil Engineering and Environmental Systems , 16 : 93 – 114 .
- Smith , S. D. (1999b) . Earthmoving productivity estimation using linear regression techniques . Journal of Construction Engineering and Management, ASCE , 125 ( 3 ) : 133 – 141 .