REFERENCES
- ACPA, 2013. Guide specification, dowel bar alignment and location for placement by mechanical dowel bar insertion. Skokie, IL: American Concrete Pavement Association.
- Khazanovich, L., Darter, M., and Bartlett, R., 1998. Common characteristics of good and poorly performing PCC pavements. Washington, DC: U.S. Department of Transportation, Report Number FHWA-RD-97-131, Federal Highway Administration.
- Khazanovich, L., Hoegh, K., and Snyder, M., 2009. Guidelines for dowel alignment in concrete pavements. Washington, DC: National Cooperative Highway Research Program, NCHRP Report Number 637.
- Khazanovich, L., Yu, H.T., and Stubstad, R., 2003. Nondestructive dowel bar detection in existing rigid concrete pavement slabs. Sacramento, CA: California Department of Transportation.
- Leong, P., et al., 2006. Finite difference modeling of misaligned dowel bars and their effects on joint performance. Journal of the Transportation Research Board, Transportation Research Record Number 1946, 101–110.
- ODOT, 2009. Construction inspection manual of procedures. Columbus, OH: Ohio Department of Transportation.
- PCA, 1991. Concrete paving: 100 years of progress through innovation. Concrete in Highway Transportation, Number 10. Skokie, IL: Portland Cement Association.
- Prabhu, M., et al., 2006. Experimental investigation of effects of dowel misalignment on joint opening behavior in rigid pavements. Journal of the Transportation Research Board, Transportation Research Record Number 1947, 15–27.
- Prabhu, M., Varma, A., and Buch, N., 2007. Experimental and analytical investigations of mechanistic effects of dowel misalignment in jointed concrete pavements. Journal of the Transportation Research Board, Transportation Research Record Number 2037, 12–29.
- Rao, S., et al., 2009. Evaluation of dowel alignment constructability in Portland cement concrete pavements. Journal of the Transportation Research Board, Transportation Research Record Number 2098, 86–93.
- Saxena, P., et al., 2012. Laboratory and analytical modelling of misaligned dowel. International Journal of Pavement Engineering, 13 (3), 209–215.
- Yu, H.T., 2005. Dowel bar alignments of typical in-service pavements. Skokie, IL: Portland Cement Association, R&D Serial No. 2894.
- Yu, H.T. and Khazanovich, L., 2005. Use of magnetic tomography technology to evaluate dowel placement. Washington, DC: U.S. Department of Transportation, Report Number FHWA-IF-06-006, Federal Highway Administration.