References
- Amirkhanian, S.N., Burati, J.L., and Mirchandani, H.C., 1994. Effect of testing variability on contractor payment for asphalt pavements. Journal of Construction Engineering and Management, 120 (3), 579–592.
- Fugro Consultants, Inc. and Arizona State University (ASU), 2011. A performance-related specification for hot-mix asphalt. Washington, DC: Transportation Research Board of the National Academies NCHRP Report 704.
- Gharaibeh, N.G., et al., 2001. Effect of variability and central tendency in performance-related specifications for concrete pavement. In: Proceedings, 7th international conference on concrete pavements. Vol. 1, Orlando, FL, 513–524.
- Hughes, C.S., 1996. Variability in highway pavement construction. National Cooperative Highway Research Program (NCHRP) Synthesis 232. Washington, DC: Transportation Research Board, National Research Council.
- Jiang, Y., et al., 2003. Estimation of pavement layer thickness variability for reliability-based design. Transportation Research Record: Journal of the Transportation Research Board, 1849, 156–165.
- Liu, L. and Gharaibeh, N., in press. A Bayesian model for predicting the performance of pavements treated with thin HMA overlays. Transportation Research Record: Journal of the Transportation Research Board.
- Madanat, S., 1993. Optimal infrastructure management decisions under uncertainty. Transportation Research Part C: Emerging Technologies, 1 (1), 77–88.
- Newton, L.A. and Christian, J., 2006. Impact of quality on building costs. Journal of Infrastructure Systems, 12 (4), 199–206.
- Patel, A. and Thompson, M., 1998. Consideration and characterization of pavement construction variability. Transportation Research Record: Journal of the Transportation Research Board, 1632, 40–50.
- Stubstad, R.N., 2002. LTPP data analysis: variations in pavement design inputs. Washington, DC. National Cooperative Highway Research Program (NCHRP) Project No. 20-50(5) Transportation Research Board.
- Swei, O., Gregory, J., and Kirchain, R., 2013. Probabilistic characterization of uncertain inputs in the life-cycle cost analysis of pavements. Transportation Research Record: Journal of the Transportation Research Board, 2366, 71–77.
- Tayabji, S.D. and Wu, C.L., 2002. Variability of concrete materials data in long-term pavement performance program. Transportation Research Record: Journal of Transportation Research Board, 1813, 181–190.
- Villiers, C., et al., 2003. Evaluation of percent-within-limits construction specification parameters. International Journal of Pavement Engineering, 4 (4), 221–228.