359
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

A decision support framework for economic evaluation of flexible strategies in pavement construction projects

ORCID Icon & ORCID Icon
Pages 1342-1358 | Received 14 May 2017, Accepted 14 Jan 2018, Published online: 27 Jan 2018

References

  • AASHTO , 1993. AASHTO Guide For Design of Pavement Structures . Washington, DC: American Association of State Highway and Transportation Officials.
  • Abaza, K.A. , 2016. Back-calculation of transition probabilities for Markovian-based pavement performance prediction models. International Journal of Pavement Engineering , 17 (3), 253–264.10.1080/10298436.2014.993185
  • Abaza, K.A. , 2017. Empirical approach for estimating the pavement transition probabilities used in non-homogenous Markov chains. International Journal of Pavement Engineering , 18 (2), 128–137.10.1080/10298436.2015.1039006
  • Amram, M. and Kulatilaka, N. , 1999. Real Options: Managing Strategic Investment in an Uncertain World . Boston, MA : Harvard Business School Press.
  • Bellman, R. E. , 1957. Dynamics programming . Princeton, NJ: Princeton University Press.
  • Black, F. and Scholes, M. , 1973. The pricing of options and corporate liabilities. Journal of Political Economy , 81 (3), 637–654.10.1086/260062
  • Bonissone, P.P. , 1982. A fuzzy sets based linguistic approach: theory and applications. In: M.M. Gupta and E. Sanchez , eds. Approximate reasoning in decision analysis . Amsterdam, 329–339.
  • Chen, C. , 2007. Soft Computing-Based Life-Cycle Cost Analysis Tools For Transportation Infrastructure Management (PhD thesis in Civil and Environmental Engineering). Virginia Polytechnic Institute and State University.
  • Chenevière, P. and Ramdas, V. , 2006. Cost benefit analysis aspects related to long-life pavements. International Journal of Pavement Engineering , 7 (2), 145–152.10.1080/10298430600627037
  • Chow, J.Y.J. , Regan, A.C. , Ranaiefar, F. and Arkhipov, D.I. , 2011. A network option portfolio management framework for adaptive transportation planning. Transportation Research Part A: Policy and Practice , 45 (8), 765–778.
  • Copeland, T. and Antikarov, V. , 2001. Real Options: A Practitioner’s Guide . New York : Texere.
  • Dahlgren, E. and Leung, T. , 2015. An optimal multiple stopping approach to infrastructure investment decisions. Journal of Economic Dynamics and Control , 53, 251–267.10.1016/j.jedc.2015.02.001
  • Damodaran, A. , 2010. The Dark Side of Valuation: Valuing Young, Distressed, and Complex Businesses . Upper Saddle River, NJ: Pearson Education.
  • Deng, Y. , Cardin, M.A. , Babovic, V. , Santhanakrishnan, D. , Schmitter, P. and Meshgi, A. , 2013. Valuing flexibilities in the design of urban water management systems. Water Research , 47 (20), 7162–7174.10.1016/j.watres.2013.09.064
  • Dixit, A.K. and Pindyck, R.S. , 1994. Investment Under Uncertainty . Princeton, NJ: Princeton University Press.
  • Espinoza, R.D. , 2014. Separating project risk from the time value of money: a step toward integration of risk management and valuation of infrastructure investments. International Journal of Project Management , 32 (6), 1056–1072.10.1016/j.ijproman.2013.12.006
  • Fawcett, W. , Hughes, M. , Krieg, H. , Albrecht, S. and Vennström, A. , 2012. Flexible strategies for long-term sustainability under uncertainty. Building Research & Information , 40 (6), 545–557.10.1080/09613218.2012.702565
  • Fawcett, W. , Urquijo, I.R. , Krieg, H. , Hughes, M. , Mikalsen, L. and Gutiérrez, Ó.R.R. , 2015. Cost and environmental evaluation of flexible strategies for a highway construction project under traffic growth uncertainty. Journal of Infrastructure Systems , 21 (3), 05014006.10.1061/(ASCE)IS.1943-555X.0000230
  • Fenton, N. and Wang, W. , 2006. Risk and confidence analysis for fuzzy multicriteria decision making. Knowledge-Based Systems , 19 (6), 430–437.10.1016/j.knosys.2006.03.002
  • Ferson, S. , 2002. RAMAS Risk Calc 4.0 Software: Risk Assessment With Uncertain Numbers . Boca Raton, FL: CRC.
  • FHWA , 1998. Life-Cycle Cost Analysis in Pavement Design – In Search of Better Investment Decisions . Washington, DC: Federal Highway Administration, U.S. Department of Transportation.
  • Heravi, G. and Esmaeeli, A.N. , 2014. Fuzzy multicriteria decision-making approach for pavement project evaluation using life-cycle cost/performance analysis. Journal of Infrastructure Systems , 20 (2), 04014002.10.1061/(ASCE)IS.1943-555X.0000170
  • Hu, J. and Cardin, M.-A. , 2015. Generating flexibility in the design of engineering systems to enable better sustainability and lifecycle performance. Research in Engineering Design , 26 (2), 121–143.10.1007/s00163-015-0189-9
  • Kulatilaka, N. , 1993. The value of flexibility: the case of a dual-fuel industrial steam boiler. Financial Management , 22 (3), 271–280.10.2307/3665944
  • Lamptey, G. , Ahmad, M. , Labi, S. and Sinha, K.C. , 2005. Life Cycle Cost Analysis for INDOT Pavement Design Procedure . West Lafayette, IN: Purdue University.10.5703/1288284313261
  • Li, Z. and Madanu, S. , 2009. Highway project level life-cycle benefit/cost analysis under certainty, risk, and uncertainty: methodology with case study. Journal of Transportation Engineering , 135 (8), 516–526.10.1061/(ASCE)TE.1943-5436.0000012
  • Luehrman, T.A. , 1998. Strategy as a portfolio of real options. Harvard Business Review , 76 (5), 89–99.
  • Matthews, J.C. and Allouche, E.N. , 2010. A social cost calculator for utility construction projects. NASTT’s 2010 No-Dig Show. Chicago, IL: North American Society for Trenchless Technology (NASTT).
  • Merton, R.C. , 1973. Theory of rational option pricing. The Bell Journal of Economics and Management Science , 4 (1), 141–183.10.2307/3003143
  • MPORG , 2011. Iran Highway Asphalt Paving Code . 1st ed. Tehran: Management and Planning Organization of Iran, 173–232.
  • MPORG , 2016. List of Unit Prices For Highway, Railway and Airport Runway Construction Works . Tehran: Management and Planning Organization of Iran.
  • Mun, J. , 2006. Real Options Analysis: Tools and Techniques For Valuing Strategic Investments and Decisions . New York : Wiley.
  • de Neufville, R. and Scholtes, S. , 2011. Flexibility in Engineering Design . Cambridge, MA: MIT Press.
  • de Neufville, R. , Scholtes, S. and Wang, T. , 2006. Real options by spreadsheet: parking garage case example. Journal of Infrastructure System , 12 (2), 107–111.10.1061/(ASCE)1076-0342(2006)12:2(107)
  • ODOT , 2008. The Value of Travel-Time: Estimates of the Hourly Value of Time For Vehicles in Oregon 2007 . Salem, OR : Oregon Department of Transportation.
  • Olsson, N.O.E. , 2006. Management of flexibility in projects. International Journal of Project Management , 24 (1), 66–74.10.1016/j.ijproman.2005.06.010
  • Pendharkar, P.C. , 2014. A decision-making framework for justifying a portfolio of IT projects. International Journal of Project Management , 32 (4), 625–639.10.1016/j.ijproman.2013.09.006
  • Power, G.J. , Tandja, M.C.D. , Bastien, J. and Grégoire, P. , 2015. Measuring infrastructure investment option value. The Journal of Risk Finance , 16 (1), 49–72.10.1108/JRF-05-2014-0072
  • Reigle, J.A. and Zaniewski, J.P. , 2002. Risk-based life-cycle cost analysis for project-level pavement management. Transportation Research Record , 1816, 34–42.10.3141/1816-05
  • Santos, J. and Ferreira, A. , 2013. Life-cycle cost analysis system for pavement management at project level. International Journal of Pavement Engineering , 14 (1), 71–84.10.1080/10298436.2011.618535
  • SCI , 2015. Household, expenditure and income . Statistical Center of Iran. Available from: http://www.amar.org.ir/Portals/1/PropertyAgent/2212/Files/2584/income.xls [Accessed 22 June 2015].
  • Shaheen, A.A. , Fayek, A.R. and AbouRizk, S.M. , 2007. Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management , 133 (4), 325–334.10.1061/(ASCE)0733-9364(2007)133:4(325)
  • Tarefder, R.A. and Ahmad, M. , 2016. Cost-effectiveness analysis of chip seal with and without millings. International Journal of Pavement Engineering , 1–8. doi:10.1080/10298436.2016.1219599.
  • Tighe, S. , 2001. Guidelines for probabilistic pavement life cycle cost analysis. Transportation Research Record , 1769 (1), 28–38.10.3141/1769-04
  • TRB , 2010. Highway Capacity Manual . 2010th ed. Washington, DC: Transportation Research Board, National Research Council.
  • Trigeorgis, L. , 1993. Real options and interactions with flexibility. Financial Management , 22 (3), 202–222.10.2307/3665939
  • Trigeorgis, L. , 1996. Real Options: Managerial Flexibility and Strategy in Resource Allocation . Cambridge, MA: MIT Press.
  • Wang, T. , 2005. Real Options ‘In’ Projects And Systems Design-Identification of Options and Solution for Path Dependency (PhD thesis in Engineering Systems). Massachusetts Institute of Technology.
  • Wennström, J. and Karlsson, R. , 2016. Possibilities to reduce pavement rehabilitation cost of a collision-free road investment using an LCCA design procedure. International Journal of Pavement Engineering , 17 (4), 331–342.10.1080/10298436.2014.993191
  • Wu, D. , Yuan, C. and Liu, H. , 2017. A risk-based optimisation for pavement preventative maintenance with probabilistic LCCA: a Chinese case. International Journal of Pavement Engineering , 18 (1), 11–25.10.1080/10298436.2015.1030743
  • Yeo, K.T. and Qiu, F. , 2003. The value of management flexibility – a real option approach to investment evaluation. International Journal of Project Management , 21 (4), 243–250.10.1016/S0263-7863(02)00025-X
  • Zadeh, L.A. , 1965. Fuzzy sets. Information and Control , 8 (3), 338–353.10.1016/S0019-9958(65)90241-X
  • Zadeh, L.A. , 1999. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems , 100 (Supplement), 9–34.10.1016/S0165-0114(99)80004-9
  • Zaniewski, J.P. , Butler, B.C. Jr , Cunningham, G. , Elkins, G.E. , Paggi, M. and Machemehl, R. , 1982. Vehicle Operating Costs, Fuel Consumption, and Pavement Type and Condition Factors. FHWA/PL/82/001 . Washington, DC: Federal Highway Administration, U.S. Department of Transportation.
  • Zhang, S.X. and Babovic, V. , 2011. An evolutionary real options framework for the design and management of projects and systems with complex real options and exercising conditions. Decision Support Systems , 51 (1), 119–129.10.1016/j.dss.2010.12.001
  • Zhang, S.X. and Babovic, V. , 2012. A real options approach to the design and architecture of water supply systems using innovative water technologies under uncertainty. Journal of Hydroinformatics , 14 (1), 13–29.10.2166/hydro.2011.078
  • Zhao, T. , Sundararajan, S.K. and Tseng, C. , 2004. Highway development decision-making under uncertainty: a real options approach. Journal of Infrastructure Systems , 10 (1), 23–32.10.1061/(ASCE)1076-0342(2004)10:1(23)
  • Zhao, T. and Tseng, C. , 2003. Valuing flexibility in infrastructure expansion. Journal of Infrastructure Systems , 9 (3), 89–97.10.1061/(ASCE)1076-0342(2003)9:3(89)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.