7,876
Views
31
CrossRef citations to date
0
Altmetric
Articles

Optimisation of pavement maintenance and rehabilitation activities, timing and work zones for short survey sections and multiple distress types

ORCID Icon &
Pages 583-607 | Received 07 Jan 2018, Accepted 14 Jul 2018, Published online: 24 Jul 2018

References

  • AASHTO, 2012. Pavement management guide. 2nd ed. Washington, DC: American Association of State Highway and Transportation Officials.
  • Anastasopoulos, P.C., et al., 2012. Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138 (3), 390–398. doi: 10.1061/(ASCE)CO.1943-7862.0000437
  • Anastasopoulos, P.C. and Mannering, F.L., 2015. Analysis of pavement overlay and replacement performance using random parameters hazard-based duration models. Journal of Infrastructure Systems, 21 (1), 04014024. doi: 10.1061/(ASCE)IS.1943-555X.0000208
  • Bennett, C.R. and Greenwood, I.D., 2001. Modeling road user and environmental effects in HDM-4. Highway development and management series, vol. 7. Paris: World Road Association (PIARC).
  • Birbaum, J., 2016. Entwicklung eines Verfahrens zur Ermittlung der Lebenszykluskosten von Straßen in Asphaltbauweise [Development of a procedure to determine the life-cycle-costs of asphalt roads]. Dissertation (PhD). Universität Siegen (in German).
  • BMVIT, 2013. Transport in figures: Austria – edition 2011. Vienna: Federal Ministry for Transport, Innovation and Technology (BMVIT).
  • Brozek, B., Litzka, J., and Weninger-Vycudil, A., 2009. Entwicklung eines nutzerkostenmoduls im österreichischen PMS [Development of a user cost module in the Austrian pavement management system]. Wien: BMVIT, Straßenforschung Heft 585 (in German).
  • Chen, C.H. and Schonfeld, P., 2007. Pavement resurfacing intervals in work zone optimization. 86th annual meeting of the Transportation Research Board, 21–25 January, Washington, DC.
  • Chien, S. and Schonfeld, P., 2001. Optimal work zone lengths for four-lane highways. Journal of Transportation Engineering, 127 (2), 124–131. doi: 10.1061/(ASCE)0733-947X(2001)127:2(124)
  • Chu, J.C. and Chen, Y.-J., 2012. Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions. Transportation Research Part B, 46 (9), 1123–1143. doi: 10.1016/j.trb.2012.05.002
  • Cormen, T.H., et al., 2009. Introduction to algorithms. 3rd ed.Cambridge, МА: MIT Press.
  • Cuelho, E., Mokwa, R., and Akin, M., 2006. Preventive maintenance treatments of flexible pavements: a synthesis of highway practice. Report no. FHWA/MT-06-009/8117-26. Helena, MT: Montana Department of Transportation.
  • Donev, V., and Hoffmann, M., 2017a. Condition prediction and estimation of service life in the presence of data censoring and dependent competing risks. International Journal of Pavement Engineering. doi.10.1080/10298436.2017.1293264.
  • Donev, V., and Hoffmann, M., 2017b. Network-level optimization of pavement M&R activities, timing and work-zone length for multiple distress types. World Conference on Pavement and Asset Management, 12–16 June, Milan, Italy.
  • Eiben, A.E. and Smith, J.E., 2015. Introduction to evolutionary computing. 2nd ed.Berlin: Springer.
  • Ferreira, A., Picado-Santos, L., and Antunes, A., 2002. A segment-linked optimization model for deterministic pavement management systems. International Journal of Pavement Engineering, 3 (2), 95–105. doi: 10.1080/10298430290030603
  • Fischer, L., 2009. Wirtschaftlichkeitsuntersuchung von Behelfsverkehrsführungen an Autobahnarbeitsstellen unter Berücksichtigung der Querschnittsabmessungen [Economic feasbility study of work-zone layout types and traffic control on freeways with regard to the dimensions of the cross section]. Bauhaus-Universität Weimar (in German).
  • Frommet al., 2012. ASFINAG: erhaltungsstrategie [ASFINAG: asset management strategy]. Wien: ASFINAG Service GmbH und ASFINAG Alpenstraßen (unpublished, in German).
  • FSV, 2010. RVS 02.01.22: nutzen-kosten-untersuchungen im verkehrswesen [Transportation cost and benefit analysis]. Wien: Forschungsgesellschaft Straße-Schiene-Verkehr (in German).
  • FSV, 2012. RVS 05.05.42: straßen mit getrennten richtungsfahrbahnen [Roads with separate directional carriageway]. Wien: Forschungsgesellschaft Straße-Schiene-Verkehr (in German).
  • FSV, 2016. RVS 03.08.63: oberbaubemessung [Pavement design]. Wien: Forschungsgesellschaft Straße-Schiene-Verkehr (in German).
  • Fwa, T.F., Chan, W.T., and Tan, C.Y., 1996. Genetic-algorithm programming of road maintenance and rehabilitation. Journal of Transportation Engineering, 122 (3), 246–253. doi: 10.1061/(ASCE)0733-947X(1996)122:3(246)
  • Goldberg, D.E., 1989. Genetic algorithms in search, optimization & machine learning. Reading, MA: Addison-Wesley.
  • Haas, R., Hudson, W.R., and Zaniewski, J., 1994. Modern pavement management. Malabar, FL: Krieger.
  • Hajdin, R. and Lindenmann, H.-P., 2007. Algorithm for the planning of optimum highway work zones. Journal of Infrastructure Systems, 13 (3), 202–214. doi: 10.1061/(ASCE)1076-0342(2007)13:3(202)
  • Hall, K.T., et al., 2001. Rehabilitation strategies for highway pavements. NCHRP Project C1-38: Conctractor’s final report. Washington, DC: Transportation Research Board.
  • Hamilton, J.D., 1994. Time series analysis. Princeton, NJ: Princeton University Press.
  • Hellmann, L., Rübensam, J., and Schwiethal, S., 2008. Entwicklung von verfahrenshilfen zur berücksichtigung baustellenbedingter nutzerkosten im erhaltungsmanagement [Development of process procedures in the maintenance management, considering construction site-specific user costs]. Bonn: Forschung Straßenbau und Straßenverkehrstechnik, Heft 988 (in German).
  • Hoffmann, M., and Donev, V., 2017. Optimization of pavement M&R activities and work zones with user costs for multiple distress types. World Conference on Pavement and Asset Management, 12-16 June, Milan, Italy.
  • Jiang, X. and Adeli, H., 2003. Freeway work zone traffic delay and cost optimization model. Journal of Transportation Engineering, 129 (3), 230–241. doi: 10.1061/(ASCE)0733-947X(2003)129:3(230)
  • Kuhn, K.D. and Madanat, S.M., 2005. Model uncertainty and management of a system of infrastructure facilities. Transportation Research Part C, 13 (5), 391–404. doi: 10.1016/j.trc.2006.02.001
  • Lea, J.D. and Harvey, J.T., 2015. Using spatial statistics to characterise pavement properties. International Journal of Pavement Engineering, 16 (3), 239–255. doi: 10.1080/10298436.2014.942856
  • Lee, J. and Madanat, S., 2014. Joint optimization of pavement design, resurfacing and maintenance strategies with history-dependent deterioration models. Transportation Research Part B, 68, 141–153. doi: 10.1016/j.trb.2014.06.008
  • Lee, J. and Madanat, S., 2015. A joint bottom-up solution methodology for system-level pavement rehabilitation and reconstruction. Transportation Research Part B, 78, 106–122. doi: 10.1016/j.trb.2015.05.001
  • Lindenmann, H.P., 2008. Massnahmenplanung im erhaltungsmanagement von fahrbahnen; synthesebericht [Action planning within the management of road maintenance; synthesis report]. UVEK-schriftenreihe Nr. 1259. Zürich: Schweizerischer Verband der Strassen- und Verkehrsfachleute (in German).
  • Mallela, J. and Sadasivam, S., 2011. Work zone road user costs: concepts and applications. Report no. FHWA-HOP-12-005. Washington, DC: Federal Highway Administration.
  • McDonald, M. and Madanat, S., 2012. Life-cycle cost minimization and sensitivity analysis for mechanistic-empiric pavement design. Journal of Transportation Engineering, 138 (6), 706–713. doi: 10.1061/(ASCE)TE.1943-5436.0000346
  • Medury, A. and Madanat, S., 2013. Incorporating network considerations into pavement management systems: a case for approximate dynamic programming. Transportation Research Part C, 33, 134–150. doi: 10.1016/j.trc.2013.03.003
  • Meissner, G., 2014. Correlation risk modeling and management: an applied guide including the basel III correlation framework – with interactive correlation models in excel/VBA. 1st ed.Singapore: Wiley.
  • Montgomery, D.C., Jennings, C.L., and Kulahci, M., 2015. Introduction to time series analysis and forecasting. 2nd ed.Hoboken, NJ: Wiley.
  • Nobakht, M., et al., 2016. Mechanistic-empirical methodology for the selection of cost-effective rehabilitation strategy for flexible pavements. International Journal of Pavement Engineering. doi./10.1080/10298436.2016.1199878.
  • Ntziachristos, L. and Samaras, Z., 2016. Exhaust emissions from road transport. In: EMEP/EEA air pollutant emission inventory guidebook 2016. EEA Report no. 21/2016. Luxembourg: European Environment Agency.
  • Ogwang, A., 2016. Threshold-based resurfacing policies in pavement management to minimize costs and greenhouse gas emissions. Dissertation (PhD). University of California, Berkeley.
  • Palisade, 2015. Evolver: the genetic algorithm solver for Microsoft Excel. User’s guide, version 7. Ithaca, NY: Palisade.
  • Rossetti, M.D., 2016. Simulation modeling and arena. 2nd ed.Hoboken, NJ: Wiley.
  • Santos, J., Ferreira, A., and Flintsch, G., 2017. An adaptive hybrid genetic algorithm for pavement management. International Journal of Pavement Engineering. doi.10.1080/10298436.2017.1293260.
  • Sathaye, N. and Madanat, S., 2012. A bottom-up optimal pavement resurfacing solution approach for large-scale networks. Transportation Research Part B, 46 (4), 520–528. doi: 10.1016/j.trb.2011.12.001
  • Stone, M.L.C., 2013. Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analysis. Dissertation (PhD). University of Alabama.
  • Timm, D.H. and Newcomb, D.E., 2006. Perpetual pavement design for flexible pavements in the US. International Journal of Pavement Engineering, 7 (2), 111–119. doi: 10.1080/10298430600619182
  • Walls III, J. and Smith, M.R., 1998. Life-cycle cost analysis in pavement design: interim technical bulletin. Report no. FHWA-SA-98-079. Washington, DC: Federal Highway Administration.
  • Wießmayer, W., 2006. B1 Wiener Straße Teststrecke: Abschlussbericht [B1 Wiener Straße test track: final report]. Linz: Amt der O.ö. Landesregierung – Landesbaudirektion, Abteilung Straßenerhaltung und – betrieb (in German).
  • Williams, R.C., Hildreth, J.C., and Vorster, M.C., 2009. Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135 (12), 1299–1306. doi: 10.1061/(ASCE)CO.1943-7862.0000112
  • Wirtgen, 2013. Wirtgen cold milling manual: technology and application. Windhagen, Germany: Wirtgen GmbH.
  • Yang, N., 2010. Optimization of highway work zone decisions considering short-term and long-term impacts. Dissertation (PhD). University of Maryland.
  • Yeo, H., Yoon, Y., and Madanat, S., 2013. Algorithms for bottom-up maintenance optimisation for heterogeneous infrastructure systems. Structure and Infrastructure Engineering, 9 (4), 317–328. doi: 10.1080/15732479.2012.657649