445
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Multiple-Technique Approach for Improving a Performance Measurement and Management System: Action Research in a Mining Company

References

  • Abu-Suleiman, A., & Priest, J. W. (2006). A framework for quantitative enterprise strategy management using strategy maps. Paper presented at the Industrial Engineering Research Conference, Orlando, FL.
  • Akkermans, H. A., & Van Oorschot, K. E. (2005). Relevance assumed: A case study of balanced scorecard development using system dynamics. Journal of the Operational Research Society, 56(8), 931–941.
  • Alsyouf, I. (2006). Measuring maintenance performance using a balanced scorecard approach. Journal of Quality in Maintenance Engineering, 12(2), 133–149.
  • Barnabè, F. (2011). A “system dynamics-based balanced scorecard” to support strategic decision making: Insights from a case study. International Journal of Productivity and Performance Management, 60(5), 446–473.
  • Bhagwat, R., & Sharma, M. K. (2007). Performance measurement of supply chain management: A balanced scorecard approach. Computers & Industrial Engineering, 53(1), 43–62.
  • Bigliardi, B., & Bottani, E. (2010). Performance measurement in the food supply chain: A balanced scorecard approach. Facilities, 28(5/6), 249–260.
  • Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000). Designing, implementing and updating performance measurement systems. International Journal of Operations & Production Management, 20(7), 754–771.
  • Braz, R. G. F., Scavarda, L. F., & Martins, R. A. (2011). Reviewing and improving performance measurement systems: An action research. International Journal of Production Economics, 133(2), 751–760.
  • Brooks, W. K., & Coleman, G. D. (2003). Evaluating key performance indicators used to drive contractor behavior at AEDC. Engineering Management Journal, 15(4), 29–39.
  • Brown, C. B., Collins, T. R., & McCombs, E. L. (2006). Transformation from batch to lean manufacturing: The performance issues. Engineering Management Journal, 18(2), 3–14.
  • Chen, C. C. (2008). An objective-oriented and product-line-based manufacturing performance measurement. International Journal of Production Economics, 112(1), 380–390.
  • Chen, S. H., Wang, H. H., & Yang, K. J. (2009). Establishment and application of performance measure indicators for universities. The TQM Journal, 21(3), 220–235.
  • Cheng, Y. T., Chou, H. H., & Chuang, H. M. (2010). Development and validation of an RFID-based surveillance system on a flow-shop overhaul line. Journal of Chung Cheng Institute of Technology, 39(2), 93–112.
  • Cheng, Y. T., Chou, H. H., & Chuang, H. M. (2012). Risk management of research and development of land-based vehicles. Journal of Chung Cheng Institute of Technology, 41(2), 37–49.
  • Coughlan, P., & Coghlan, D. (2002). Action research for operations management. International Journal of Operations & Production Management, 22(2), 220–240.
  • Elrod, C., Murray, S., & Bande, S. (2013). A review of performance metrics for supply chain management. Engineering Management Journal, 25(3), 39–50.
  • Faherty, V. (1979). Continuing social work education: Results of a Delphi survey. Journal of Education for Social Work, 15(1), 12–19.
  • Goldratt, E. M., & Cox, J. (2004). The goal: A process of ongoing improvement (3rd ed.). Great Barrington, MA: North River Press.
  • Gomes, C. F., Yasin, M. M., & Lisboa, J. V. (2004). An examination of manufacturing organizations’ performance evaluation: Analysis, implications and a framework for future research. International Journal of Operations & Production Management, 24(5), 488–513.
  • Gu, Q., Lu, C., & Li, F. (2009). Dynamic information management system of mining production in an open pit based on GIS/GPS/GPRS/RFID. Paper presented at the International Conference on Management and Service Science, Wuhan, China. 2009.
  • Hozak, K., & Collier, D. A. (2008). RFID as an enabler of improved manufacturing performance. Decision Sciences, 39(4), 859–881.
  • Hsu, C. W., Hu, A. H., Chiou, C. Y., & Chen, T. C. (2011). Using the FDM and ANP to construct a sustainability balanced scorecard for the semiconductor industry. Expert Systems with Applications, 38(10), 12891–12899.
  • Hudson, M., Smart, P. A., & Bourne, M. (2001). Theory and practice in SME performance measurement systems. International Journal of Operations & Production Management, 21(8), 1096–1115.
  • Kaplan, R. S., & Norton, D. P. (1996). Linking the balanced scorecard to strategy. California Management Review, 39(1), 53–79.
  • Kaplan, R. S., & Norton, D. P. (2001). The strategy focused organization: How balanced scorecard companies thrive in the new business environment. Boston, MA: Harvard Business Press.
  • Kaplan, R. S., & Norton, D. P. (2006). Alignment: Using the balanced scorecard to create corporate synergies. Boston, MA: Harvard Business Press.
  • Kennerley, M., & Neely, A. (2002). A framework of the factors affecting the evolution of performance measurement systems. International Journal of Operations & Production Management, 22(11), 1222–1245.
  • Kennerley, M., & Neely, A. (2003). Measuring performance in a changing business environment. International Journal of Operations & Production Management, 23(2), 213–229.
  • Kumar, U., & Parida, A. (2008). Maintenance performance measurement (MPM) system. In K. A. H. Kobbacy & D. N. P. Murthy (Eds.), Complex system maintenance handbook (pp. 459–478). London, UK: Springer.
  • Leung, L. C., Lam, K. C., & Cao, D. (2006). Implementing the balanced scorecard using the analytic hierarchy process and the analytic network process. Journal of the Operational Research Society, 57(6), 682–691.
  • Medori, D., & Steeple, D. (2000). A framework for auditing and enhancing performance measurement systems. International Journal of Operations & Production Management, 20(5), 520–533.
  • Neely, A., & Adams, C. (2001). The performance prism perspective. Journal of Cost Management, 15(1), 7–15.
  • Neely, A., & Bourne, M. (2000). Why measurement initiatives fail? Measuring Business Excellence, 4(4), 3–7.
  • Nielsen, S., & Nielsen, E. H. (2008). System dynamics modelling for a balanced scorecard: Computing the influence of skills, customers, and work in process on the return on capital employed. Management Research News, 31(3), 169–188.
  • Nielsen, S., & Nielsen, E. H. (2012). Discussing feedback system thinking in relation to scenario evaluation in a balanced scorecard setup. Production Planning & Control, 23(6), 436–451.
  • Nudurupati, S. S., Arshad, T., & Turner, T. (2007). Performance measurement in the construction industry: An action case investigating manufacturing methodologies. Computers in Industry, 58(7), 667–676.
  • Nudurupati, S. S., Bititci, U. S., Kumar, V., & Chan, F. T. S. (2011). State of the art literature review on performance measurement. Computers & Industrial Engineering, 60(2), 279–290.
  • Pauwels, K., Ambler, T., Clark, B. H., LaPointe, P., Reibstein, D., Skiera, B. … Wiesel, T. (2009). Dashboards as a service: Why, what, how, and what research is needed. Journal of Service Research, 12(2), 175–189.
  • Rouse, P., & Putterill, M. (2003). An integral framework for performance measurement. Management Decision, 41(8), 791–805.
  • Saiz, J. J. A., Rodriguez, R. R., Bas, A. O., & Verdecho, M. J. (2010). An information architecture for a performance management framework by collaborating SMEs. Computers in Industry, 61(7), 676–685.
  • Samarakoon, S. M., Markeset, T., & Gudmestad, O. T. (2012). Life cycle costing as a tool for selecting the best available and qualified technique for managing physical assets. International Journal of Performability Engineering, 8(3), 249–264.
  • Santos, S. P., Belton, V., & Howick, S. (2002). Adding value to performance measurement by using system dynamics and multicriteria analysis. International Journal of Operations & Production Management, 22(11), 1246–1272.
  • Shah, H., Eardley, A., & Wood-Harper, T. (2007). ALTAR: Achieving learning through action research. European Journal of Information Systems, 16(6), 761–770.
  • Song, J., Haas, C. T., & Caldas, C. H. (2006). Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), 911–918.
  • Speckbacher, G., Bischof, G. J., & Pfeiffer, T. (2003). A descriptive analysis on the implementation of balanced scorecards in German-speaking countries. Management Accounting Research, 14(4), 361–388.
  • Sterman, J. D. (2000). Business dynamics: Systems thinking and modeling for a complex world. Boston, MA: Irwin McGraw-Hill.
  • Susman, G. I., & Evered, R. D. (1978). An assessment of the scientific merits of action research. Administrative Science Quarterly, 23(4), 582–603.
  • Suwignjo, P., Bititci, U. S., & Carrie, A. S. (2000). Quantitative models for performance measurement system. International Journal of Production Economics, 64(1), 231–241.
  • Taticchi, P., Balachandran, K., & Tonelli, F. (2012). Performance measurement and management systems: State of the art, guidelines for design and challenges. Measuring Business Excellence, 16(2), 41–54.
  • Taticchi, P., & Balachandran, K. R. (2008). Forward performance measurement and management integrated frameworks. International Journal of Accounting and Information Management, 16(2), 140–154.
  • Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2007). Development of a balanced scorecard: An integrated approach of interpretive structural modeling (ISM) and analytic network process (ANP). International Journal of Productivity and Performance Management, 56(1), 25–59.
  • Tsang, A. H. C., Jardine, A. K. S., & Kolodny, H. (1999). Measuring maintenance performance: A holistic approach. International Journal of Operations & Production Management, 19(7), 691–715.
  • Van der Stede, W. A., Chow, C. W., & Lin, T. W. (2006). Strategy, choice of performance measures, and performance. Behavioral Research in Accounting, 18, 185–205.
  • Van Horenbeek, A., & Pintelon, L. (2014). Development of a maintenance performance measurement framework—Using the analytic network process (ANP) for maintenance performance indicator selection. Omega, 42(1), 33–46.
  • Wu, H.-Y., Lin, Y.-K., & Chang, C.-H. (2011). Performance evaluation of extension education centers in universities based on the balanced scorecard. Evaluation and Program Planning, 34(1), 37–50.
  • Xiao, H., & Proverbs, D. (2003). Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), 322–332.
  • Yang, H., Chew, D. A. S., Wu, W., Zhou, Z., & Li, Q. (2012). Design and implementation of an identification system in construction site safety for proactive accident prevention. Accident Analysis and Prevention, 48, 193–203.
  • Yigitbasioglu, O. M., & Velcu, O. (2012). A review of dashboards in performance management: Implications for design and research. International Journal of Accounting Information Systems, 13(1), 41–59.
  • Yin, R. K. (1994). Case study research: Design and methods (2nd ed.). Thousand Oaks, CA: Sage Publications.
  • Youngblood, A. D., & Collins, T. R. (2003). Addressing balanced scorecard trade-off issues between performance metrics using multi-attribute utility theory. Engineering Management Journal, 15(1), 11–17.
  • Zelbst, P. J., Green, K. W., Sower, V. E., & Reyes, P. M. (2012). Impact of RFID on manufacturing effectiveness and efficiency. International Journal of Operations & Production Management, 32(3), 329–350.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.