892
Views
18
CrossRef citations to date
0
Altmetric
Articles

Short-Term Physiological Strain and Recovery among Employees Working with Agile and Lean Methods in Software and Embedded ICT Systems

, &

References

  • Abrahamsson, P. (2005). Agile software development introduction: Introduction, current status & future. Jyväskylä, Finland: VTT Electronics.
  • Abrahamsson, P., Salo, O., Ronkainen, J., & Warsta, J. (2002). Agile software development methods. Review and analysis. Espoo, Finland: VTT Publications 478, VTT.
  • Acharya, U., Paul, K., Kannathal, N., Lim, C., & Suri, J. (2006). Heart rate variability: A review. Medical & Biological Engineering & Computing, 44, 1031–1051.
  • Asproni, G. (2004, February). Motivation, teamwork, and agile development. Agile Times, 4, 8–16.
  • Bodyguard, Firstbeat Oy, Finland. (2015). Development and validation of an ambulatory HRV-measurement system. Retrieved from http://www.firstbeat.fi/userData/firstbeat/download/Development-and-validation-of-an-ambulatory-HRV-measurement-system.pdf
  • Carayon, P. (2009). The balance theory and the work system model … twenty years later. International Journal of Human–Computer Interaction, 25 (5), 313–327.
  • Collins, S., Karasek, R., & Costas, K. (2005). Job strain and autonomic indices of cardiovascular disease risk. American Journal of Industrial Medicine, 48, 182–193.
  • Cronbach, L. (1970). Essentials of psychological testing (3rd ed.). New York, NY: Harper & Row.
  • Debus, M., Sonnentag, S., Deutsch, W., & Nussbeck, F. (2014). Making flow happen: The effects of being recovered on work-related flow between and within days. Journal of Applied Psychology, 99, 713–722.
  • Durantin, G., Gagnon, J., Tremblay, S., & Dehais, F. (2014). Using near infrared spectroscopy and heart rate variability to detect mental overload. Behavioral Brain Research, 259, 16–23.
  • Dybå, T., & Dingsøyr, T. (2008). Empirical studies of agile software development: A systematic review. Information and Software Technology, 50 (9–10), 833–859.
  • Eisinga, R., Te Grotenhuis, M., & Pelzer, B. (2012). The reliability of a two-item scale: Pearson, cronbach or spearman-brown? International Journal of Public Health, 58 (4), 637–642. doi:10.1007/s00038-012-0416-3
  • Firstbeat Oy, Finland. (2014). Firstbeat lifestyle assesmen: Stress and recovery. Retrieved from http://www.firstbeat.fi/userData/firstbeat/research-publications/Stress-and-recovery_white-paper_2014.pdf
  • Fujigaki, Y., & Mori, K. (1997). Longitudinal study of work stress among information system professionals. International Journal of Human–Computer Interaction, 9, 369–381.
  • Graziotin, D., Wang, X., & Abrahamsson, P. (2013). Happy software developers solve problems better: Psychological measurements in empirical software engineering. PeerJ 2: e289, August 19, 2015. doi:10.7717/peerj.289
  • Graziotin, D., Wang, X., & Abrahamsson, P. (2014). Software developers, moods, emotions, and performance. IEEE Software, 31 (4), 24–27. doi:10.1109/MS.2014.94
  • Hall, M., Vasko, R., Buysse, D., Ombao, H., Chen, Q., Cashmere, J., … Thayer, J. (2004). Acute stress affects heart rate variability during sleep. Psychological Medicine, 66, 56–62.
  • Heart rate variability. (1996). Heart rate variability: Standards of measurement, physiological interpretation and clinical use. Task Force of the European Society of Cardiology and the North American Society of Pacing and Electrophysiology. Circulation, 93, 1043–1065.
  • Hogdson, D., & Briand, L. (2013). Controlling the uncontrollable: ‘Agile’ teams and illusions of autonomy in creative work. Work Employment & Society, 27 (2), 308–325.
  • Kaisti, M., Rantala, V., Mujunen, T., Hyrynsalmi, S., Könnölä, K., Mäkilä, T., & Lehtonen, T. (2013). Agile methods for embedded systems development: A literature review and a mapping study. EURASIP Journal on Embedded Systems, 2013 (15), 1–16.
  • Karasek, R. A. (1979). Job demand, job decision latitude, and mental strain: Implications for job redesign. Administrative Science Quarterly, 24, 285–309.
  • Kaufman, L., & Rousseeuw, P. J. (2009). Finding groups in data: An introduction to cluster analysis. In Wiley-Interscience (Ed.), Wiley series in probability and statistics (pp. 344). New Jersey: John Wiley & Sons, Inc.
  • Kniberg, H. (2009). Kanban and Scrum – Making the most of both. Retrieved from http://www.crisp.se/file-uploads/Kanban-vs-Scrum.pdf
  • Korunka, C., Zauchner, S., & Weiss, A. (1997). New information technologies, job profiles, and external workload as predictors of subjectively experienced stress and dissatisfaction at work. International Journal of Human–Computer Interaction, 9 (4), 407–424.
  • Laanti, M. (2013). Agile and wellbeing – Stress, empowerment, and performance in Scrum and Kanban teams. Proceedings of 46th Annual Hawaii International Conference on System Sciences (HICSS 2013), Wailea, Maui, HI, 4761–4770.
  • Lagerberg, L., Skude, T., Emanuelsson, P., Sandahl, K., Stahl, D., Ab, E., & Linkoping, S. (2013, October 10–11). The impact of agile principles and practices on large-scale software development projects: A multiple-case study of two projects at Ericsson. Presented at 2013 ACM/IEEE International Symposium on Empirical Software Engineering and Measurement (ESEM) (348–356), Baltimore, Maryland.
  • Lalsing, V., Kishnah, S., & Pudaruth, S. (2012). People factors in agile software development and project management. International Journal of Software Engineering & Applications (IJSEA), 3 (1), 117–137.
  • Law, E. L. C., & Lárusdóttir, M. K. (2015). Whose experience do we care about? Analysis of the fitness of Scrum and Kanban to user experience. International Journal of Human–Computer Interaction, 31 (9), 584–602.
  • Manifesto, A. (2013). Principles behind the Agile Manifesto. Retrieved from http://www.agilemanifesto.org/principles.html
  • Mann, C., & Maurer, M. (2005, July). A case study on the impact of Scrum on overtime and customer satisfaction. Presented at The Agile Development Conference (ADC ’05), 70–79, Denver CO. doi: 10.1109/ADC.2005.1.
  • Mannaro, K., Melis, M., & Marchesi, M. (2004). Empirical analysis on the satisfaction of IT employees comparing XP practices with other software development methodologies. In J. Eckstein & H. Baumeister (Eds.), Proceedings of the fifth International Conference on eXtreme Programming and Agile Processes in Software Engineering (XP 2004), Garmisch-Partenkirchen, Germany, June 6–10. Berlin. Heidelberg, Germany: Springer.
  • Melnik, G., & Maurer, F. (2006). Comparative analysis of job satisfaction in agile and non-agile software development teams. In P. Abrahamsson, M. Marchesi, & G. Succi (Eds.), Extreme programming and agile processes in software engineering (XP 2006). Berlin, Heidelberg: Springer.
  • Miller, S. (2001). Literature review. Workload measures (Document ID: N01-006). Iowa City, IA: The University of Iowa, National Advanced Driving, Simulator.
  • Misirli, A. T., Verner, J., Markkula, J., & Oivo, M. (2014, May). A survey on project factors that motivate Finnish software engineers. Presented at IEEE Eighth International Conference on Research Challenges in Information Science (RCIS), 1–9, Marrakech, Morocco.
  • Myrtek, M., Deutschmann-Janicke, E., Strohmaier, H., Zimmermann, W., Lawerenz, S., Brügner, G., & Müller, W. (1994). Physical, mental, emotional, and subjective workload components in train drivers. Ergonomics, 37, 1195–2003.
  • Nokia test. (2015). Retrieved from http://www.think-pi.de/Scrum-Nokia-test-english
  • Nunnally, J. (1967). Psychometric theory. New York, NY: McGraw-Hill.
  • Paxion, J., Galy, E., & Berthelon, C. (2014). Mental workload and driving. Frontiers in Psychology, 5, 1344.
  • Porschen, S. (2012). Management of the informal by cooperative transfer of experience. In F. Böhle, M. Bürgermeister, & S. Porschen (Eds.), Innovation management by promoting the informal: Artistic, experience-based, playful (pp. 105–142). Dordrecht, Netherlands: Springer.
  • Raja, M. I. (2012). Lean manufacturing - an integrated socio-technical systems approach to work design ( Doctoral dissertation). Clemson, SC: Clemson University. UMI Dissertations Publishing.
  • So, C., & Scholl, W. (2009, May). Perceptive agile measurement: New instruments for quantitative studies in the pursuit of the social-psychological effect of agile practices. Presented at Agile processes in software engineering and extreme programming. 10th International Conference, XP 2009, Pula, Sardinia, Italy
  • Succi, G., Marchesi, M., & Williams, L. (2002, May). Preliminary analysis of the effects of pair programming on job satisfaction. Proceedings of the 3rd International Conference on Extreme Programming, 212–215, Sardinia, Italy.
  • Takeuchi, H., & Nonaka, I. (1986). The new product development game. Retrieved from http://apln-ichmond.pbwiki.com/f/New%20New%20Prod%20Devel%20Game.pdf
  • Teisala, T., Mutikainen, S., Tolvanen, A., Rottensteiner, M., Leskinen, T., Kaprio, J., … Kujala, U. (2014). Associations of physical activity, fitness, and body composition with heart rate variability-based indicators of stress and recovery on workdays: A cross-sectional study. Journal of Occupational Medicine and Toxicology, 9, 16. doi:10.1186/1745-6673-9-16
  • Togo, F., & Takahashi, M. (2009). Heart rate variability in occupational health – A systematic review. Industrial Health, 47, 589–602.
  • Uusitalo, A., Mets, T., Martinmäki, K., Mauno, S., Kinnunen, U., & Rusko, H. (2011). Heart rate variability related to effort at work. Applied Ergonomics, 42, 830–838.
  • Van Amelsvoort, L., Schouten, E., Maan, A., Swenne, C., & Kok, F. (2000). Occupational determinants of heart rate variability. International Archive of Occupational and Environmental Health, 73, 255–262.
  • Van Hooff, M., Geurts, S., Kompier, M., & Taris, T. (2007). Workdays, in-between workdays and the weekend: A diary study on effort and recovery. International Archive of Occupational and Environmental Health, 80, 599–613.
  • Verner, J., Beecham, S., & Cerpa, N. (2010, May 20–22). Stakeholder Dissonance: Disagreements on project outcome and its impact on team motivation across three countries. Presented at ACM SIGMIS-CPR10, (pp. 25–33), Vancouver, Canada
  • Warne, R. T. (2014). A primer on multivariate analysis of variance (MANOVA) for behavioral scientists. Practical Assessment, Research & Evaluation, 19 (17).
  • Williams, L. (2007). A Survey of agile development methodologies. Retrieved from http://agile.csc.ncsu.edu/SEMaterials/AgileMethods.pdf
  • Yauch, A. (2007). Team-based work and work system balance in the context of agile manufacturing. Applied Ergonomics, 38 (1), 19–27.
  • Young, M., Brookhuis, K., Wickens, C., & Hancock, P. (2015). State of science: Mental workload in ergonomics. Ergonomics, 58, 1–17.
  • Zanstra, Y., & Johnston, D. (2011). Cardiovascular reactivity in real life settings: Measurement, mechanisms and meaning. Biological Psychology, 86, 98–105.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.