261
Views
2
CrossRef citations to date
0
Altmetric
Articles

Study on bearing characteristics of marine subsoil for semi-rigid immersed tunnel

ORCID Icon, , , , &
Pages 1171-1183 | Received 13 Apr 2021, Accepted 26 Jul 2021, Published online: 10 Sep 2021

References

  • Chen, S. Z., Z. X. Su, and Y. Chen. 2015. New Technologies Used for Immersed Tunnel of Hongkong-Zhuhai-Macao Bridge Project. Tunnel Construction 35 (5): 396–403. doi:10.13547/j.cnki.dxgcysd.2011.01.008.
  • Dai, Ya Jiao, Meng Jia Zhou, Yu Fei Kong, Xiao Dong Liu, and Zhi Gang Zhang. 2014. Numerical Analysis of Two Structural Schemes of the HK-Zhuhai-Macau Immersed Tunnel. Applied Mechanics and Materials 580-583: 1293–1296. doi:10.4028/www.scientific.net/AMM.580-583.1293.
  • Feng, H. P., H. L. Geng, B. W. Han, et al. 2017a. Prediction Model for Settlement of Highspeed Railway Embankment in Unsaturated Areas. Chinese Journal of Geotechnical Engineering 39 (6): 1089–1095. (in Chinese). doi:10.11779/CJGE201706015.
  • Feng, H. P., H. L. Geng, D. L. Ma, et al. 2017b. Study on Settlement Property and Prediction for High-Speed Railway Subgrade. Journal of the China Railway Society 39 (11): 138–143. in Chinese). doi:10.3969/j.issn.1001-8360.2017.11.021.
  • Grantz, W. C. 2001a. Immersed Tunnel Settlements: Part 1: Nature of Settlement. Tunnelling and Underground Space Technology 16 (3): 195–201. doi:10.1016/S0886-7798(01)00039-6.
  • Grantz, W. C. 2001b. Immersed Tunnel Settlements: Part 2: case Histories. Tunnelling and Underground Space Technology 16 (3): 203–210. doi:10.1016/S0886-7798(01)00040-2.
  • Hu, Z. N., Y. L. Xie, and J. Wang. 2015. Challenges and Strategies Involved in Designing and Constructing a 6km Immersed Tunnel: ä Case Study of the Hong Kong–Zhuhai–Macao Bridge. Tunnelling and Underground Space Technology 50: 171–177. DOI: doi:10.1016/j.tust.2015.07.011.
  • Huang, T., H. Yang, and C. You. 2016. Prestress Construction Technique about the Immersed Tunnel Precasting in Island and Tunnel Project of HZMB.” Construction Technology 45 (12): 86–89. in Chinese). doi:10.7672/sgjs2016120086.
  • Hulme, T. W., and A. J. Burchell. 1999. Tunnelling Projects in Singapore: An Overview. Tunnelling and Underground Space Technology 14 (4): 409–418. doi:10.1016/S0886-7798(00)00004-3.
  • Kasper, T., C. Rotwitt, P. G. Jackson, and K. R. Massarsch. 2009. Foundation of an immersed tunnel on marine clay improved by cement deep mixing and sand compaction piles. In 17th International Conference on Soil Mechanics and Geotechnical Engineering, Alexanrdria, Egypt, vol. 3, pp. 2415–2418.
  • Lin, M., H. Liang, and X. D. Liu. 2012. Method for Construction of Offshore Sand Compaction Piles and Its Application for Island and Tunnel Project for Hongkong-Zhuhai-Macao Bridge. China Harbor Engineering 4: 72–77 (in Chinese).
  • Lunniss, R., J. Baber, 2013. Immersed Tunnels. CRC Press.
  • Marshall, C. 1999. The Øresund Tunnel—Making a Success of Design and Build. Tunnelling and Underground Space Technology 14 (3): 355–365. doi:10.1016/S0886-7798(99)00051-6.
  • Rasmussen, N., and W. C. Grantz. 1997. Chapter 9: Catalogue of Immersed Tunnels. Tunnelling and Underground Space Technology 12 (2): 163–316. doi:10.1016/S0886-7798(97)90021-3.
  • Shao, J., and Y. S. Li. 2005. “Analysis of Immersed Tunnel Settlement.” Journal of Zhejiang Transportation Science and Technology 2: 41–43. (in Chinese).
  • Song, Erxiang, Peng Li, Ming Lin, and Xiaodong Liu. 2018. The Rationality of Semi-Rigid Immersed Tunnel Element Structure Scheme and Its First Application in Hong Kong Zhuhai Macao Bridge Project. Tunnelling and Underground Space Technology 82 (2018): 156–169. doi:10.1016/j.tust.2018.08.040.
  • Tang, X., and Y. Yang. 2015. Construction Technique for Prestressed Duct Grouting of Segmental Immersed Tube. China Harbor Engineering 35 (7): 89–91. in Chinese). doi:10.7640/zggwjs201507026.
  • Wei, G., H. J. Qiu, and X. J. Wei. 2013. Introduction of Construction Process in Shenjiamen Immerse Tube Tunnel and Problem Analysis of Grouting. Advanced Materials Research (838-841): 1399–1404. doi:10.4028/www.scientific.net/AMR.838-841.1399.
  • Wei, G., and Q. W. Su. 2014. Application of Three-Parameter Model in Settlement Calculation of Immersed Tube Tunnel. Applied Mechanics and Materials 470: 298–303. doi:10.4028/www.scientific.net/AMM.470.298.
  • Yu, H., Y. Yuan, G. Xu, Q. Su, X. Yan, and C. Li. 2016. Multi-Point Shaking Table Test for Long Tunnels Subjected to Non-Uniform Seismic Loadings-Part II: application to the HZM Immersed Tunnel. Soil Dynamics and Earthquake Engineering 108: 187–195. doi:10.1016/j.soildyn.2016.08.018.
  • Yue, X. B., Y. Xie, and Y. L. Xie. 2018. The Deformation Characteristics of Weak Foundation with High Back Siltation in the Immersed Tunnel. Advances in Materials Science and Engineering 2018 (9): 1–14. doi:10.1155/2018/6538764.
  • Zhang, H. 2007. Practice of Observation for Deformation of Immersed Tunnel of Soft Soil Foundation. China Harbor Engineering 151 (5): 17–19. (in Chinese)
  • Zhang, W. S., R. G. Liu, and H. B. Huang. 2015. Performance Test of New Prestressed Pipe Joint Connector. China Harbor Engineering 35 (11): 39–41. (in Chinese). doi:10.7640/zggwjs201511011.
  • Zhou, Z.,. W. Q. Ding, H. Z. Liu, et al. 2015. Study on the Influence of Prestressed Anchor Cable on the Mechanical Behavior of Joints in Immersed Tunnel. Chinese Journal of Underground Space and Engineering 11 (S1): 24–29. (in Chinese).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.