REFERENCES
- Groenevelt, H., Karmarkar, U. S., “A Dynamic Kanban System Case Study”, Production and Inventory Management Journal, Vol. 2, pp. 46–51, 1988.
- Yavuz, I. H., Satir, A., “A Kanban-based simulation study of a mixed model just-in-time manufacturing line”, International Journal of Production Research, Vol. 33 No. 4, pp. 1027–1048, 1995.
- Lee, L. C., “Parametric appraisal of the JIT system”, International Journal of Production Research, Vol. 25, pp. 1415–1429, 1987.
- Gupta, Y. P., Gupta, M. C., “A system dynamics model for a multi-stage multi-line dual-card JIT Kanban system”, International Journal of Production Research, Vol. 27, pp. 309–352, 1989.
- Huang, P. Y., Rees, L. P., Taylor B. W. III, “A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multi-line, multi-stage production system”. Decision Sciences, Vol. 14, pp. 326–343, 1983.
- Choi, R. H., Malstrom, E. M., “Evaluation of Traditional Work Scheduling Rules in a Flexible Manufacturing System with a Physical Simulator”, Journal of Manufacturing Systems, Vol. 7 No. 1, pp. 33–45, 1988.
- Ballakur, A., Steudel, H. J., “Integration of job shop control systems: a state-of-the-art review”. Journal of Manufacturing Systems, Vol. 3 No. 1, pp. 71–79, 1984.
- Montazeri, M., Van Wassenhove, L. N., “Analysis of Scheduling Rules for an FMS”, International Journal of Production Research, Vol. 28, No. 4, pp. 785–802, 1990.
- Mori, K., Tsukiyama, M., Fukada, T., “A Real-Time Scheduling Method Using Hierarchical Decentralised Decision Makers For Flexible Manufacturing Systems”, Proceedings of the 30th International Matador Conference, pp. 719–726, 1993.
- Gupta, T., “An Expert System Approach In Process Planning: Current Development and Its Future”, Computers & Industrial Engineering, Vol. 18 No. 1, pp. 69–80, 1990.
- Zhang, H. C., Alting, L., “Expert Process Planning Systems: The State of The Art”, Proceedings of the 21st CIRP International Seminar on Manufacturing Systems, Stockholm Sweden, pp. 32–49, 1990.
- Fox, M. S., Smith, S. F., “ISIS - A Knowledge-Based System for Factory Scheduling”, Expert Systems, Vol. 1, pp.25, 1984.
- Kusiak, A., Chen, M., “Expert Systems for Planning and Scheduling Manufacturing Systems”, European Journal of Operational Research, vol 34, pp.113, 1988.
- Somlo, J., Watanabe, T., “Intelligent Scheduling of FMS: The Optimisation Approach”, JAPAN/USA Symposium on Flexible Automation, Vol. 1, pp. 447–455, ASME 1992.
- Zhang, H. C., Huang, S. H., “A Fuzzy Approach to Process Plan Selection”, International Journal of Production Research, Vol. 32, No. 6, 1994.
- Singh, N., Mohanty, B. K., A Fuzzy Approach to Multi-Objective Routing Problem with Application to Process Planning in Manufacturing Systems, International Journal of Production Research, Vol. 29 No. 6, pp. 1161–1170, 1991.
- Grabot, B., Geneste, L., Dispatching Rules in Scheduling: A Fuzzy Approach, International Journal of Production Research, Vol. 32 No. 4, pp. 903–915, 1994.
- Watanabe, T., Tokumaru, H., Nakajima, Y., Hashimoto, Y., Job-Shop Scheduling Using Fuzzy Inference to Take Profit into Account, JAPAN/USA Symposium on Flexible Automation, Vol. 1, pp. 423–427, ASME 1992
- Fukada, T., Tsukiyama, M., Mori, K., Scheduling Editor for Production Management with Human-Computer Co-operative Systems, Proceedings of the INCOM, pp. 221, 1989.
- Karr, C. L., Gentry, E. J., Fuzzy Control of pH Using Genetic Algorithms, IEEE Transactions on Fuzzy Systems, Vol. 1 No. 1, pp. 46–53, 1993.
- Ghosh, S., Gaimon, C., “Production Scheduling in a Flexible Manufacturing System with Setups”. IIE Transactions - Industrial Engineering Research & Development, Vol. 25 No. 5, pp. 21–35, 1993.
- Jane, S., Barber, K., Osterfeld, D., “Expert Simulation for On-Line Scheduling”, Communications of the ACM, Vol. 33 No. 10, pp.54, 1990.