232
Views
0
CrossRef citations to date
0
Altmetric
Articles

Developing a schedule integrated automated safety planning tool for residential construction projects

ORCID Icon &

References

  • Martínez-Rojas M, Martín Antolín R, Salguero-Caparrós F, et al. Management of construction safety and health plans based on automated content analysis. Autom Constr. 2020;120: 103362. https://doi.org/10.1016/j.autcon.2020.103362
  • Ashuro Z, Zele YT, Kabthymer RH, et al. Prevalence of work-related injury and its determinants among construction workers in Ethiopia: a systematic review and meta-analysis. J. Environ. Public Health. 2021;2021(7). https://doi.org/10.1155/2021/9954084
  • Vitharana VHP, De Silva GHMJS, De Silva S. Health hazards, risk and safety practices in construction sites – a review study. Eng J Inst Eng Sri Lanka. 2015;48(3):35–44. https://doi.org/10.4038/engineer.v48i3.6840
  • Abukhashabah E, Summan A, Balkhyour M. Occupational accidents and injuries in construction industry in Jeddah city. Saudi J Biol Sci. 2020;27(8):1993–1998. https://doi.org/10.1016/j.sjbs.2020.06.033
  • Tunji-Olayeni PF, Afolabi AO, Okpalamoka OI. Survey dataset on occupational hazards on construction sites. Data Br. 2018;18:1365–1371. https://doi.org/10.1016/j.dib.2018.04.028
  • Navon R, Kolton O. Model for automated monitoring of fall hazards in building construction. J Constr Eng Manag. 2006;21(1):21–28. https://doi.org/10.1061/(asce)0733-9364(2006)132:7(733)
  • Schwabe K, Teizer J, König M. Applying rule-based model-checking to construction site layout planning tasks. Autom Constr. 2019;97:205–219. https://doi.org/10.1016/j.autcon.2018.10.012
  • Kim H, Lee HS, Park M, et al. Automated hazardous area identification using laborers’ actual and optimal routes. Autom Constr. 2016;65:21–32. https://doi.org/10.1016/j.autcon.2016.01.006
  • Kim K, Cho Y, Zhang S. Integrating work sequences and temporary structures into safety planning: automated scaffolding-related safety hazard identification and prevention in BIM. Autom Constr. 2016;70:128–142. https://doi.org/10.1016/j.autcon.2016.06.012
  • Yi K-J, Langford D. Scheduling-based risk estimation and safety planning for construction projects. J Constr Eng Manag. 2006;132(6):626–635. https://doi.org/10.1061/(asce)0733-9364(2006)132:6(626)
  • Chantawit D, Hadikusumo BHW, Charoenngam C, et al. 4DCAD-Safety: visualizing project scheduling and safety planning. Constr Innov. 2005;5(2):99–114. https://doi.org/10.1191/1471417505ci091oa
  • Martinez JG, Gheisari M, Alarcón LF. UAV integration in current construction safety planning and monitoring processes: case study of a high-rise building construction project in Chile. J Manag Eng. 2020;36(3). 05020005. https://doi.org/10.1061/(asce)me.1943-5479.0000761.
  • Carter G, Smith SD. Safety hazard identification on construction projects. J Constr Eng Manag. 2006;132(2):197–205. https://doi.org/10.1061/(asce)0733-9364(2006)132:2(197)
  • Tixier AJP, Hallowell MR, Rajagopalan B, et al. Automated content analysis for construction safety: a natural language processing system to extract precursors and outcomes from unstructured injury reports. Autom Constr. 2016;62:45–56. https://doi.org/10.1016/j.autcon.2015.11.001
  • Esmaeili B, Hallowell M. Integration of safety risk data with highway construction schedules. Constr Manag Econ. 2013;31(6):528–541. https://doi.org/10.1080/01446193.2012.739288
  • Mihić M, Cerić A, Završki I. Developing construction hazard database for automated hazard identification process. Teh Vjesn. 2018;25(6):1761–1769. https://doi.org/10.17559/tv-20180417105624
  • Faghihi V, Nejat A, Reinschmidt KF, et al. Automation in construction scheduling: a review of the literature. Int J Adv Manuf Technol. 2015;81:1845–1856. https://doi.org/10.1007/s00170-015-7339-0
  • Navon R, Kolton O. Algorithms for automated monitoring and control of fall hazards. J Comput Civ Eng. 2007;132(7):733–740. https://doi.org/10.1061/(asce)0733-9364(2006)132:7(733)
  • Kim K, Teizer J. Automatic design and planning of scaffolding systems using building information modeling. Adv Eng Informatics. 2014;28(1):66–80. https://doi.org/10.1016/j.aei.2013.12.002
  • Ratnaningsih A, Dhokhikah Y, Fitria A. Hazard identification,: risk analysis and risk assessment on high-rise building construction project. AIP Conf Proc. 2018;02014; https://doi.org/10.1063/1.5042870
  • Ryu JH, McFarland T, Banting B, et al. Health and productivity impact of semi-automated work systems in construction. Autom Constr. 2020;120: 103396. https://doi.org/10.1016/j.autcon.2020.103396
  • Hossain MM, Ahmed S. Developing an automated safety checking system using BIM: a case study in the Bangladeshi construction industry. Int J Constr Manag. 2019;22(7):1206–1224. https://doi.org/10.1080/15623599.2019.1686833
  • Shah RK. A new approach for automation of location-based earthwork scheduling in road construction projects. Autom Constr. 2014;43:156–169. https://doi.org/10.1016/j.autcon.2014.03.003
  • Kim K, Cho Y, Zhang S . Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM. Automation in Construction. 2016;70:128–142. https://doi.org/10.1016/j.autcon.2016.06.012.
  • Memarian B, Mitropoulos P. Accidents in masonry construction: the contribution of production activities to accidents, and the effect on different worker groups. Saf Sci. 2013;59:179–186. https://doi.org/10.1016/j.ssci.2013.05.013
  • Hallowell MR, Gambatese JA. Activity-based safety risk quantification for concrete formwork construction. J Constr Eng Manag. 2009;135(10):990–998. https://doi.org/10.1061/(asce)co.1943-7862.0000071
  • Qazi A, Shamayleh A, El-Sayegh S, et al. Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo simulation approach. Sustain Cities Soc. 2021;65: 102576. https://doi.org/10.1016/j.scs.2020.102576
  • Zolfagharian S, Irizarry J, Ressang A, et al. Automated safety planning approach for residential construction sites in Malaysia. Int J Constr Manag. 2014;14(3):134–147. https://doi.org/10.1080/15623599.2014.926190

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.