Environmental risk assessment of dams at constructional phase using VIKOR and EFMEA methods (Case study: Balarood Dam, Iran)

, , &
Pages 1087-1107 | Received 23 Oct 2018, Accepted 09 Dec 2018, Published online: 22 Jan 2019

References

  • Arts J, Caldwell P, and Morrison-Saunders A. 2001. Environmental Impact Assessment Follow up: Good Practice and Future Directions Findings from a workshop at the IAIA 2000 conference. Impact Assessment and Project Appraisal. 19:175–185.
  • Azadeh A, Fam IM, and Azadeh MA. 2009. Integrated HSEE management systems for industry: A case study in gas refinary. J Chin Inst Chem Eng 32:235–41.
  • Bai J, Cui B, Xu X, et al. 2009. Heavy metal contamination in riverine soils upstream and downstream of a hydroelectric dam on the Lancang River, China. Environ Eng Sci 26:941–6.
  • Baker J, and Dobos R. 2004. Environmental Assessment Follow-up: A Framework for Environment Canada. Paper presented at the IAIA 2001, Cartagena.
  • Bluvband Z, Ltd A, and Dagan B. 2004. Expanded FMEA (EFMEA). Oren Nakar, MOTOROLA Israel Ltd., Tel-Aviv. 0-7803-8215-3/04/$17.00.
  • Danielsson M, and Gunnarsson SA. 2001. Guideline for Implementation of Environment Failure Mode and Effect Analysis Method, p 127. Marmait Publish, Sofia, Bulgaria.
  • Dipper B. 1998. Monitoring and post-auditing in environmental impact assessment: A review. J Environ Plann Manage 41:731–47.
  • Dipper B, Jones C and Wood CH. 2010. Monitoring and Post-auditing in Environmental Impact Assessment: A Review. J Environ Plan Manage 41 (6):731–47.
  • Harrald JR, Renda-Tanali I, Shaw GL, et al. 2006. Review of risk based prioritization/decision making. Methodologies for dams. The Georg Washington University Institute for Crisis Disaster and Risk Management, 1776 GS4 NW suite110, Washington DC.
  • Heller S. 2006. Managing industrial risk-having a tested and proven system to prevent and assess risk. J Hazard Mater 130:58–63.
  • Hosseinzadeh Lotfi F, and Fallahnejad R. 2010. Imprecise Shannon’s entropy and multi attribute decision making. Entropy 12:53–62.
  • Hui G, Johnson WMK, Keung C, et al. 2001. EIA Follow-ups: Opportunities or Limitations – Enforcement Experiences in EIA Recommendations. Paper presented at the IAIA 2000, Hong Kong.
  • Huang J, Li Z, and Liu HC. 2017. New approach for failure mode and effect analysis using linguistic distribution assessments and TODIM method. Reliab Eng Syst Saf 167:302–9.
  • Jahromi MB, and Raei R. 2012. Portfolio optimization using a hybrid of fuzzy ANP, VIKOR and TOPSIS. Manage Sci Lett 2:2473–84.
  • Jozi SA, Saffarian S, Shafiee M, et al. 2015. Safety, health, and environmental risk assessment of a gas power plant: A case study from southern Iran. Hum Ecol Risk Assess 21:1479–95.
  • Jozi SA, and Salati P. 2012. Environmental risk assessment of low density polyethylene unit using the method of failure mode. CI&CEQ 18:103–13.
  • Jozi SA, and Seyfosadat SH. 2014. Environmental risk assessment of Gotvand-olia Dam at operational phase using the integrated method of environmental failure mode and effects analysis (EFMEA) and preliminary hazard analysis. J Environ Stud 40:25–9.
  • Liu H-C, You J-X, and Duan C-Y. 2016. An integrated approach for failure mode and effect analysis under interval-valued intuitionistic fuzzy environment. Int J Prod Econ S0925 (5273):30067–1.
  • Masters C and Chapman C. 2009. Tillegra Dam Planning and Environmental Assessment Report. Prepared by Aurecon for Hunter Water Corporation, Newcastle, NSW.
  • Ministry of Power of Iran. 2010. Environmental Impact Assessment of Balarood Dam. Office of Hydropower Plant and Dam, Khuzestan Province, Iran, 1:154-165.
  • Ministry of Power of Iran. 2017. Environmental Risk Assessment of Jareh Dam. Office of Hydropower Plant and Dam, Khuzestan Province, Iran, 2: 210–12.
  • Morales-Torres A, Serrano-Lombillo A, Escuder-Bueno I, et al. 2016. The suitability of risk reduction indicators to inform dam safety management. Struct Infrastruct Eng 12:1465–76
  • Olsen SI, Christensen FM, Hauschild M, et al. 2001. Life cycle impact assessment and risk assessment of chemical-A Methodological Impact Assessment. Environ Impact Assess Rev 21:385–404.
  • Opricovic S, and Tzeng GH. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. Eur J Oper Res 156:445–55.
  • Opricovic S, and Tzeng GH. 2007. Extended VIKOR method in comparison with outranking methods. Eur J Oper Res 178:514–29.
  • Rezaian S, Jozi SA, and Zaredar N. 2016. Environmental risk assessment of a dam during construction phase. Global J Environ Sci Manage 2:345–56.
  • Sabzali Yameqani K, Abbasi M, and Aghaei M. 2016. Selection and assessing the optimal ERP system using ANP-VICOR approach in the Home Appliance Industry. Int J Humanities Cult Stud 421:2356–5926.
  • Sadler B. 1987. The evaluation of assessment: Post-EIS research and process development. In: Wathern P (ed), Environmental Impact Assessment: Theory and Practice. Unwin Hyman, London.
  • Samaras GD, Gkanas NI, and Vitsa KC. 2014. Assessing risk in dam projects using AHP and ELECTRE I. Int J Constr Manage 14:255–66.
  • Sayadi MK, Heydari M, and Shahanaghi K. 2009. Extension of VIKOR method for decision making problem with interval numbers. Appl Math Modell 33:2257–62.
  • Shahroodi K, Alipour H, and Faramarzi L. 2013. Providing a mathematical decision making model based on MCDM1) for selecting stocks (A Case Study: Saderat, Tejarat, and Mellat Banks in Rasht, Iran). Anthesis J Appl Basic Sci 1:196–204.
  • Shaffiee Haghshenas S, Lashteh Neshaei MA, Pourkazem P, et al. 2016. The risk assessment of dam construction projects using fuzzy topsis (Case study: Alavian Earth Dam). Eng Civil J 2:158–167.
  • Storey K, and Noble BF. 2004. Increasing the Utility of Follow-up in Canadian EA: A Review of Requirements, Concepts and Experience. A Report Prepared under Contribution Agreement with the Canadian Environmental Assessment Agency Research and Development Program. Hull, Quebec: CEAA.
  • Tosun H, Zorluer Ý, Orhan A, et al. 2007. Seismic hazard and total risk analyses for large dams in Euphrates basin. Turkey Eng Geol 89:155–70.
  • Wang QG, Du YH, Su Y, et al. 2012. Environmental impact post-assessment of dam and reservoir projects: A review. Procedia Environ Sci 13:1439–43.
  • Xin S, Ping N, Xiaolong T, et al. 2013. Environmental Risk Assessment System for Phosphogypsum Tailing Dams. Hindawi Publishing Corporation Sci World J 13:417432.
  • Zhang H, Chen G, and Luo Y. 2010. Basin hydropower development environmental impact post-assessment theory frame and considerations. Environ Sci Manage 35:176–8.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.