171
Views
0
CrossRef citations to date
0
Altmetric
Research Paper

Optimization of blending and production processes considering origin mines and metallurgical units using linear programming rules

, & ORCID Icon
Pages 115-121 | Received 23 Nov 2020, Accepted 21 Mar 2021, Published online: 05 Apr 2021

References

  • Ali, A. M., Wasly, Yang, H. S., Abdellah, W. R., & Jang, H. (2018). Optimization of blending operation for aswan phosphate mines using linear programming. Mining of Mineral Deposits, 12(4), 1–8. https://doi.org/10.15407/mining12.04.001
  • Ali, M. A. M., & Yang, H. S. (2012). Transportation problem: A special Case for Linear Programming Problems in Mining Engineering. International Journal of Mining Science and Technology, 22(3), 371–377. https://doi.org/10.1016/j.ijmst.2012.04.015
  • Azzamouri, A., & Giard, V. (2018). Dynamic blending as a source of flexibility and efficiency in managing a phosphate supply chain. 7th International Conference on Information Systems, Logistics and Supply Chain, ILS Conference, Lyon, France,
  • Bamoumen, M., Hilali, H., Hovelaque, V., Giard, V., & Rakiz, A. (2018). Flexi-Security stocks, a new approach for semi-raw materials used in blending. ILS Conference 2018, Jul 2018, Lyon, France. 25–34.
  • Bengtsson, J., Bredström, D., Flisberg, P., & Rönnqvist, M. (2013). Robust planning of blending activities at refineries. JORS, 64(6), 848–863.
  • Dagdelen, K., Topal, E., & Kuchta, M. (2000). Linear programming applied to scheduling of iron ore production, at the Kiruna Mine, Sweden. In: G. N. Panayiotou & T. N. Ikhalakopoulos (eds) Proceedings ninth international symposium on mine planning and equipment selection, Balkema, Rotterdam, pp 187–192.
  • Graham-Taylor, T. (1992). Production scheduling using linear and integer programming. In: Proceedings AusIMM annual conference, The Australasian Institute of Mining and Metallurgy, Melbourne, pp 159–1623.
  • Hoerger, S., Bachmann, J., Criss, K., & Shortridge, E. (1999). Long term mine and process scheduling at Newmont’s Nevada operations. 28th international symposium on computer applications in the minerals industries, Society for Mining, Metallurgy, and Exploration, Littleton, pp 740–748.
  • Ivanov, D., Sokolov, B., & Pavlov, A. (2013). Dual problem formulation and its application to optimal redesign of an integrated production–distribution network with structure dynamics and ripple effect considerations. International Journal of Production Research, 51(18), 5386–5403. https://doi.org/10.1080/00207543.2013.774503
  • Jung, S. Y., & Lim, J.-S. (2016). Optimization of gas lift allocation for improved oil production under facilities constraints. Geosystem Engineering, 19(1), 39–47. https://doi.org/10.1080/12269328.2015.1084895
  • Lamghari, A., & Dimitrakopoulos, R. (2012). A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. EJOR, 222(3), 642–652. https://doi.org/10.1016/j.ejor.2012.05.029
  • Liu, W. S., & Li, F. P. (2013). Iron ore blending based on linear programming. Applied Mechanics and Materials, 443, 657–661. https://doi.org/10.4028/www.scientific.net/AMM.443.657
  • Mostafa, M. M. A., El-Beblwi, M. A. Y., Hassan, A. A., El Sageer, M. T., & Mahrous, A. M. (2007) Comparison between Some Methods Used in Solving Transportation Problem. 10th International Conference on Mining, Petroleum and Metallurgical Engineering, Assiut University, Egypt. pp. 289–300 and 301–318.
  • Park, J. H., Oh, C., Han, Y.-S., & Ji, S.-W. (2016). Optimizing the addition of flocculants for recycling mineral-processing wastewater. Geosystem Engineering, 19(2), 83–88. https://doi.org/10.1080/12269328.2015.1099478
  • Park, S. B., Choi, Y., & Park, H.-S. (2016). Optimization of truck-loader haulage systems in an underground mine using simulation methods. Geosystem Engineering, 19(5), 222–231. https://doi.org/10.1080/12269328.2016.1176538
  • Ramazan, S. (2001) Open pit mine scheduling based on fundamental tree algorithm. Ph.D. thesis, Colorado School of Mines, Mining Engineering Department.
  • Ricciardone, J., & Chanda, E. K. (2001). Optimizing life of mine production schedules in multiple open pit mining operations: A study of effects of production constraints on NPV. Min. Resour. Eng, 10(3), 301–314. https://doi.org/10.1142/S0950609801000671
  • Saul, B. (1990). Optimizations of waste haulage with linear programming. In: R. K. Singhal (ed)Proceedings Mine Planning and Equipment Selection, Balkema, Rotterdam, 455–461.
  • Taghipour, A., & Frayret, J.-M. (2012). Dynamic mutual adjustment search for supply chain operations planning co-ordination. International Journal of Production Research, 51(9), 2715–2739. https://doi.org/10.1080/00207543.2012.737952
  • Thomas, G. S. (2001). Optimization of mine production scheduling—the state-of-the-art (pp. 441–444). The Australasian Institute of Mining and Metallurgy.
  • Williams, K. B., & Haley, K. B. (1959). A practical application of linear programming in the mining industry. Journal of Operation Research, 10(3), 131–137.
  • Yoon, W. B., Park, J. W., & Kim, B. Y. (1997). Linear Programming in Blending Various Components of Surimi Seafood. Journal of Food Science, 62(3), 561–564. https://doi.org/10.1111/j.1365-2621.1997.tb04430.x
  • Zegordi, S. H., Abadi, I. N. K., & Nia, M. A. B. (2010). A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain. Computers & Industrial Engineering, 58(3), 373–381. https://doi.org/10.1016/j.cie.2009.06.012
  • Zhang, R., Lu, J., & Zhang, G. (2011). A knowledge-based multi-role decision support system for ore blending cost optimization of blast furnaces. European Journal of Operational Research, 215(1), 194–203. https://doi.org/10.1016/j.ejor.2011.05.037

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.