References
- Afnor . 1992 . Gérer et assurer la qualité Afnor normes
- Aldanondo , M. Mereé C. 1991 . 477 – 484 . “Hierarchical data model for scheduling and monitoring in manufacturing systems,” IFIP CAPE 91, North-Holland
- Breuil , D. 1984 . “Outils de conception et de décision dans les organisations de gestion de production,” thése d'Etat de l'université de Bordeaux 1
- Cood , E. 1970 . Communication of the ACM. “A relational model of data storage for large scale data banks,”
- Doumeingts , G. 1990 . 89 – 103 . “Design and Specification Method for Production Systems,” CIM: integration aspects, Teknea
- Jones , A. and Saleh , A. 1990 . “A multi level/multi layer architecture for intelligent shop floor control,” . International Journal of CIM , 3 ( n° 1 )
- Scheer , A. 1989 . Enterprise Wide Data Modelling Springer & Verlag
- Weber , D. M. and Moodie , C. L. 1989 . “From Data Base System to information managment systems, a requirement for C.I.M and assembly,” IFIP WG5.7, North Holland
- Winter , R. E. 1991 . “On the utilization of an active, integrated database for the vertical integration of production planning and control,” . IFIP CAPE , 91 : 495 – 503 . North-Holland