48
Views
40
CrossRef citations to date
0
Altmetric
Original Articles

Heuristic procedures for resource—constrained project scheduling with minimal and maximal time lags: the resource—levelling and minimum project—duration problems

&
Pages 129-155 | Published online: 31 May 2012

REFERENCES

  • Ahuja , R. K. , Magnanti , T. L. and Orlin , J. B. 1993 . Network Flows. Prentice Hall . 1, Englewood Cliffs
  • Alvarez-Valdes , R. and Tamarit , J. M. 1989 . Advances in Project Scheduling. Edited by: Slowinski , R. and Weglarz , J. Elsevier . 2 Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis. In:, Amsterdam, 113–134
  • Bandelloni , M. , Tucci , M. and Rinaldi , R. 1994 . Optimal Resource Leveling Using Nonserial Dynamic Programming. . European Journal of Operational Research , 78 : 162 – 177 . 3
  • Bartusch , M. , Möhring , R. H. and Radermacher , F. J. 1988 . Scheduling Project Networks with Resource Constraints and Time Windows. . Annals of Operations Research , 16 : 201 – 240 . 4
  • Brinkmann , K. 1992 . Ph.D.Thesis 5 Planung von deterministischen Projekten mit beschränkten Ressourcen und zeitlichen Maximalabständen. University of Karlsruhe, Germany
  • Christofides , N. , Alvarez-Valdes , R. and Tamarit , J. M. 1987 . Project Scheduling with Resource Constraints: A Branch and Bound Approach. . European Journal of Operational Research , 29 : 262 – 273 . 6
  • Demeulemeester , E. and Herroelen , W. 1992 . A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem . Management Science , 38 : 1803 – 1818 . 7
  • Easa , S. M. 1989 . Resource Leveling in Construction by Optimization. . Journal of Construction Engineering and Management , 115 : 302 – 316 . 8
  • Gewald , K. , Kasper , K. and Schelle , H. 1972 . Netzplantechnik, Band 2: Kapazitätsoptimierung. 9 Oldenbourg, München
  • Harris , R. B. 1990 . Packing Methods for Resource Leveling. . Journal of Construction Engineering and Management , 116 : 331 – 350 . 10
  • Kolisch , R. 1995 . Project Scheduling under Resource Constraints. 11 Physica, Heidelberg
  • Mingozzi , A. , Maniezzo , V. , Ricciardelli , S. and Bianco , L. 1994 . Working Paper 12 An Exact Algorithm for Project Scheduling with Resource Constraints Based on a New Mathematical Formulation. University of Bologna
  • Neumann , K. and Morlock , M. 1993 . Operations Research. 13 Carl Hanser, München
  • Neumann , K. and Schwindt , C. 1995 . Report WIOR-447 14 Projects with Minimal and Maximal Time Lags—Construction of Activity-on-Node Networks and Applications. Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe, submitted to OR Spektrum
  • Neumann , K. and Zhan , J. 1995 . Heuristics for the Minimum Project-Duration Problem with Minimal and Maximal Time Lags under Fixed Resource Constraints. . Journal of Intelligent Manufacturing , 6 : 145 – 154 . 15
  • Schwindt , C. 1995 . Report WIOR-449 16 ProGen/max: A New Problem Generator for Different Resource-Constrained Project Scheduling Problems with Minimal and Maximal Time Lags. Institut für Wirtschaftstheorie und Operations Research, University of Karlsruhe
  • Seibert , J. E. and Evans , G. W. 1991 . Time-Constrained Resource Leveling. . Journal of Construction Engineering and Management , 117 : 503 – 520 . 17
  • Stinson , J. P. , Davis , E. W. and Khumawala , B. M. 0978 . Multiple Resource-Constrained Scheduling Using Branch and Bound. . AIIE Transactions , 10 : 252 – 259 . 18
  • Talbot , F. B. and Patterson , J. H. 0978 . An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems. . Management Science , 24 : 1163 – 1174 . 19
  • Zhan , J. 1994 . Heuristics for Scheduling Resource-Constrained Projects in MPM Networks. . European Journal of Operational Research , 76 : 192 – 205 . 20

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.