References
- Ang, A. H.-S., and W. H. Tang. 2007. Probability Concepts in Engineering. Hoboken, NJ: Wiley.
- Ball, J., M. Babister, R. Nathan, W. Weeks, E. Weinmann, M. Retallick, and I. Testoni, eds. 2016. Australian Rainfall and Runoff: A Guide to Flood Estimation. Commonwealth of Australia.
- Benjamin, J. R., and C. A. Cornell. 1970. Probability, Statistics and Decisions for Civil Engineers. New York: McGraw-Hill.
- Botto, A., D. Ganora, F. Laio, and P. Claps. 2014. “Uncertainty Compliant Design Flood Estimation.” Water Resources Research 50 (5): 4242–4253.10.1002/2013WR014981
- DeGroot, M. H. 1970. Optimal Statistical Decisions. New York: McGraw-Hill.
- Doran, D. G., and D. H. Pilgrim. 1986. “Choice between Flood Estimates Based on Design Rainfalls and Flood Frequency Analyses.” Transactions of the Institution of Engineers, Australia. Civil engineering 28: 74–91.
- Hill, P., J. Jing Zhang, and R. Nathan. 2016. Australian Rainfall and Runoff Revision Project 6: Loss Models for Catchment Simulation Stage 4a. Geoscience Australia. Canberra.
- Humphreys, R. L. 2009. Crawford Munro: A Vision for Australia’s Water. Crows Nest, NSW: Engineers Media.
- IACWD (Interagency Advisory Committee on Water Data). (1982). Guidelines for Determining Flood Flow Frequency. Bulletin 17B of the Hydrology Sub-committee. Office of Water Data Coordination, Geological Survey, U.S. Dept of the Interior. Reston.
- Johnson, F., C. J. White, A. van Dijk, M. Ekstrom, J. P. Evans, D. Jakob, A. S. Kiem, M. Leonard, A. Rouillard, and S. Westra. 2016. “Natural Hazards in Australia: Floods.” Climatic Change 139: 21–35. doi:10.1007/s10584-016-1689-y.
- Kiem, A. S., S. W. Franks, and G. Kuczera. 2003. “Multi-Decadal Variability of Flood Risk.” Geophysical Research Letters 30 (2): 1035:1–4.
- Kuczera, G. 1990. “Estimation of Runoff-routing Model Parameters Using Incompatible Storm Data.” Journal of Hydrology 114 (1-2): 47–60.10.1016/0022-1694(90)90074-8
- Kuczera, G., and B. J. Williams. 1992. “Effect of Rainfall Errors on Accuracy of Design Flood Estimates.” Water Resources Research 28 (4): 1145–1153.10.1029/91WR03002
- Lempert, R. J., and M. T. Collins. 2007. “Managing the Risk of Uncertain Threshold Responses: Comparison of Robust, Optimum, and Precautionary Approaches.” Risk Analysis 27 (4): 1009–1026.10.1111/risk.2007.27.issue-4
- Loveridge, M., M. Babister, and M. Retallick. 2015. Australian Rainfall and Runoff Revision Project 3: Temporal Patterns of Rainfall, Stage 3 Report. ARR Report number P3/S3/013. ISBN 978-085825-9614.
- Micevski, T., and G. Kuczera. 2009. “Combining Site and Regional Flood Information Using a Bayesian Monte Carlo Approach.” Water Resources Research 45: 1–1. doi:10.1029/2008WR007173.
- Pilgrim, D. H., ed. 1987. Australian Rainfall and Runoff: A Guide to Flood Estimation. Barton, ACT: Institution of Engineers, Australia.
- Pui, A., A. Lal, and A. Sharma. 2011. “How Does the Interdecadal Pacific Oscillation Affect Design Floods in Australia?” Water Resources Research 47, W05554: 1–13.
- Rahman, A., P. E. Weinmann, T. M. T. Hoang, and E. M. Laurenson. 2002. “Monte Carlo Simulation of Flood Frequency Curves from Rainfall.” Journal of Hydrology 256: 196–210.10.1016/S0022-1694(01)00533-9
- Rosbjerg, D., G. Blöschl, D. H. Burn, A. Castellarin, B. Croke, G. D. Baldassarre, V. Iacobellis, et al. 2013. “Prediction of Floods in Ungauged Basins.” In Runoff Prediction in Ungauged Basins: Synthesis across Processes, Places and Scales, edited by G. Blöschl, M. Sivapalan, and T. Wagener. Cambridge University Press, Cambridge: 189–226.
- Slack, J. R., J. R. Wallis, and N. C. Matalas. 1975. “On the Value of Information to Flood Frequency Analysis.” Water Resources. Research 11 (5): 629–647.10.1029/WR011i005p00629
- Taleb, N. 2010. The Black Swan: The Impact of the Highly Improbable. 2nd ed. New York: Random House.
- Vance, T. R., J. L. Roberts, C. T. Plummer, A. S. Kiem, and T. D. van Ommen. 2015. “Interdecadal Pacific Variability and Eastern Australian Mega-droughts over the Last Millennium.” Geophysical Research Letters 41 (1): 437–451.